40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 25 of 344  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  8920   Wed Jul 24 22:58:03 2013 CharlesUpdateISSISS - Full Schematic - Updated I have made significant changes to
the ISS schematic, mostly in the form of
adding necessary subsystems.
 40mServo_v1.pdf 
  8922   Thu Jul 25 12:53:45 2013 CharlesUpdateISSComparator + Triggering Prototype I realized I totally forgot to post
this last week, but I prototyped the comparator
and boost triggering portion of the ISS,
 Comparator_Prototype.pngComp_Triggering_Behavior.jpg 
  8927   Fri Jul 26 14:39:08 2013 CharlesUpdateISSPower Regulation for ISS BoardI constructed a regulator board that can
take 
  
  8928   Fri Jul 26 22:19:24 2013 CharlesUpdateISSISS - Full Schematic - Updated

    

       
            
 40mServo_v1.pdf 
  8959   Thu Aug 1 22:58:45 2013 CharlesUpdateISSCTN Servo - Explicit Requirement and Proposed Servo In PSL
elog 1270, Evan elucidated the explicit
requirements for the CTN ISS board. Essentially,
 CTN_Servo_TF_-_Proposed_v_Req.pngCTNServo_v3.fil 
  8961   Fri Aug 2 21:59:36 2013 CharlesUpdateISSFinalized ISS Schematic (hopefully) Attached is the finalized schematic. The
general circuit topology should remain the
same from this point forward, although individual
 ISS_v3.pdfISS_v3-Power_Reg.pdf 
  9016   Thu Aug 15 21:42:53 2013 CharlesUpdateISSISS - Schematic + PCB Layout After many, many moons of getting
to know exactly how frustrating Altium can
be, I have completed the PCB layout for my
 ISS_v3.pdfISS_v3-Power_Reg.pdf 
  9019   Fri Aug 16 19:36:49 2013 CharlesUpdatePSLPMC_trans ChannelRana and I connected the PMC_trans output
to the BNC connector board on the west end
of the PSL table (the channel is labeled).
  
  9330   Sat Nov 2 19:36:15 2013 CharlesUpdateGeneralPossible misalignment? I was working on the electronics
bench and what sounded like a huge truck
rolled by outside. I didn't notice anything
  
  9331   Sat Nov 2 22:49:44 2013 CharlesUpdateISSCTN ISS Noise Suppression Requirement - Updated 10/27 Previously in elog
8959, I gave a very simple method for
determining the noise suppression behavior
 7x 
  9332   Sun Nov 3 00:05:52 2013 CharlesSummaryISSISS Update - Bout' timeRight near the end of summer, I had an
ISS board that was nominally working, but
had a few problems I couldn't really sort
 full-op-loop.pngfull-cl-loop.pngreq-vs-meas.png 
  9746   Mon Mar 24 19:42:12 2014 CharlesFrogsVACPower Failure The 40m experienced a building-wide
power failure for ~30 seconds at ~7:38 pm
today.
  
  12232   Thu Jun 30 14:31:02 2016 ChemistryUpdateSUSNO   mad-scientist.jpg 
  4432   Wed Mar 23 12:40:22 2011 Chief Recycling OfficerHowToEnvironmentRecycle stuff!The following is a message from the LIGO
40m Chief Recycling Officer:
  
  3161   Tue Jul 6 17:29:04 2010 ChipUpdatePEMThe Ranger is mine!    
  8061   Mon Feb 11 18:39:10 2013 ChloeUpdateGeneralPictures of Circuitry in PhotodiodeI am going to be making measurements to
find the optical mounts with the least noise.
I am using a quadrature photodiode to record
 IMG_0327.JPGIMG_0329.JPG 
  8067   Tue Feb 12 17:26:31 2013 ChloeUpdate QPD circuitry to test mount vibrations I spent awhile today reading about
op-amps and understanding what would be necessary
to design a circuit which would directly
  
  8090   Fri Feb 15 17:11:13 2013 ChloeUpdate QPD circuit pictures I took better pictures of the circuits
of the QPD and spent a couple of hours with
a multimeter trying to figure out how all
 IMG_0337.JPGIMG_0338.JPG 
  8111   Tue Feb 19 17:14:56 2013 ChloeUpdate QPD CircuitI finished working out the circuit and
figured out where the broken connections
were. This is diagrammed in my notebook (will
  
  8139   Fri Feb 22 17:33:38 2013 ChloeUpdate QPD circuit diagramToday I tested the circuitry within the
QPD to make sure I had put it back together
correctly. The output was able to detect
 IMG_0377.JPG 
  8173   Tue Feb 26 17:36:28 2013 ChloeUpdate QPD CircuitI corrected the circuit diagram I constructed
last time - it would read 0 output most of
the time because I made a mistake with the
  
  8233   Tue Mar 5 17:23:06 2013 ChloeUpdate QPD Adding/Subtracting CircuitToday I finished building the adding/subtracting
circuit for the QPD and tested that the QPD
could see a laser moving across its visual
  
  8295   Thu Mar 14 16:56:16 2013 ChloeUpdate QPD Circuit DesignI have sketched out the circuit design
for the QPD. However, it seems like even
when using a different opamp configuration,
  
  8338   Mon Mar 25 16:51:43 2013 ChloeUpdate Final QPD Circuit DesignThis is the final version of the QPD circuit
I'm going to build. After playing around
with the spatial arrangement, this should
 IMG-20130325-00244.jpg 
  8346   Mon Mar 25 23:27:26 2013 ChloeUpdate QPD CircuitIn order to test the mount vibrations,
I will likely try and make a different circuit
work (with the summing/subtracting on an
  
  8358   Tue Mar 26 17:32:30 2013 ChloeUpdate QPD/ECDL ProgressI built the summing/subtracting circuit
on the breadboard, and hooked this up with
one of the other QPDs I found (image of setup
 IMG-20130326-00245.jpg 
  8381   Mon Apr 1 16:13:50 2013 ChloeUpdate QPDBecause we would like to get started on
testing mount vibrations as soon as possible,
I've been trying to get one of the other
  
  8403   Wed Apr 3 16:03:59 2013 ChloeUpdate QPD Voltage RegulatorsThe voltage regulator on the QPD breadboard
seems to be having problems... yesterday
Eric helped me debug my circuit and discovered
  
  8511   Tue Apr 30 12:25:23 2013 ChloeUpdate QPDAnnalisa and I met yesterday and fixed
the voltage regulator on the breadboard so
the QPD circuit is working. We will meet
  
  1797   Mon Jul 27 14:43:34 2009 ChrisUpdate PhotodetectorsI found two ThorLabs PDA55 Si photodetectors
that says detect visible light from DC to
10MHz that I'm going to use from now on. 
  
  1810   Wed Jul 29 19:41:58 2009 ChrisConfigurationGeneralEUCLID-setup configuration changeDavid and I were thinking about changing
the non-polarizing beam splitter in the EUCLID
setup from 50/50 to 33/66 (ref picture). 
 EUCLID.png 
  1845   Thu Aug 6 17:51:21 2009 ChrisUpdateGeneralDisplacement Sensor UpdateFor the past week Dmass and I have been
ordering parts and getting ready to construct
our own modified version of EUCLID (figure). 
 Actual_Sensor.pngSensitivity.png 
  1846   Thu Aug 6 18:21:03 2009 ChrisUpdateGeneralDisplacement Sensor Update


   
        
            
  
  1894   Wed Aug 12 23:45:03 2009 ChrisUpdateGeneralLong range michelsonToday I set up the EUCLID long range michelson
design on the SP table; It's the same as
the setup posted earlier, but without the
 Actual_Sensor.png 
  1908   Fri Aug 14 23:45:14 2009 ChrisUpdateGeneralLong Range ReadoutThe EUCLID-style Michelson readout is on
the SP table now and is aligned.  See
image below.  I took several power spectra
 Table_Setup.pngEllipse.jpgCircle.jpg 
  10189   Fri Jul 11 22:28:34 2014 ChrisUpdateCDSc1auxex "Unknown Host"

    

       
            
  
  10309   Thu Jul 31 18:54:03 2014 ChrisFrogselogMicroSoft BingBot is attacking us

    

       
            
  
  10632   Wed Oct 22 21:06:33 2014 ChrisUpdateDAQ40m frames onto the cluster


   
        
            
  
  10868   Wed Jan 7 13:39:42 2015 ChrisUpdateLSCDARM phase budgetI think the dolphin and RFM transit times
are double-counted in this budget. As I understand
it, all IPC transit times are already built
  
  10897   Tue Jan 13 18:47:20 2015 ChrisConfigurationComputer Scripts / Programsinstafoton setupTo use instafoton, right click an MEDM
screen, open the Execute menu, and choose
"Foton".  Then click on the
  
  10898   Tue Jan 13 23:17:57 2015 ChrisFrogsComputer Scripts / Programsmedm time machineAfter recompiling medm with a patch for
dumping screens (attached), I added a time
machine to the right-click Execute menu. 
 tm.pngdump_medm_screen.patch 
  11052   Thu Feb 19 23:23:52 2015 ChrisUpdateCDSBad CDS behaviorThe frontends have some paths NFS-mounted
from fb. fb is on the ragged edge of being
I/O bound. I'd suggest moving those mounts
  
  12487   Tue Sep 13 16:16:28 2016 ChrisOmnistructureVACvacuum interlock bypassed(Steve, Chris)

The pumpdown had stalled because
of some ancient vacuum interlock code that
  
  13318   Mon Sep 18 17:30:54 2017 ChrisUpdateCDSFB wiper scriptAttached is the version of the wiper script
we use on the CryoLab cymac. It works with
perl v5.20.2. Is this different from what
 wiper.pl 
  13338   Thu Sep 28 06:35:44 2017 ChrisUpdateLSCDAC noise measurement (again)Since you're monitoring two channels
simultaneously, you could try subtracting
them, as an alternative to carving out bandstops.
  
  16853   Sat May 14 08:36:03 2022 ChrisUpdateDAQDAQ troubleshootingI heard a rumor about a DAQ problem at
the 40m.

To investigate, I tried retrieving
  
  16855   Mon May 16 12:59:27 2022 ChrisUpdateDAQDAQ troubleshootingIt looks like the RFM problem started a
little after 2am on Saturday morning (attachment
1). It’s subsequent to what I did,
 timeseries.pngerr.png 
  17172   Tue Oct 4 21:00:49 2022 ChrisUpdateComputersFailed takeover attempt with the new front ends[Jamie, JC, Chris]

Today we made a failed attempt
to take over the 40m hardware with the new
  
  17173   Thu Oct 6 07:29:30 2022 ChrisUpdateComputersSuccessful takeover attempt with the new front ends[JC, Chris]

Last night’s CDS
upgrade attempt succeeded in taking over
  
  17180   Mon Oct 10 00:05:24 2022 ChrisUpdateIOOIMC WFS / MC2 SUS glitchThanks for pointing out that EPICS data
collection (slow channels) was not working.
I started the service that collects these
  
ELOG V3.1.3-