40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 262 of 344  Not logged in ELOG logo
   +  Reply  Thu Sep 4 00:38:14 2008, rana, Update, PSL, c1iovme power cycled 
   +  Reply  Thu Sep 4 07:29:52 2008, Yoichi, Update, PSL, c1iovme power cycled 
Entry  Thu Sep 4 13:48:50 2008, Yoichi, Update, PSL, FSS modulation depth RCScan.png
Entry  Thu Sep 4 14:43:58 2008, Jenne, Update, PSL, PMC Open Loop Gain OpenLoopTF04Sept2008.png
Entry  Thu Sep 4 17:03:25 2008, Yoichi, Update, PSL, RF oscillator noise comparison RFSpectra.png
Entry  Thu Sep 4 17:12:57 2008, Yoichi, Update, PSL, FSS open loop TF FSS-OPLTFs.png
Entry  Thu Sep 4 17:44:27 2008, Yoichi, Update, PSL, FSS error signal spectrum FSS-Error-Spe.png
Entry  Fri Sep 5 08:34:03 2008, steve, Update, PSL, MZ locked mzhv.jpg
Entry  Mon Sep 8 15:38:57 2008, Yoichi, Configuration, PSL, POY RF amp is back to its original task 
Entry  Tue Sep 16 16:47:01 2008, pete, Configuration, PSL, Prototype FSS reference installed 
Entry  Wed Sep 17 13:43:54 2008, Yoichi, Configuration, PSL, RC sweep going on 
   +  Reply  Wed Sep 17 15:22:31 2008, Yoichi, Configuration, PSL, RC sweep going on 
Entry  Wed Sep 17 17:31:24 2008, Yoichi, Update, PSL, FSS calibration PZTresp.pngCalibration.pngFreqNoiseSpectrum.png
   +  Reply  Wed Sep 17 17:58:35 2008, Yoichi, Configuration, PSL, RC sweep going on 
Entry  Thu Sep 18 23:31:26 2008, rana, Update, PSL, ISS: Saturating too often at nominal gain FIRE_BLOWER.jpg
Entry  Fri Sep 19 08:09:55 2008, steve, Update, PSL, psl HEPAs turned on 
Entry  Mon Sep 22 18:54:54 2008, Jenne, Update, PSL, PMC transfer functions with various brick-on-top configurations PMC_OLG_100Hz_to_100kHz.pngPMC_OLG_5kHz_to_30kHz.png
Entry  Mon Sep 22 21:30:06 2008, rana, Configuration, PSL, bad FSS DAQ.png
   +  Reply  Mon Sep 22 22:24:19 2008, rana, Configuration, PSL, bad FSS 
Entry  Tue Sep 23 11:17:59 2008, steve, Update, PSL, PMC scattering spot rainbow.pngpmcclip.png
Entry  Tue Sep 23 15:28:06 2008, pete, Configuration, PSL, new 21.5 MHz FSS reference installed fss_ref_001.jpgfss_ref_013.jpg
Entry  Thu Sep 25 02:35:21 2008, rana, Summary, PSL, FAST is moving alot Untitled.pngUntitled.png
Entry  Thu Sep 25 10:48:29 2008, Yoichi, Update, PSL, FSS calibration again PDTrans.pngPDHsignal.png
Entry  Fri Sep 26 00:19:54 2008, Jenne, Update, PSL, Filter-action with the PMC 
Entry  Fri Sep 26 18:35:17 2008, Jenne, Update, PSL, PMC filter is out for tuning 
Entry  Fri Sep 26 19:08:43 2008, rana, Configuration, PSL, Refcav Trans: PD + Camera + Dumps 
Entry  Mon Sep 29 01:19:40 2008, rana, Summary, PSL, Laser chiller running a little hot 
   +  Reply  Mon Sep 29 13:23:40 2008, rob, Summary, PSL, Laser chiller running a little hot 
Entry  Mon Sep 29 15:09:36 2008, steve, Update, PSL, almost 4 yrs plot of power & temps 3.5y.jpg
Entry  Mon Sep 29 17:53:33 2008, Yoichi, Update, PSL, ISS update IMG_1671.JPG
Entry  Tue Sep 30 19:50:27 2008, Jenne, Update, PSL, Quicky Summary - more details later mcf.png
Entry  Wed Oct 1 02:47:53 2008, rana, Update, PSL, PSL ERR & LODET: Too much offset Untitled.png
Entry  Wed Oct 1 23:05:14 2008, Yoichi, Update, PSL, ISS RIN spectra RIN.pngOPLTF.png
Entry  Wed Oct 1 23:21:03 2008, Yoichi, Configuration, PSL, Reference cavity reflection camera 
Entry  Fri Oct 3 15:09:58 2008, rob, Update, PSL, FAST/SLOW FASTSLOW.png
Entry  Wed Oct 8 19:17:55 2008, Yoichi, Configuration, PSL, Laser power is slowly recovering 
Entry  Wed Oct 8 21:26:20 2008, Yoichi, Update, PSL, Attempt to replace the DC-DC converter (aborted) DCDC.JPGNPRO.JPG
Entry  Wed Oct 8 23:18:23 2008, Yoichi, Update, PSL, Correlation between the Sorensen switching noise and the FSS error signal PowerLineSpe.pngCoherence.png
Entry  Mon Oct 13 11:32:50 2008, Yoixhi, Update, PSL, MOPA is in trouble now powerdrop.png
Entry  Mon Oct 13 13:51:49 2008, pete, Configuration, PSL, attempt to measure FSS ref phase 
   +  Reply  Mon Oct 13 13:56:03 2008, Yoichi, Update, PSL, MOPA is not that much in trouble now 
Entry  Mon Oct 13 18:59:39 2008, Yoichi, Update, PSL, NPRO EMI and FSS error signal correlation IMG_1692.JPGSpectrum.pngSpectrumFar.pngCoherence.png
Entry  Tue Oct 14 14:19:36 2008, pete, Configuration, PSL, FSS ref phase 
Entry  Tue Oct 14 19:24:34 2008, Yoichi, Configuration, PSL, FSS light power reduced 
Entry  Wed Oct 15 17:40:50 2008, rana, Update, PSL, PMC Offset adjusted 
Entry  Wed Oct 15 22:07:52 2008, pete, Configuration, PSL, FSS ref phase measurements phasedelay.png
Entry  Thu Oct 16 09:44:49 2008, Yoichi, Update, PSL, Bad cable for FSS 
   +  Reply  Thu Oct 16 09:47:49 2008, Yoichi, Configuration, PSL, FSS ref phase measurements 
Entry  Thu Oct 16 13:12:58 2008, pete, Configuration, PSL, phase between FSS reference outputs 
Entry  Thu Oct 16 16:26:26 2008, pete, Configuration, PSL, FSS phase matching cable installed 
ELOG V3.1.3-