40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 271 of 341  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  3547   Wed Sep 8 16:17:58 2010 steveUpdatePEMparticle counter problemI played with the particle counter this
morning. Now it's running and reading the
correct numbers on the old COCHECKLIST.adl
  
  3546   Wed Sep 8 14:44:37 2010 josephbUpdateCDSUpdated parse_mdl_to_ipc.py and feCodeGen.plI updated parse_mdl_to_ipc.py to correctly
work with the 3 new cdsIPCx parts, namely
cdsIPCx_PCIE (for dolphin connections), cdsIPCx_RFM
  
  3545   Wed Sep 8 11:56:24 2010 kiwamuSummaryCDSSeptember CDS test plan Joe and Kiwamu
We discussed about our CDS plan for
this September. The summary of the plan
  
  3544   Wed Sep 8 11:46:53 2010 kiwamuUpdatePSLupdate of the layoutI put some
green stuff on the layout drawing.
 40mPSL.png 
  3543   Wed Sep 8 09:50:13 2010 ranaUpdatePSLPSL updateAlso, Kiwamu has modified the layout drawing
to add the green PLL stuff. This has collapsed
the reference cavity's wave function placing
  
  3542   Wed Sep 8 00:01:07 2010 rana, valeraUpdatePSLPMC updateWe ran the cables for the PMC: The RF cable
for the 35.5 MHz drive was cheap and so we
swapped the 29.5 MHz cable for it.
  
  3541   Tue Sep 7 23:49:08 2010 sanjitConfigurationComputersaldabella network configuration 
added name server 192.169.113.20
as the first entry in /etc/resolv.conf
  
  3540   Tue Sep 7 23:34:15 2010 Kiwamu, SanjitConfigurationComputerse-loge-log was repeatedly hanging and several
attempts to start the daemon failed.
problem was solved after clearing
  
  3539   Tue Sep 7 23:17:45 2010 sanjitConfigurationComputersrossa notes

    

       
            
  
  3538   Tue Sep 7 22:21:47 2010 DmassConfigurationelogelog restarted


   
        
            
  
  3537   Tue Sep 7 22:21:17 2010 AlbertoConfigurationComputerselog restarted    
  3536   Tue Sep 7 20:44:54 2010 YoichiHowToCOMSOL TipsCOMSOL example for calculating mechanical transfer functionsI added COMSOL example files to the 40m
svn to demonstrate how to make transfer function
measurements in COMSOL.
  
  3535   Tue Sep 7 15:57:07 2010 AlbertoConfigurationComputersNodus connection not working. Fixed[Joe, Alberto]
The Nodus connection to the Martian
network stopped working after someone switched
  
  3534   Tue Sep 7 15:31:28 2010 josephb, alexUpdateCDSBinary Output working/ IO chassis fixedAs noted previously,
we were having problems with getting multiple
32 channel binary output cards working. 
  
  3533   Tue Sep 7 14:42:02 2010 DmassConfigurationelogelog restartedelog crashed on an upload. restarted and
it worked fine with the same file.
  
  3532   Tue Sep 7 13:31:49 2010 AlbertoUpdateElectronicsRF System - Frequency Distribution Box - Priority PlanWe need a distribution unit in the LSC
rack to: 1) collect the demod signals coming
from the Frequency Generation Box 2) adjust
 Visio-RFsystem_plan_distributiont.pngRFsystem_plant_distribution_priority.png 
  3531   Tue Sep 7 10:50:53 2010 josephbConfigurationComputersrossa notesThe controls group is user id 500 by default
on most new machines.  Unfortunately, the
user ID used across the already existing
  
  3530   Tue Sep 7 08:56:00 2010 AlbertoUpdateElectronicsFrequency Generation Box Assembly - Phase Noise MeasurementsHere are the results of my phase noise
measurements on the 7 outputs of the Frequency
Generation Box. (BIN=95L applied by DTT).
 2010-09-03_FreqBoxPhaseNoise_AllOutputsComparison_smooth.png2010-09-03_FreqBoxPhaseNoise_AllOutputsComparison_smooth.pdf 
  3529   Mon Sep 6 22:09:11 2010 AlbertoUpdateElectronicsRF Frequency Generation Box heat sink installed and testedLast week I noticed that the high power
amplifiers in the Frequency Generation Box
became hot after 2 hours of continuous operation
 DSC_2467.JPG2010-09-06_FreqBoxAmplifierTemperatureTrend.pngDSC_2433.JPG 
  3528   Mon Sep 6 21:08:44 2010 ranaUpdateCDSSusension model reviewedWe must remember
that we are using the Rev.B
SOS Coil Drivers and not the Rev. A. 
  
  3527   Mon Sep 6 20:38:58 2010 KojiUpdateCDSSusension model reviewedI have reviewed the suspension model of
C1SUS and refined it.
It is comaptible to the current one
 suspension_model.pdf 
  3526   Mon Sep 6 10:08:10 2010 AlbertoConfigurationComputersNetgear Network Switch fan broken.The Netgear Network Switch in the top shelf
of Nodus' rack has a broken fan. It is the
one interfaced to the Martian network.
  
  3525   Mon Sep 6 01:46:58 2010 ranaUpdatePSLPSL update of the dayTo bypass the polarizer issue, I just used
cubes. One I took from the FSS-Refcav path
and the other from the power control part
  
  3524   Sun Sep 5 21:35:41 2010 ranaConfigurationComputersrossa notes**** Deleted
apps/emacs
apps/linux64/firefoxold
  
  3523   Fri Sep 3 23:42:34 2010 JenneUpdatePSLPSL update of the dayRana and I were poking around on the PSL
table today, getting a few more items raised
to the correct height.
  
  3522   Fri Sep 3 13:04:30 2010 KojiFrogsElectronicsCable cutting toolsYeah, this looks nice.
And I also like to have something
I have attached. This is "HOZAN P-90",
 P90.jpg 
  3521   Fri Sep 3 11:23:16 2010 josephbConfigurationComputersrossa nvidia driver and dual monitor configurationAt LLO the machines are running Centos 5.5.
 A quick login confirms this.  Specifically
the release is 2.6.18-194.3.1.el5.



  
  3520   Fri Sep 3 11:03:41 2010 AlbertoFrogsElectronicsCable cutting toolsI found this very interesting German maker
of cool cable cutting tools. It's called
Jokari.
  
  3519   Fri Sep 3 06:55:42 2010 ranaUpdatePSLPSL beam hitting the PMC!NPRO
Koji and I inspected and photographed
the laser after opening up its case. I then
  
  3518   Thu Sep 2 23:35:33 2010 ranaConfigurationComputersrossa nvidia driver and dual monitor configurationWhy are we running CentOS 4.8 instead of
5.5 ?    What runs at LLO?    
What runs in Downs?
  
  3517   Thu Sep 2 21:22:31 2010 Sanjit, KojiConfigurationComputersrossa nvidia driver and dual monitor configuration 
Simple steps (but don't try these
on a working computer without getting some
  
  3516   Thu Sep 2 17:43:30 2010 josephbUpdateCDSOne working BO output module, others not so much Joe and Kiwamu:
We found one bug in the RCG code,
where the second input for the CDO32 part
  
  3515   Thu Sep 2 16:45:48 2010 josephbUpdateCDSNumbering scheme of the PCI busRolf has recently written a document describing
how one should fill out an IO chassis and
how the numbering works out.  This can
  
  3514   Thu Sep 2 16:41:32 2010 steveConfigurationSAFETYlaser is ON: safety glasses required!I hooked up interlock to the Innolight
2W 1064 nm in the enclosure. The manual shutter 
is closed on this unit.
  
  3513   Thu Sep 2 14:11:17 2010 steveSummaryPEMsouth end crane balancing is completedThe crane I -beam now leveled at all degrees
of rotation.  The lower hinge was moved
southward  about 1/4 of an inch. 
 P1060798.JPGP1060800.JPGP1060804.JPG 
  3512   Thu Sep 2 01:48:23 2010 JenneFrogsTreasureNot cool....This totally creeped me out when I found
it wandering around on the floor not so far
from my desk:
 CreepyBug.jpg 
  3511   Thu Sep 2 01:44:13 2010 JenneUpdatePSLPSL beam hitting the PMC![Rana, Jenne]
More PSL progress. 
The new laser was raised to a 4 inch
  
  3510   Wed Sep 1 17:17:42 2010 ranaUpdateElectronicsFSS Box Phase Noise from DAQ - Measurement setup modifiedWith the setup now working, we should now
test the power filtering for the crystal
and amplifier.
  
  3509   Wed Sep 1 16:29:28 2010 AlbertoUpdateElectronicsFSS Box Phase Noise from DAQ - Measurement setup modified


   
        
            
 2010-09-01_FSSPhaseNoise_DAQ_00-02_comparison.png2010-09-01_FSSPhaseNoise_DAQ_02.pngFSSphaseNoiseMeasurementSetup02.png 
  3508   Wed Sep 1 12:34:14 2010 ranaUpdateElectronicsFSS Box Phase Noise from DAQThe differences between this setup and
the one used previously is the lack of the
50 Ohm terminator in the mixer output and
  
  3507   Wed Sep 1 12:24:47 2010 josephbUpdateCDSTrying to get up to date CDS code runnningAlex, Joe:
We copied the latest x02 to c1x02
and modified to our the config block in it.
  
  3506   Wed Sep 1 11:34:39 2010 AlbertoUpdateElectronicsFSS Box Phase Noise from DAQI measured the phase noise of the LO output
of the FSS box from the DAQ. I'm attaching
the results.
 2010-09-01_FSSPhaseNoise.png2010-09-01_FSSphaseNoiseMeasurementSetup.png 
  3505   Wed Sep 1 10:54:15 2010 steveUpdatePEM more crane balancing Crane balancing at the south end is continuing
today.
  
  3504   Wed Sep 1 08:40:28 2010 AlbertoConfigurationElectronicsPMC board unplugged, turned on Sorensen switches on 1Y1 rack


   
        
            
  
  3503   Wed Sep 1 08:36:59 2010 KojiHowToPSL2W NPRO Mount designed with emachineshop.com software1. I can not see whether the attaching
surface is flat or not.
It should have ~1mm step to avoid
  
  3502   Wed Sep 1 08:28:43 2010 KojiUpdatePSLPSL upgrade update


   
        
            
  
  3501   Wed Sep 1 07:52:27 2010 AlbertoConfigurationElectronicsPMC board unplugged, turned on Sorensen switches on 1Y1 rackToday I put the FSS frequency box back
into the 1Y1 rack.
To power it on, I turned on the 24V
  
  3500   Tue Aug 31 19:46:00 2010 ranaUpdatePSLPSL upgrade update
    Steve is handling the mount
height increase for the PMC and RC steering
mirrors, as well as a mount (non-steerable)
  
  3499   Tue Aug 31 17:58:38 2010 AlbertoUpdateElectronicsFSS Frequency Generation Box - Phase NoiseA few weeks ago, on Jul 24, Rana and I
measured the phase noise of the FSS frequency
box (aka the 'Kalmus Box'). See elog entry
 2010-08-31_FSSPhaseNoise04modified.png 
  3498   Tue Aug 31 16:42:26 2010 josephbUpdateCDSTemporarily reverting to CDS revision 2005Apparently updating to the latest revision
of the RCG has some issues with diaggui and
awgtpman.  Alex had to do some recompiling
  
ELOG V3.1.3-