40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 265 of 357  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  4657   Sat May 7 10:59:11 2011 SureshUpdateRF SystemRF Source filters changed 
The
SLP-50 filters which were on the 55 MHz lines
 RF_Source_Schematic.pngRF_Source.jpg 
  4656   Sat May 7 02:52:53 2011 kiwamuUpdateLSCTRY photo diode installed[Suresh / Kiwamu]
 We
installed the TRY photo diode (Thorlabs one)
  
  4655   Fri May 6 17:11:55 2011 steveUpdateSUSSRM-oplev cable The SRM qpd cable was removed from the
BS-table. It's path was changed from 1x4
to ITMY-table following the inner cable tray.
  
  4654   Fri May 6 15:59:40 2011 steveUpdateVACTP3 fore pump replacedDry fore pump of TP3 replaced by brand
new Varian SH-110  at  1.1 Torr_75,208
hrs
  
  4653   Fri May 6 15:42:55 2011 valeraMetaphysicsIOOInput mode cleaner length and 11 MHz modulation frequency After Kiwamu set the REFL11 phases
in the PRMI configuration (maximized PRM->REFL11I
reesponse) I tried to measure the MC length
  
  4652   Fri May 6 14:59:36 2011 Leo SingerConfigurationSUSTuning ITMY bandstopI tuned the ITMY bandstops -- 'before'
and 'after' spectra attached.  Note
that the after the tuning, the bounce mode
 itmy-before.pdfitmy-after.pdfitmy-nobounceroll.pdf 
  4651   Fri May 6 10:20:00 2011 steveSummarySAFETY2011 safety auditThe emphasis of this annual safety audit 
was on  safe  electrical housekeeping
on March 3, 2011
 sa2011done1.pdfP1070448.JPG 
  4650   Fri May 6 06:36:18 2011 SureshUpdateRF SystemPD DC signals at each port connectedWe now
have the DC signal from three PDs available
in the ADC channels 14,15 and 16.  The
  
  4649   Fri May 6 01:27:12 2011 KojiSummaryGeneralaLIGO BBPD / Green PD investigationMinicircuits
ERA-5SM was used for the RF
amp of the BBPD. This amp is promising
 PD_response.pdfFFD-100_AP389_MCL.pdf 
  4648   Thu May 5 20:47:41 2011 KojiUpdatePSLPMC alignedThe PMC exhibited the reduction of the
transmission, so it was aligned.
The misalignment was not the angle
  
  4647   Thu May 5 18:38:01 2011 ranaSummaryCDSSub-system TRAMP adjustmentsI think
that the gain ramping time (_TRAMP) should
  
  4646   Thu May 5 17:19:21 2011 Leo SingerConfigurationSUSTuning notch filters for bounce mode suspensionsI am tuning the notch filters for the bounce
modes in the suspensions, starting with the
ITMs and ETMs.  I'll do the MCs, the
 itmx-before.pdfitmx-before.pdfitmx-withbounceroll.pdftimx-nobounceroll.pdf 
  4645   Thu May 5 16:11:22 2011 JamieUpdateLSCchans file for LSC


   
        
            
  
  4644   Thu May 5 15:33:37 2011 steveConfigurationRF SystemLSC rackNew right angle PVC front panel with SMA
bulkhead connectors are in place. The connections
are still lose. It is ready for Suresh to
 P1070641.JPGP1070639.JPG 
  4643   Thu May 5 15:28:23 2011 kiwamuUpdateLSCRe: MI locking : calibration of BS and ITMs actuatorsThey are the DC responses.
I put the resonant frequencies that
  
  4642   Thu May 5 15:26:52 2011 Leo SingerConfigurationComputers'glue' installed on some control room computersI installed 'glue' on Rossa, Allegra, and
Rosalba.  This is a Python module that
includes a facility for LIGO_LW XML files. 
  
  4641   Thu May 5 15:05:06 2011 steveUpdatePSLPSL-FSS_RMTEMP is not back

    
        
 rtnfxd.jpg 
  4640   Thu May 5 14:50:30 2011 JenneUpdateLSCchans file for LSC


   
        
            
  
  4639   Thu May 5 14:40:14 2011 KojiUpdateLSCMI locking : calibration of BS and ITMs actuatorsI've got confused
1) Are these the DC responses of
the coils? If that is true, we need to specify
  
  4638   Thu May 5 13:55:08 2011 kiwamuUpdateLSCMI locking : calibration of BS and ITMs actuatorsEDIT by
KI on 15/5/2011:
 MICH_OL.png 
  4637   Thu May 5 13:14:15 2011 kiwamuUpdateLSCchans file for LSCFoton
doesn't correctly display the LSC filter
bank file : C1LSC.txt.
  
  4636   Thu May 5 13:13:32 2011 JenneUpdateLSCNew RFPD screens are inJoe helped me compile the lsc simulink
model, and now we have R&D phase rotation.
Right
  
  4635   Thu May 5 13:12:06 2011 JenneUpdatePSLTemperature drift, trying to shield PMC with foileeek.  I've been running around
all day, so this is an incomplete elog. 
I'll fill in more stuff in the next hour
 PSL_Temp_drift_5May2011.pngP5050092small.jpg 
  4634   Thu May 5 12:01:53 2011 Larisa ThorneConfigurationElectronicsJenne-Seismometer LPF project Having finished the bulk of the work
for the LPF itself ( see here ),
I have begun trying to design the seismometer
 STS2diagram.png 
  4633   Thu May 5 10:19:22 2011 steveUpdatePSLPSL-FSS_RMTEMP is backValera and I installed the the temp sensor
and the interface box that Rana fixed. This
may help with diagnosing the PSL drift.
 P1070637.JPG 
  4632   Thu May 5 04:38:20 2011 KojiSummaryLSCComparison between S3399 and FFD-100Comparison between Hamamatsu S3399 and
Perkin Elmer FFD-100
These are the candidates for the
 PD_response.pdf 
  4631   Thu May 5 00:08:59 2011 JenneUpdateLSC(Almost) New Screens for RFPDsI modified C1LSC.mdl to use the CDSphase
blocks, which automatically calculate the
R and D phase rotation for us.  Now
  
  4630   Wed May 4 17:32:06 2011 Larisa ThorneConfigurationElectronicsJenne-Seismometer LPF projectBuilding on what was posted previously
 
 
 SeisLPF3.jpg 
  4629   Wed May 4 15:56:09 2011 valeraSummaryGeneralPSL and MC trendsThe attached plot shows 2 day trends of
the PMC and MC reflected and transmitted
power, the PSL POS/ANG QPD signals, and the
 pslmcdrift.pdf 
  4628   Wed May 4 15:39:32 2011 SureshUpdateRF SystemRF Source Harmonics

I have measured the RF source harmonics in
 RF_Harmonics_Sheet1.pdf 
  4627   Wed May 4 15:22:39 2011 kiwamuUpdate Re: Intermittent MC3 UL PD signalI
went push all the possible connectors for
the MC3 shadow sensors including the SCSIs,
  
  4626   Wed May 4 13:57:04 2011 kiwamuUpdateSUSmechanical resonances updated[Leo  w/ a little help from Kiwamu]
Leo
summarized the mechanical resonances of all
  
  4625   Wed May 4 13:51:51 2011 valeraConfiguration Intermittent MC3 UL PD signalThe attached plot shows the 30 day trend
of the MC3 UL PD signal. The signal dropped
to zero at some point but now it is close
 mc3ulpdmon.pdf 
  4623   Wed May 4 13:45:56 2011 kiwamuUpdateLSClocking last nightLast night I was trying to calibrate the
MICH error signal and the actuators on BS
and ITMs.
  
  4622   Wed May 4 12:07:48 2011 SureshUpdateRF SystemREFL55 installed on the AP tableREFL55
has been installed on the AP table. 
REFL11 has been moved to make space for a
  
  4621   Wed May 4 11:48:01 2011 SureshUpdateIOOMC Locking not working[Valera, Suresh]
The first time I noticed that the
MC was not locking was after I had finished
  
  4620   Tue May 3 18:46:06 2011 ranaUpdateIOOMC Locking not workingI found that the MC autolocker was OFF.
Kiwamu says he turned it off because its
slow. Suresh says that he has some feelings
 Untitled.pngUntitled.png 
  4619   Tue May 3 18:25:38 2011 kiwamuSummaryLSCPRMI locking : plan[Rana/Jamie/Kiwamu]
 Since we've got the PRMI locked
we now should be able to do more qualitative
  
  4618   Tue May 3 17:19:25 2011 kiwamuUpdateElectronicsHeliax connectors on 1Y2 rack : tightenedMy observation wasn't accurate enough.
The
looseness came from the fact that the N-SMA
  
  4617   Tue May 3 16:47:55 2011 kiwamuUpdateLSCPRMI locking : detailsHere
are some details about the PRMI locking done
last night.
 APtable.png 
  4616   Tue May 3 16:20:13 2011 steveUpdateSUSPRM & BS oplevs are ready

    

       
            
 P1070630.JPGP1070632.JPG 
  4615   Tue May 3 15:59:22 2011 steveFrogsPhotosX-mas comes earlyThe little red all terrain cargo wagon
40" x 18"  has just arrived
on pneumatic wheels.
 P1070634.JPG 
  4614   Tue May 3 15:48:26 2011 Larisa ThorneUpdateElectronicslaser temperature control LPF, final version!This is a continuation of this
 The low pass filter is finally
acceptable, and its Bode graph is below (on
 LPF100k.2.jpg 
  4613   Tue May 3 15:04:20 2011 kiwamuUpdateSUSRe: DRMI prep : suspension diagnosticJenne went through all the suspension racks
and pushed all the connectors.
After pushing them, we had a quick
  
  4612   Tue May 3 14:35:44 2011 Larisa ThorneConfigurationElectronicsJenne-Seismometer LPF project I was charge with making a Non-Inverting
Op Amp Low Pass Feedback circuit for Jenne,
which may somehow be integrated into a seismometer
 SeisLPFdiagram.jpgseisLPF.Bose.jpg 
  4611   Tue May 3 13:22:13 2011 LeoUpdateSUSRe: DRMI prep : suspension diagnosticHere are the free-swinging spectra for
the BS, ETMX, ETMY, ITMX, ITMY, MC1, MC2,
MC3, and PRM chambers.  Kiwamu left
 10x 
  4610   Tue May 3 11:49:03 2011 KojiUpdateLSCdaytime tasksDone. C1:PSL-PMC_PMCTRANSPD was improved
from ~0.75 to 0.87.

  
  4609   Tue May 3 10:59:31 2011 josephbUpdateCDS1Y2 binary output adapter board now poweredI temporarily turned off the power to the
1Y2 rack this morning while wiring in the
binary output adapter board power (+/- 15V)
  
  4608   Tue May 3 10:41:35 2011 josephbUpdateCDSMorning maintenance1) Filled in the C1SUS_BS_OLMATRIX properly
so as to make the BS oplev work for Steve.
2) Turned on the ITMX damping. 
  
  4607   Tue May 3 10:21:25 2011 KojiUpdateLSCdaytime tasksI think the installation of the PD DC
signals are quite important. What to do
1) Connect the DC signals to the right
  
ELOG V3.1.3-