40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 264 of 357  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  12265   Thu Jul 7 10:49:03 2016 gautamUpdateGeneralVent progress - ETMX SUS Coil driver electronics investigation


 UL_glitchMon_Striptool.png 
  12271   Fri Jul 8 11:35:45 2016 gautamUpdateGeneralVent progress - ETMX SUS Coil driver electronics investigationYesterday, I expanded the extent of the
ETMX suspension coil driver investigation.
I set up identical monitors for two more
 coilGlitchMon.png 
  12272   Fri Jul 8 11:48:09 2016 KojiUpdateGeneralVent progress - ETMX SUS Coil driver electronics investigationYES

Move the suspension on the south
  
  12281   Fri Jul 8 21:22:38 2016 gautamUpdateGeneralVent progress - ETMX SUS Coil driver electronics investigationWhile ETMX is out, I'm leaving
the larger amplitude excitations to the coils
on over the weekend, in case any electronic
  
  12297   Wed Jul 13 00:38:25 2016 JohannesUpdateGeneralVent progress - ETMY attempted repositioning[Lydia, Johannes]

We attempted to move the ETMY suspension
near the access port in preparation for the
  
  12310   Tue Jul 19 13:21:42 2016 JohannesUpdateGeneralVent progress - ETMY attempted repositioning[Lydia, Johannes]

We moved ITMY from its original
position to a place near the access point.
  
  12295   Tue Jul 12 23:51:16 2016 JohannesUpdateGeneralVent progress - ETMY inspectionOn Monday I inspected ETMY, and found nothing
really remarkable. There was only little
dust on the HR side, and nothing visible
 IMG_2679.JPGIMG_2673.JPG 
  12289   Mon Jul 11 15:13:22 2016 gautamUpdateGeneralVent progress: in-date First Contact procuredI have obtained 2x100cc bottles of in-date
first contact from Garilynn (use before date
is 09/14/2016) for cleaning of our test-masses.
 image.jpeg 
  12534   Wed Oct 5 19:43:13 2016 gautamSummaryGeneralVent reviewThis elog is meant to review some of the
important changes made during the vent this
summer - please add to this if I've forgotten
  
  9572   Thu Jan 23 23:10:19 2014 ericq UpdateGeneralVent so far[ericq, Manasa, Jenne]
Summary: We opened up the
BS and both ITM chambers today, and put the
  
  9579   Mon Jan 27 21:36:35 2014 ericq UpdateGeneralVent so farAfter turning the slow FSS threshold down,
the mode cleaner stays locked enough to do
other things. We were able to align the tip
  
  2360   Mon Dec 7 09:38:05 2009 KojiUpdateVACVent startedSteve, Jenne, Koji
The PSL was blocked by the
  
  14607   Tue May 14 10:35:58 2019 gautamUpdateGeneralVent underway
PSL had stayed on overnight. There
was an EQ (M 4.6 near Costa Rica) which showed
up on the Seis BLRMS, and I noticed that
 vent.pngScreenshot_from_2019-05-14_16-35-16.png 
  10545   Fri Sep 26 16:10:14 2014 ericqUpdateGeneralVent updateToday so far:

    I moved SRM forward by
3mm
    Then I leveled the ITMY
  
  10546   Fri Sep 26 17:13:39 2014 ericqUpdateGeneralVent update

    

       
            
  
  10549   Mon Sep 29 12:47:51 2014 ericqUpdateGeneralVent update

    

       
            
  
  10550   Mon Sep 29 17:10:51 2014 ericqUpdateGeneralVent updateEverything is aligned, AS and POY make
it out of vacuum unclipped, OSEM readings
look good.
  
  10551   Mon Sep 29 18:12:24 2014 ericqUpdateGeneralVent updateI closed the PSL shutter as we didn't want
to burn the mirror surface when we are not
working.
  
  10552   Tue Sep 30 11:53:29 2014 ericqUpdateGeneralVent update 
Photos have been taken of the ITMY
chamber, and uploaded to picasa. Here's a
  
  7306   Wed Aug 29 11:47:21 2012 ericqUpdateVACVenting [Steve, Eric]
I've been helping Steve vent this
morning. The following things were done (from
  
  38   Wed Oct 31 10:31:23 2007 Andrey RodionovRoutineVACVenting is in progress
We (Steve, David, Andrey) started venting
the vacuum system at 9.50AM Wednesday morning.
  
  17866   Thu Sep 21 14:22:02 2023 RadhikaSummaryElectronicsVertex Electronics CDS UpdateI recalculated the scale factors between
OSEM sensor readings after/before the upgrade.
The expected factor is 8.64, although we
  
  17867   Fri Sep 22 16:20:25 2023 RadhikaSummaryElectronicsVertex Electronics CDS UpdateToday we tried to debug the unreasonable
OSEM readings (see previous ELOG)

 IMG_9200.jpgIMG_9201.jpg 
  17868   Fri Sep 22 18:26:08 2023 RadhikaSummaryElectronicsVertex Electronics CDS Update[Koji, Radhika, Murtaza]

All upgraded suspensions
 PXL_20230923_003545536.jpgPXL_20230923_005555079.jpg 
  17871   Fri Sep 22 19:38:06 2023 MurtazaSummaryElectronicsVertex Electronics CDS UpdatePRM
CHANNEL 1-4 (BS FEEDTHROUGH 1-3)
 IMG_9203.jpgIMG_9202.jpg 
  17830   Thu Sep 7 14:09:37 2023 KojiSummaryElectronicsVertex Electronics TransitionThe vertex electronics transition work
will begin on Monday. We expect the ongoing
ASS-X work to be completed by then. But if
 diagram_1X345.pdfrack_plan.pdf 
  17838   Tue Sep 12 18:55:55 2023 KojiSummaryElectronicsVertex Electronics TransitionWe are ready to do the transition
from Wed 1PM.

The items for the upgrade was collected
 PXL_20230913_013735728.jpg 
  17839   Tue Sep 12 23:10:06 2023 KojiSummaryElectronicsVertex Electronics TransitionNote on Sorensen:

- Eurocard crate requires
+-15V. We can place two 15V Sorensens on
  
  17843   Wed Sep 13 17:26:26 2023 KojiSummaryElectronicsVertex Electronics Transition ~ DAY 1[Radhika, Paco, Murtaza, Koji]

- Removed all the units
that will not be used in the new setup.
 rn_image_picker_lib_temp_d1ceae3a-04ba-4bdb-8fdc-1f9d8d3000e6.jpgrn_image_picker_lib_temp_7757df3b-1daf-4a12-a93c-14fd54b6355b.jpgrn_image_picker_lib_temp_c8e55ebb-eb8e-4eb2-bcb2-e12083f3aadc.jpg 
  17844   Thu Sep 14 11:46:28 2023 KojiSummaryElectronicsVertex Electronics Transition ~ DAY 2[Radhika, Paco, Murtaza, Koji]

Morning work:


Power Strip assembly
Power
 PXL_20230915_023755839.jpgPXL_20230915_012131487.jpg 
  17845   Fri Sep 15 12:51:29 2023 KojiSummaryElectronicsVertex Electronics Transition ~ DAY 3[Radhika, Paco, Murtaza, Koji]

We made great
 PXL_20230915_194539031~2.jpgPXL_20230916_005624158.MP.jpgPXL_20230916_005531262.MP.jpg 
  17848   Mon Sep 18 10:26:12 2023 KojiSummaryElectronicsVertex Electronics Transition ~ DAY 4[JC, Paco, Radhika, Koji]

Morning/Afternoon work:


Long DB cable installation
 PXL_20230918_233642072.MP.jpgPXL_20230918_233659231.jpg 
  17849   Mon Sep 18 18:38:02 2023 RadhikaSummaryElectronicsVertex Electronics Transition ~ DAY 4[Koji, Paco, Radhika]

We recorded the 5 OSEM sensor readings
for each of the 8 upgraded optics.
  
  17852   Mon Sep 18 20:16:03 2023 KojiSummaryElectronicsVertex Electronics Transition ~ DAY 4- Here is the thought how does the factor
of 9 come from:


We are driving OSEM LEDs
  
  17853   Mon Sep 18 23:09:40 2023 KojiSummaryElectronicsVertex Electronics Transition ~ DAY 4MC1 is ready for the damping test

Trouble shooting plan


Is the LED on? => Check
  
  17854   Tue Sep 19 17:25:38 2023 RadhikaSummaryElectronicsVertex Electronics Transition ~ DAY 5MCs
OSEM input / coil output gain tuning

Seeing
that MC1, MC2, MC3 OSEM readings looked reasonable
 MC1_OSEM_input_gains.pngMC1_damping_kick.png 
  17855   Tue Sep 19 19:21:10 2023 RadhikaSummaryElectronicsVertex Electronics Transition ~ DAY 5[Koji, Radhika]

Update to the Foton/Load
  
  17840   Wed Sep 13 12:46:03 2023 KojiSummaryElectronicsVertex Electronics Transition ~ final prep
[OK] Reflected the sorensen
setup (minimal change from the conventional
config. (See the attachment)

Before
 rack_plan_1X345.pdf 
  17841   Wed Sep 13 13:50:48 2023 RadhikaSummaryElectronicsVertex Electronics Transition ~ final prepOSEM values for 8 vertex optics ~before~
electronics upgrade (averaged over 60 s):

['C1:SUS-BS_ULSEN_IN1',
  
  17842   Wed Sep 13 14:02:29 2023 KojiSummaryElectronicsVertex Electronics Transition ~ final prep- 4x 1064nm NPROs
are OFF. The lab hall is laser safe, although
  
  17856   Tue Sep 19 19:48:20 2023 KojiSummaryElectronicsVertex Electronics Trouble shooting[Paco, Murtaza, JC, Koji, Radhika]

MC1/MC2 was working fine.

At
  
  17857   Tue Sep 19 20:49:08 2023 KojiSummaryElectronicsVertex Electronics Trouble shooting[Murtaza, Koji]

ITMX / BS / PRM sat amps were removed
from the rack and checked on the workbench.
 PXL_20230920_031834833.jpgPXL_20230920_033913077.jpgPXL_20230920_034246461.jpgPXL_20230920_035930889.jpgPXL_20230920_035933871.MP.jpg 
  17858   Tue Sep 19 23:40:33 2023 KojiSummaryElectronicsVertex Electronics Wed PlanPlan
for Sept 20, 2023

For morning people:
  
  17864   Wed Sep 20 18:18:38 2023 KojiSummaryElectronicsVertex Electronics Wed Plan[Koji, Murtaza, JC]

Regarding PRM/BS:


PRM2 cable and BS2 cable
  
  17860   Wed Sep 20 00:20:09 2023 KojiSummaryElectronicsVertex Electronics ~ change in the actuator calibrationI found the actuator calibration is more
complicated. The numbers I reported in the
previous elog was not correct.
  
  17861   Wed Sep 20 14:04:58 2023 RadhikaSummaryElectronicsVertex Electronics ~ change in the actuator calibrationMC1/MC2/MC3 damping
restored

I tweaked
 MC1_damping_kick_2023-09-20.pngMC2_damping_kick_2023-09-20.pngMC3_damping_kick_2023-09-20.png 
  17862   Wed Sep 20 17:02:22 2023 RadhikaSummaryElectronicsVertex Electronics ~ change in the actuator calibration[Paco, Radhika]

IMC LOCKED

We
  
  13620   Thu Feb 8 00:01:08 2018 gautamUpdateCDSVertex FEs all crashedI was poking around at the LSC rack to
try and set up a temporary arrangement whereby
I take the signals from the DAC differentially
 CDSrecovery_20180207.png 
  15383   Mon Jun 8 18:14:55 2020 gautamUpdateCDSVertex FEs crashedSummary:

Around 5pm local time, the three
vertex FEs crashed. AFAIK, 
 FEcrash_CDSoverview.png 
  7770   Fri Nov 30 23:10:36 2012 CharlesUpdateElectronicsVertex Illuminators 3 of the 4 remote controlled illuminators
at the vertex are installed and can now be
turned on via sitemap. There are a total
  
ELOG V3.1.3-