12265
|
Thu Jul 7 10:49:03 2016 |
gautam | Update | General | Vent progress - ETMX SUS Coil driver electronics investigation |
|
|
12271
|
Fri Jul 8 11:35:45 2016 |
gautam | Update | General | Vent progress - ETMX SUS Coil driver electronics investigation | Yesterday, I expanded the extent of the
ETMX suspension coil driver investigation.
I set up identical monitors for two more |
|
12272
|
Fri Jul 8 11:48:09 2016 |
Koji | Update | General | Vent progress - ETMX SUS Coil driver electronics investigation | YES
Move the suspension on the south |
|
12281
|
Fri Jul 8 21:22:38 2016 |
gautam | Update | General | Vent progress - ETMX SUS Coil driver electronics investigation | While ETMX is out, I'm leaving
the larger amplitude excitations to the coils
on over the weekend, in case any electronic |
|
12297
|
Wed Jul 13 00:38:25 2016 |
Johannes | Update | General | Vent progress - ETMY attempted repositioning | [Lydia, Johannes]
We attempted to move the ETMY suspension
near the access port in preparation for the |
|
12310
|
Tue Jul 19 13:21:42 2016 |
Johannes | Update | General | Vent progress - ETMY attempted repositioning | [Lydia, Johannes]
We moved ITMY from its original
position to a place near the access point. |
|
12295
|
Tue Jul 12 23:51:16 2016 |
Johannes | Update | General | Vent progress - ETMY inspection | On Monday I inspected ETMY, and found nothing
really remarkable. There was only little
dust on the HR side, and nothing visible |
 |
12289
|
Mon Jul 11 15:13:22 2016 |
gautam | Update | General | Vent progress: in-date First Contact procured | I have obtained 2x100cc bottles of in-date
first contact from Garilynn (use before date
is 09/14/2016) for cleaning of our test-masses. |
|
12534
|
Wed Oct 5 19:43:13 2016 |
gautam | Summary | General | Vent review | This elog is meant to review some of the
important changes made during the vent this
summer - please add to this if I've forgotten |
|
9572
|
Thu Jan 23 23:10:19 2014 |
ericq | Update | General | Vent so far | [ericq, Manasa, Jenne]
Summary: We opened up the
BS and both ITM chambers today, and put the |
|
9579
|
Mon Jan 27 21:36:35 2014 |
ericq | Update | General | Vent so far | After turning the slow FSS threshold down,
the mode cleaner stays locked enough to do
other things. We were able to align the tip |
|
2360
|
Mon Dec 7 09:38:05 2009 |
Koji | Update | VAC | Vent started | Steve, Jenne, Koji
The PSL was blocked by the |
|
14607
|
Tue May 14 10:35:58 2019 |
gautam | Update | General | Vent underway |
PSL had stayed on overnight. There
was an EQ (M 4.6 near Costa Rica) which showed
up on the Seis BLRMS, and I noticed that |
 |
10545
|
Fri Sep 26 16:10:14 2014 |
ericq | Update | General | Vent update | Today so far:
I moved SRM forward by
3mm
Then I leveled the ITMY |
|
10546
|
Fri Sep 26 17:13:39 2014 |
ericq | Update | General | Vent update |
|
|
10549
|
Mon Sep 29 12:47:51 2014 |
ericq | Update | General | Vent update |
|
|
10550
|
Mon Sep 29 17:10:51 2014 |
ericq | Update | General | Vent update | Everything is aligned, AS and POY make
it out of vacuum unclipped, OSEM readings
look good. |
|
10551
|
Mon Sep 29 18:12:24 2014 |
ericq | Update | General | Vent update | I closed the PSL shutter as we didn't want
to burn the mirror surface when we are not
working. |
|
10552
|
Tue Sep 30 11:53:29 2014 |
ericq | Update | General | Vent update |
Photos have been taken of the ITMY
chamber, and uploaded to picasa. Here's a |
|
7306
|
Wed Aug 29 11:47:21 2012 |
ericq | Update | VAC | Venting | [Steve, Eric]
I've been helping Steve vent this
morning. The following things were done (from |
|
38
|
Wed Oct 31 10:31:23 2007 |
Andrey Rodionov | Routine | VAC | Venting is in progress |
We (Steve, David, Andrey) started venting
the vacuum system at 9.50AM Wednesday morning. |
|
17866
|
Thu Sep 21 14:22:02 2023 |
Radhika | Summary | Electronics | Vertex Electronics CDS Update | I recalculated the scale factors between
OSEM sensor readings after/before the upgrade.
The expected factor is 8.64, although we |
|
17867
|
Fri Sep 22 16:20:25 2023 |
Radhika | Summary | Electronics | Vertex Electronics CDS Update | Today we tried to debug the unreasonable
OSEM readings (see previous ELOG)
|
 |
17868
|
Fri Sep 22 18:26:08 2023 |
Radhika | Summary | Electronics | Vertex Electronics CDS Update | [Koji, Radhika, Murtaza]
All upgraded suspensions |
 |
17871
|
Fri Sep 22 19:38:06 2023 |
Murtaza | Summary | Electronics | Vertex Electronics CDS Update | PRM
CHANNEL 1-4 (BS FEEDTHROUGH 1-3) |
 |
17830
|
Thu Sep 7 14:09:37 2023 |
Koji | Summary | Electronics | Vertex Electronics Transition | The vertex electronics transition work
will begin on Monday. We expect the ongoing
ASS-X work to be completed by then. But if |
 |
17838
|
Tue Sep 12 18:55:55 2023 |
Koji | Summary | Electronics | Vertex Electronics Transition | We are ready to do the transition
from Wed 1PM.
The items for the upgrade was collected |
|
17839
|
Tue Sep 12 23:10:06 2023 |
Koji | Summary | Electronics | Vertex Electronics Transition | Note on Sorensen:
- Eurocard crate requires
+-15V. We can place two 15V Sorensens on |
|
17843
|
Wed Sep 13 17:26:26 2023 |
Koji | Summary | Electronics | Vertex Electronics Transition ~ DAY 1 | [Radhika, Paco, Murtaza, Koji]
- Removed all the units
that will not be used in the new setup. |
  |
17844
|
Thu Sep 14 11:46:28 2023 |
Koji | Summary | Electronics | Vertex Electronics Transition ~ DAY 2 | [Radhika, Paco, Murtaza, Koji]
Morning work:
Power Strip assembly
Power |
 |
17845
|
Fri Sep 15 12:51:29 2023 |
Koji | Summary | Electronics | Vertex Electronics Transition ~ DAY 3 | [Radhika, Paco, Murtaza, Koji]
We made great |
  |
17848
|
Mon Sep 18 10:26:12 2023 |
Koji | Summary | Electronics | Vertex Electronics Transition ~ DAY 4 | [JC, Paco, Radhika, Koji]
Morning/Afternoon work:
Long DB cable installation |
 |
17849
|
Mon Sep 18 18:38:02 2023 |
Radhika | Summary | Electronics | Vertex Electronics Transition ~ DAY 4 | [Koji, Paco, Radhika]
We recorded the 5 OSEM sensor readings
for each of the 8 upgraded optics. |
|
17852
|
Mon Sep 18 20:16:03 2023 |
Koji | Summary | Electronics | Vertex Electronics Transition ~ DAY 4 | - Here is the thought how does the factor
of 9 come from:
We are driving OSEM LEDs |
|
17853
|
Mon Sep 18 23:09:40 2023 |
Koji | Summary | Electronics | Vertex Electronics Transition ~ DAY 4 | MC1 is ready for the damping test
Trouble shooting plan
Is the LED on? => Check |
|
17854
|
Tue Sep 19 17:25:38 2023 |
Radhika | Summary | Electronics | Vertex Electronics Transition ~ DAY 5 | MCs
OSEM input / coil output gain tuning
Seeing
that MC1, MC2, MC3 OSEM readings looked reasonable |
 |
17855
|
Tue Sep 19 19:21:10 2023 |
Radhika | Summary | Electronics | Vertex Electronics Transition ~ DAY 5 | [Koji, Radhika]
Update to the Foton/Load |
|
17840
|
Wed Sep 13 12:46:03 2023 |
Koji | Summary | Electronics | Vertex Electronics Transition ~ final prep |
[OK] Reflected the sorensen
setup (minimal change from the conventional
config. (See the attachment)
Before |
|
17841
|
Wed Sep 13 13:50:48 2023 |
Radhika | Summary | Electronics | Vertex Electronics Transition ~ final prep | OSEM values for 8 vertex optics ~before~
electronics upgrade (averaged over 60 s):
['C1:SUS-BS_ULSEN_IN1', |
|
17842
|
Wed Sep 13 14:02:29 2023 |
Koji | Summary | Electronics | Vertex Electronics Transition ~ final prep | - 4x 1064nm NPROs
are OFF. The lab hall is laser safe, although |
|
17856
|
Tue Sep 19 19:48:20 2023 |
Koji | Summary | Electronics | Vertex Electronics Trouble shooting | [Paco, Murtaza, JC, Koji, Radhika]
MC1/MC2 was working fine.
At |
|
17857
|
Tue Sep 19 20:49:08 2023 |
Koji | Summary | Electronics | Vertex Electronics Trouble shooting | [Murtaza, Koji]
ITMX / BS / PRM sat amps were removed
from the rack and checked on the workbench. |
    |
17858
|
Tue Sep 19 23:40:33 2023 |
Koji | Summary | Electronics | Vertex Electronics Wed Plan | Plan
for Sept 20, 2023
For morning people: |
|
17864
|
Wed Sep 20 18:18:38 2023 |
Koji | Summary | Electronics | Vertex Electronics Wed Plan | [Koji, Murtaza, JC]
Regarding PRM/BS:
PRM2 cable and BS2 cable |
|
17860
|
Wed Sep 20 00:20:09 2023 |
Koji | Summary | Electronics | Vertex Electronics ~ change in the actuator calibration | I found the actuator calibration is more
complicated. The numbers I reported in the
previous elog was not correct. |
|
17861
|
Wed Sep 20 14:04:58 2023 |
Radhika | Summary | Electronics | Vertex Electronics ~ change in the actuator calibration | MC1/MC2/MC3 damping
restored
I tweaked |
  |
17862
|
Wed Sep 20 17:02:22 2023 |
Radhika | Summary | Electronics | Vertex Electronics ~ change in the actuator calibration | [Paco, Radhika]
IMC LOCKED
We |
|
13620
|
Thu Feb 8 00:01:08 2018 |
gautam | Update | CDS | Vertex FEs all crashed | I was poking around at the LSC rack to
try and set up a temporary arrangement whereby
I take the signals from the DAC differentially |
|
15383
|
Mon Jun 8 18:14:55 2020 |
gautam | Update | CDS | Vertex FEs crashed | Summary:
Around 5pm local time, the three
vertex FEs crashed. AFAIK, |
|
7770
|
Fri Nov 30 23:10:36 2012 |
Charles | Update | Electronics | Vertex Illuminators | 3 of the 4 remote controlled illuminators
at the vertex are installed and can now be
turned on via sitemap. There are a total |
|