40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 264 of 344  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  1277   Fri Feb 6 09:52:35 2009 KakeruUpdatePSLCurrent shunt transfar functionI attach the transfar function of the current
shunt.
There is a little gap at 10 Hz for
 TF_CS_gain.pngTF_CS_phase.png 
  1278   Fri Feb 6 09:56:11 2009 KakeruUpdatePSLISS servo transfar functionI attache the transfar function of ISS
servo.
The 4th stage and variable gain amplifier
 TF_ISSservo_gain.pngTF_ISSservo_phase.png 
  1279   Fri Feb 6 10:46:40 2009 KakeruUpdatePSLISS servo and noiseI measured the output noise of eache stage
of ISS servo, and calcurated the noise ratio
between input and 
 ISS_servo_TF_noise.png 
  1281   Fri Feb 6 16:20:52 2009 YoichiUpdatePSLMOPA current slider fixedI fixed the broken slider to change the
current of the PA.
The problem was that the EPICS database
  
  1283   Fri Feb 6 23:23:48 2009 Kakeru, YoichiUpdatePSLISS is fixedYoichi and me found that the transfar function
of the current shunt changed with the current
of PA.
 Current_ShuntTF_gain.pngCurrent_ShuntTF_phase.png 
  1284   Mon Feb 9 16:02:42 2009 YoichiUpdatePSLPSL relative intensity noiseI attached the relative intensity noise of
the PSL.
There is no bump around the lower UGF (~1Hz),
 RIN-13dB.pngRIN-21dB.png 
  1287   Mon Feb 9 19:50:48 2009 YoichiConfigurationPSLISS disconnectedWe are doing measurements on ISS.
The ISS feedback connector is disconnected
and the beam to the MC is blocked.
  
  1289   Tue Feb 10 23:36:25 2009 KakeruUpdatePSLPA current and laser outputI changed the PA current and measured laser
output power (monitor PD signal).
The gain of ISS is 13dB
 PA_current_output.png 
  1291   Wed Feb 11 07:28:25 2009 YoichiUpdatePSLPA current and laser outputI think we should also plot the laser power
at the MOPA output. The horizontal axis should
be the absolute current value read from the
  
  1295   Wed Feb 11 23:51:53 2009 KakeruUpdatePSLPA current and laser outputI attached a plot of ISS monitor PD and MOPA
output to PA current.
The both end of PA current (26.0353[A] and
 PA_current_output.png 
  1299   Thu Feb 12 18:35:10 2009 KakeruConfigurationPSLPA current limitter
I added a PA current limiter.
It is only a voltage devider (composed
  
  1357   Wed Mar 4 23:42:45 2009 ranaConfigurationPSLpsl db changeI made   
  1395   Thu Mar 12 18:44:02 2009 YoichiUpdatePSLMZ alignedThe MC lost the alignment somehow this afternoon.
So I thought it was good time to touch the
MZ because I had to align the MC using the
  
  1421   Tue Mar 24 13:10:07 2009 AlbertoConfigurationPSLnew mirror installed on the AP tableNew flipping mirror installed on the AP
table on the beam path to the REFL199 PD.
If you're missing the double demod
  
  1431   Thu Mar 26 04:01:24 2009 YoichiUpdatePSLFSS Open Loop GainYoichi, Peter, Jenne

Attached is the open loop transfer function
 OpenLoopTF.png 
  1470   Fri Apr 10 18:11:18 2009 JenneUpdatePSLISS has a bad cable?[Rob, Jenne]
I noticed that the ISS Mean Value
and CS Saturation were both 
  
  1471   Fri Apr 10 19:09:48 2009 JenneUpdatePSLPMC LO CalibrationI measured the RF LO output level from the
PMC's LO board which goes directly into the
LO input on the PMC Servo board.  This goes
 RFSliderAdjustCalib.pngRFSliderAdjustCalibWithOsc.png 
  1473   Sat Apr 11 00:45:41 2009 YoichiUpdatePSLPMC LO Calibration[quote]
I then changed the RF Output Adjust slider
in increments of 0.5, and measured the peak-to-peak
  
  1475   Sun Apr 12 19:27:20 2009 ranaUpdatePSLPMC LO Calibration[quote]
3.8Vpp is about 16dBm. 
The mixer for the PMC demodulator is level
  
  1477   Mon Apr 13 08:59:57 2009 steveUpdatePSLmixers on order[quote][quote]
I then changed the RF Output Adjust slider
in increments of 0.5, and measured the peak-to-peak
  
  1478   Mon Apr 13 17:55:37 2009 JenneUpdatePSLPMC LO Mon CalibrationI have calibrated the PMC LO Mon (C1:PSL-PMC_LODET)
on the PMC's EPICS screen, by inputting different
RF LO levels into the LO input of the PMC
 LOmonCalibration.png 
  1487   Wed Apr 15 17:11:37 2009 JenneUpdatePSLEdited c1psl.db to calibrate PMC's LO mon


Following the method in Peter's
Elog, 

I edited c1psl.db to include
the following: 


grecord(calc, "C1:PSL-PMC_LOCALC")
{
  
  1488   Thu Apr 16 11:17:56 2009 JenneUpdatePSLEdited c1psl.db to calibrate PMC's LO mon


   
        
            
  
  1502   Mon Apr 20 19:51:51 2009 JenneConfigurationPSLPMC has new Level 13 Mixer installedThe new Level 13 mixer on the PMC servo
board is installed (minicircuits SRA-3MH).  
Since the RF output of the LO board was ~16dBm,
 PMColg20Apr2009.png 
  1568   Sat May 9 00:15:21 2009 YoichiUpdatePSLLaser head temperature oscillationAfter the laser cooling pipe was unclogged,
the laser head temperature has been oscillating
in 24h period.
 laser.png 
  1569   Sat May 9 02:20:11 2009 JenneUpdatePSLLaser head temperature oscillation[quote]After the laser cooling pipe was unclogged,
the laser head temperature has been oscillating
in 24h period.
  
  1570   Sat May 9 15:19:10 2009 ranaUpdatePSLLaser head temperature oscillationThis is 8 days of 10-minute trend.

DTEC is just the feedback control signal
 Picture_2.png 
  1573   Mon May 11 11:49:20 2009 steveUpdatePSLMOPA cooling water lines are backwards[quote]This is 8 days of 10-minute trend.

DTEC is just the feedback control signal
 htempvar80d.jpg 
  1617   Thu May 21 18:07:32 2009 ranaUpdatePSLScrew on Needle valve loosenedAlberto and I went in to loosen up the needle
valve yesterday around 4:30 PM. The idea
was to cut down on 
 Untitled.png 
  1621   Fri May 22 17:03:14 2009 rob, steveUpdatePSLMOPA takes a holidayThe MOPA is taking the long weekend off.
Steve went out to wipe off the condensation
inside the MOPA and found beads of water
  
  1625   Tue May 26 17:05:44 2009 robUpdatePSLMOPA re-activatedsteve, rob, alberto
 
Steve installed two rotary flow meters
 DSC_0513.JPGDSC_0517.JPG 
  1626   Tue May 26 17:34:14 2009 robUpdatePSLMOPA re-deactivated


   
        
            
 laser_temp.jpg 
  1627   Wed May 27 10:54:09 2009 robUpdatePSLwe don't understand the chiller (broken)


   
        
            
  
  1628   Wed May 27 15:59:44 2009 robUpdatePSLwe don't understand the chiller (broken)steve, alberto, rob
After some futzing around with the
chiller, we have come to the tentative conclusion
  
  1629   Thu May 28 14:34:25 2009 robUpdatePSLchiller diagnosis


   
        
            
  
  1630   Thu May 28 18:41:26 2009 steveUpdatePSLthe saga of the chiller is endingI drained the water and removed side covers
from the Neslab RTE 140 refrigerated water
cooler unit this morning. The hoses to the
  
  1631   Fri May 29 18:57:09 2009 steveUpdatePSLthe laser is backSteve, Rob and Alberto
 
Starting capacitor 216 miroFarad
 laserisback.jpg 
  1632   Sat May 30 11:24:56 2009 robConfigurationPSLNPRO slow scanI'm setting SLOWDC to about -5.
I had to edit FSSSlowServo because
it had hard limits on SLOWDC at (-5 and 5). 
 slowSCAN.png 
  1633   Sat May 30 12:03:34 2009 robUpdatePSLMC lockedI locked to PSL loops, then tweaked the
alignment of the MC to get it to lock. 
I first steering MC1 until all the
  
  1636   Mon Jun 1 13:56:52 2009 AlbertoUpdatePSLLaser Power after fixing the laser chillerThe laser power seems to have become more
stable after fixing the laser chiller. The
power is lower than it used to be (MOPA amplitude
 MOPAtrend.jpg 
  1638   Mon Jun 1 14:49:07 2009 robSummaryPSLpsl thoughtsSome thoughts on what happened with the
MOPA cooling.  
Some unknown thing happened to precipitate
  
  1639   Mon Jun 1 15:01:31 2009 ranaUpdatePSLLaser Power after fixing the laser chiller: more tracesIf you look at the correlation between RMTEMP
and HTEMP, you see what we knew: namely that
there
 Picture_7.png 
  1640   Mon Jun 1 19:19:26 2009 ranaUpdatePSL1000 days of hour-trend   u.png 
  1651   Thu Jun 4 15:53:15 2009 steveUpdatePSLNPRO cooling flowrate adjustedThe Neslab chiller is working well. It's
temp display shows 20.0 C rock solid. Flow
meter rotating at 13.5Hz at the out put of
 needlevalve.jpg 
  1666   Wed Jun 10 09:28:14 2009 steveUpdatePSLPMCThe PMC alarm was on this morning. It was
relocked at lower HV
The FSS_RMTEMP jumped 0.5 C so The
 pmctemphv.jpg 
  1725   Wed Jul 8 19:13:19 2009 AlbertoUpdatePSLPSL beam aligned to the Mode CleanerToday I tuned the periscope on the PSL
table to align the beam to the Mode Cleaner.
With the Wave Front Sensor control off, I
  
  1774   Wed Jul 22 10:49:40 2009 AlbertoUpdatePSLMC Alignment TrendTrying to track the MC positions back for
a few days, it seems that the data hasn't
been recorded properly for a while. Something
 2009-07-21_MC-align-trend.pdf2009-07-22_mc-align-trend.pdf 
  1783   Thu Jul 23 10:05:38 2009 AlbertoUpdatePSLSummary of the latest adventures with the alignment of the mode cleaner


  
  1784   Thu Jul 23 20:30:23 2009 AlbertoUpdatePSLBeam aligned to the FaradyAfter yesterday's changes in the MC cavity
state today it was necessary to optimize
the alignment to the Faraday.
  
  1788   Fri Jul 24 21:02:46 2009 AlbertoUpdatePSLAligning the beam to the FaradayThis afternoon I kept working on the alignment
of the beam so that it matches at the same
the PSL periscope, the Mode Cleaner and the
  
ELOG V3.1.3-