40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 271 of 354  Not logged in ELOG logo
ID Dateup Author Type Category Subject Text Attachments
  13595   Wed Jan 31 22:32:11 2018 gautamUpdateALSALS signal chain + power budgetSummary:

 FiberALS_PowerBudget.pdfpreampProposed.pdf 
  13596   Thu Feb 1 01:24:56 2018 gautamUpdateALSD0902745 revamp underwayI effected the change to the Audio IF preamp
stage on channels 3 and 4 (Xarm and Yarm
respectively) using the resistors Steve ordered
 PSLinterlock.png 
  13597   Thu Feb 1 15:31:12 2018 gautamUpdateALSALS signal chain + power budgetSummary:

A
  
  13598   Thu Feb 1 16:09:13 2018 KiraUpdatePEMSeismometer can insulation testAfter taking the measurements, calibrating
them (approximately), and filterting them,
I created the following plot. The exponential
 cooling_fit.png 
  13599   Fri Feb 2 00:26:34 2018 gautamUpdateALSD0902745 revamp underwayI saw some interesting behaviour of the
Audio IF amplifier stage on the demod board
today, by accident. I was testing the board
  
  13600   Fri Feb 2 13:16:55 2018 gautamUpdateALSALS signals whitening switchingWhile setting up for this measurement,
I noticed something odd with the whitening
switching for the ALS channels. For the usual
 ALS_whitening_switching.pdfALS_whitening_switching_works.pdf 
  13601   Fri Feb 2 21:12:46 2018 Udit KhandelwalSummaryGeneralSummary - 2018/02/02Tip-Tilt
Suspension CAD:
Discussed with Koji about motivation
  
  13602   Fri Feb 2 22:47:00 2018 KojiSummaryGeneralAP1053: Packaging & PerformanceI've packaged an AP1053 in a Thorlabs
box. The gain and the input noise level were
measured. It has the gain of ~10 and the
 AP1053.JPGAP1053_measurement.pdfAP1053_gain.pdfAP1053_noise.pdf 
  13603   Fri Feb 2 23:28:13 2018 KojiUpdateComputer Scripts / Programsnetgpib data missing / PROLOGIX yellow box (crocetta) not workingI could not understand why 'netgpibdata'
scripts are missing in "scripts/general"
folder on pianosa... Where did they go???
  
  13604   Sat Feb 3 13:03:45 2018 gautamUpdateComputer Scripts / Programsnetgpib data missing / PROLOGIX yellow box (crocetta) not workingThe netgpibdata scripts are now under git
version control at 
  
  13605   Mon Feb 5 12:12:41 2018 KiraUpdatePEMSeismometer can insulation testAttached the program I used to create the
plot

 temp_data.py 
  13606   Mon Feb 5 14:11:01 2018 gautamUpdateALSHuge harmonics in ALS channelsI've been trying to setup for the THD
measuremetn at the LSC rack for a couple
of days now, but am plagued by a problem
 ALSpowerlineHarmonics.pdf2A1B3AC4-4059-416A-AD88-8AB0431D7A55.jpeg 
  13607   Mon Feb 5 18:04:35 2018 KojiUpdateComputer Scripts / Programsnetgpib data missing / PROLOGIX yellow box (crocetta) not workingcrochetta was reconfigured to have 192.168.113.108.
It was confirmed that it can be used with
netgpibdata.py
  
  13608   Mon Feb 5 22:57:28 2018 gautamUpdateALSHuge harmonics in ALS channelsDid some quick additional checks to figure
out what's going on here.


The SOS/dewhite board for
  
  13609   Tue Feb 6 11:13:26 2018 gautamUpdateALSPossible source of ground loop identifiedI think I've narrowed down the source
of this ground loop. 
 A68AF89C-E8A9-416D-BBD2-A1AD0A51E0B5.jpeg 
  13611   Tue Feb 6 16:58:19 2018 KiraUpdatePEMtemperature measurementsI decided to plot the temperatures measured
over two days for the sensor inside the can
and inside the lab just to see if there was
 temps.png 
  13612   Tue Feb 6 22:55:51 2018 gautamUpdateALSPossible source of ground loop identified[koji, gautam]

We discussed possible solutions
  
  13613   Wed Feb 7 10:16:26 2018 gautamUpdateALSALS signal chain + power budgetAfter emailing the technical team at Menlo,
I have uploaded the more detailed information
they have given me on our wiki.
  
  13614   Wed Feb 7 12:35:56 2018 KiraUpdatePEMSeismometer can insulation testI subtracted out the lab temperature change
during the period of cooling to see if it
would have a significant effect on the time
 fit_1.png 
  13615   Wed Feb 7 15:50:42 2018 SteveUpdateVACIFO pressure monitoringHornet cold cathode gauge analoge output 
[ DSub9 pin 3 and 7 ] are wired to go ETMX
Acromag. It was reading 4.9V at 7.8e-6 Torr
 CC_analog.png 
  13616   Wed Feb 7 15:51:15 2018 gautamUpdateALSD0902745 revamp completeSummary of my tests of the demod boards,
post gain modification:


DC tests (supply voltage,
 6613CD37-5014-44AE-B1FE-6F6A8137DF62.jpeg 
  13617   Wed Feb 7 16:09:06 2018 SteveUpdateSUSETMX -15V dc correctedThe ETMX  Sorrenson power supply -15V
was running at -13.9V
  
  13618   Wed Feb 7 17:01:25 2018 gautamUpdatePEMPID test plan[kira,
gautam]
 ADC_EX.pngDAC_EX.pngIMG_20180207_170628.jpgdac_adc.jpgIMG_20180207_165833.jpg 
  13619   Wed Feb 7 19:14:19 2018 ranaUpdatePEMPID test plan
The heater circuit should get its
own dedicated supply.
We do not
want to ever use the old Ref Cav heater for
  
  13620   Thu Feb 8 00:01:08 2018 gautamUpdateCDSVertex FEs all crashedI was poking around at the LSC rack to
try and set up a temporary arrangement whereby
I take the signals from the DAC differentially
 CDSrecovery_20180207.png 
  13621   Thu Feb 8 00:33:20 2018 gautamUpdateALSD990694 characterization / THD measurement planI decided to try doing the THD measurement
with a function generator. Did some quick
trials tonight to verify that the measurement
 D990694THD_trial.pdf 
  13622   Thu Feb 8 01:27:16 2018 KojiUpdateALSD990694 characterization / THD measurement plan>
So my question is - should we just cut the
  
  13623   Thu Feb 8 12:00:09 2018 gautamUpdateALSD990694 is NOT differential receivingCorrecting a mistake   
  13624   Thu Feb 8 12:24:37 2018 KiraUpdatePEMPID test planSome points before we can set up the can:


Cable length and type

For
the DAC, we can use the LEMO outputs and
  
  13625   Thu Feb 8 13:13:14 2018 gautamUpdateALSD990694 pulled outAfter labeling all cables, I pulled out
one of the D990694s in the LSC rack (the
one used for the ALS X signals, it is Rev-B1,
 IMG_5131.JPGIMG_5133.JPGD990694-B_cuttingPlan.pdf 
  13626   Thu Feb 8 17:32:44 2018 KiraUpdatePEMPID test plan[Kira, Steve]

We set up a new rail for the Sorensens
(attachment 1) and placed one of them down
 IMG_20180208_171423.jpgIMG_20180208_172107.jpgIMG_20180208_171853.jpgIMG_20180208_171932.jpg 
  13627   Thu Feb 8 18:10:36 2018 gautamUpdateALSD990694 pulled outThis is proving much more challenging than
I thought - while Cut #1 was easy to identify
and execute, my initial plan for Cut #2 seems
  
  13628   Fri Feb 9 13:37:44 2018 gautamUpdateALSTHD measurement trialI quickly put together some code that calculates
the THD from CDS data and generates a plot
(see e.g. Attachment #1).
 THD_trial.pdf 
  13629   Fri Feb 9 15:29:32 2018 KiraUpdatePEMPID test plan[Kira, Steve]

We installed and labeled the
Sorensens today.
 IMG_20180209_152158.jpg 
  13630   Mon Feb 12 14:56:00 2018 SteveUpdatesafety crane inspection 2018Our 3 cranes passed  professional 
inspection. Fred Goodbar of Konacrane with
450 lbs load at full extension.
 ETMY.jpgVetex.jpgETMX.jpg 
  13631   Tue Feb 13 21:22:44 2018 SteveUpdateSEIone load cells testedGautam and Steve,

The "called 225 lbs"
steel crane load measured right on 102 kg
 as_measured_102kg.jpgsensor.jpg1500lbs_load__cell.jpg 
  13632   Tue Feb 13 22:35:21 2018 gautamUpdateElectronicsPSL table power supply cleanupThe main motivation
for this work is that I want +15VDC power
  
  13633   Wed Feb 14 17:49:22 2018 gautamUpdateElectronicsPSL table power supply cleanup[steve,
gautam]
 IMG_5135.JPGSorensens_1X1_before.JPGSorensens_1X1_after.JPG 
  13634   Thu Feb 15 16:03:57 2018 KiraUpdatePEMPID test planI checked channels 6 and 7 on the ADC and
they have long wires leading to BNC ends
and are currently not being used, so we could
  
  13635   Fri Feb 16 01:09:55 2018 gautamUpdateALSEX green locking duty cycleI have been puzzled as to why the duty
cycle of the EX
green locks are much
 GreenLock8hrs.png 
  13636   Fri Feb 16 01:34:40 2018 gautamUpdateALSD0902745 in-situ testingHaving implemented the changes to the audio
amplifier stage, I re-installed this unit
at the LSC rack, and did some testing. 
 BeatMouthX_20180216.pdfIMG_5134.JPG 
  13637   Fri Feb 16 15:57:58 2018 SteveUpdateVACTP3 drypump replacedThe forline pressure of TP3 was 399 mTorr

It was replaced this morning at 
TP3 controller 134,638hrs with the "failed
  
  13638   Fri Feb 16 21:03:17 2018 Udit KhandelwalSummaryGeneralSummary 2018/02/1640m Lab Cad:
Updated the dimensions of and fleshed
out the chambers in greater detail, by referring
  
  13639   Fri Feb 16 22:15:30 2018 gautamUpdateGeneralc1mcs model restartedc1mcs
had died for some reason. Looking at dmesg,
  
  13640   Fri Feb 16 22:19:07 2018 gautamUpdateGeneralFibel ALS input polarization tuningAfter discussing with Koji, I decided to
try and align the input beam polarization
at the PSL fiber coupler to one of the special
 PER_setup.JPG 
  13641   Mon Feb 19 14:27:25 2018 gautamUpdateGeneralFibel ALS input polarization tuningSummary:

Current configuration of PSL free-space
to fiber coupling is:
 IMG_6900.JPG 
  13642   Tue Feb 20 13:59:30 2018 KojiUpdateGeneralModulation depth measurement for an aLIGO EOMLast night I worked at the PSL table for
the modulation depth measurement for an aLIGO
EOM. Let me know if the IFO behavior is unusual.
  
  13643   Tue Feb 20 21:14:59 2018 gautamUpdateCDSRFM network errorsI wanted to lock the single arm POX/POY
config to do some tests on the BeatMouth.
But I was unable to.
  
  13644   Tue Feb 20 23:08:27 2018 gautamUpdateALSD0902745 in-situ testingAttachment #1 shows
the ALS noise measurement today. Main differences
from the spectrum posted last week is that
 BeatMouthX_20180220_diffOut.pdf 
  13645   Wed Feb 21 00:04:27 2018 gautamUpdateElectronicsTemporary RF power monitor setupI made a voltage divider using a 20.47kohm
and 1.07kohm (both values measured with a
DMM). The whole thing is packaged inside
 RFbeatAmp.pngBeatMouthX_RFAM_20180221.pdf 
ELOG V3.1.3-