40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 257 of 357  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  2561   Tue Feb 2 16:10:09 2010 steveUpdatePEMconstruction progress next doorCES construction is progressing. The 40m
suspensions are bearing well.
atm1, PEM  vs sus plots of 120
 pem120d.jpg02022010.JPG02022010b.JPG02022010c.JPGicewall.JPG 
  2638   Wed Feb 24 16:11:15 2010 JenneUpdatePEMSeismic witnesses near MC1 tank movedSince we're going to open the MC1 tank
tomorrow, I've moved the MC1 accelerometers
and the Guralp over to underneath MC2 for
  
  2661   Sun Mar 7 23:05:39 2010 ranaUpdatePEMSeismic witnesses near MC1 tank moved

    
        
 seis.png 
  2662   Mon Mar 8 18:15:27 2010 ranaUpdatePEMStyrofoam Cooler on the SeismosI put Jenne's
cooler over the seismometers
 SeismometersHuddled.jpg 
  2663   Tue Mar 9 09:04:20 2010 steveUpdatePEMkeep vacuum chamber closedThey are sandblasting at CES: our particle
counts are very high. DO NOT OPEN CHAMBER!
 sandblasting.jpg 
  2665   Tue Mar 9 12:06:53 2010 rana, JenneUpdatePEMStyrofoam Cooler on the SeismosLooks like the GUR2_X signal is bad. Jenne
says that we need to center it mechanically
before the signals will become useful again.
  
  2666   Wed Mar 10 15:02:58 2010 ranaUpdatePEMStyrofoam Cooler on the SeismosThis is the spectra and coherence from
a quiet time last night. I've lowered the
Guralp cal by a factor of 2 to account for
 Seismic-Ref_100310.pngUntitled.gif 
  2671   Sat Mar 13 21:30:22 2010 ranaUpdatePEMStyrofoam Cooler on the Seismos   Untitled.png 
  2673   Mon Mar 15 09:43:47 2010 steveUpdatePEMmore sandblasting todayDo not open IFO vacuum envelope today!
They are sandblasting again at CES
  
  2674   Mon Mar 15 16:39:36 2010 steveUpdatePEMGuralp2 centered

    
        
 grlp2ffst.jpg 
  2678   Thu Mar 18 08:49:51 2010 steveUpdatePEMGuralp2 centered again ? 
Someone adjusted the Guralp2 mass
position last night??
 grlp2xadj.jpg 
  2685   Fri Mar 19 18:00:14 2010 jenneUpdatePEMGuralp2 centered again[Jenne, Sanjit]
It looks like Steve used a GND-12V
supply to power the Guralp through the little
  
  2686   Fri Mar 19 21:15:33 2010 ranaUpdatePEMGuralp2 centered againThis trend of the last 200 days shows that
GUR2 has been bad forever...until now anyways.
 Untitled.png 
  2687   Fri Mar 19 23:03:41 2010 ranaUpdatePEMGuralp2 centered againI went and double-checked and aligned the
styrofoam cooler at ~5:00 UTC. It was fine,
but we really need a better huddling box.
 huddlez.png 
  2689   Sun Mar 21 19:25:29 2010 ranaUpdatePEMGuralp2 centered againFrom this morning, now in calibrated units,
and with the Güralp self noise spec
from the Güralp manual.
 huddlez.png 
  2694   Mon Mar 22 11:37:09 2010 steveUpdatePEMjackhammeringThere was more jackhammering this morning
just about 20 ft north-west of the beamsplitter
chamber, outside.
 jackhammering2.jpg 
  2701   Tue Mar 23 10:11:13 2010 steveUpdatePEM small air cond unit failed yesterdayOld control room air condition failed yesterday
around noon. It was blowing 80-85F hot air
for about 2-3 hours at racks 1Y4-7 and the
 20datm.jpg 
  2713   Thu Mar 25 09:07:08 2010 steveUpdatePEMGuralp2 x problem is back

    
        
 grlp2xproblm.jpg 
  2743   Wed Mar 31 16:31:44 2010 steveUpdatePEMGuralp interface box turned off

    
        
 grlpntrfcbxoff.jpg 
  2764   Mon Apr 5 01:02:07 2010 ranaUpdatePEMGuralp interface box turned offI was
checking into the Guralp situation today.
I put the rubber balls underneath the granite
 Untitled.png 
  2765   Mon Apr 5 08:43:48 2010 steveUpdatePEMearthquake mag 7.2Large
earthquake shakes Baja California, Mexico
and 6 over Magnitude 5 aftershakes follow. 
 eq7.2.jpg 
  2778   Wed Apr 7 09:00:01 2010 steveHowToPEMprepare to open chamberIn order to minimize the diffusion of more
dust particles into the vented IFO vacuum
envelope
 0.5micron.jpg 
  2802   Fri Apr 16 17:26:23 2010 JenneUpdatePEMGuralp Breakout Box pulledI
pulled the Guralp breakout box from the rack,
and it's sitting on the EE bench here. 
  
  2811   Tue Apr 20 00:32:30 2010 JenneUpdatePEMGuralp Breakout Box put back


   
        
            
 Gur2X_before_20Apr2010.jpgGur2X_after_replace_100k_resistors_20Apr2010.jpg 
  2825   Wed Apr 21 15:53:57 2010 JenneUpdatePEMSeismometers now on the granite slabThe 3 seismometers are now on the granite
slab.  The Ranger is now aligned with
the Xarm (perpendicular to the Mode Cleaner)
 P4210048.JPG 
  2831   Thu Apr 22 09:03:54 2010 steveOmnistructurePEMaircondition can not be turned offKoji and I wanted to turn off the IFO-room
AC so the wind would not blow on MC1-3. We
could not. The switches were probably bypassed
  
  2833   Thu Apr 22 20:28:40 2010 JenneUpdatePEMSeismometer Noise Characteristics


   
        
            
 Gur1_Gur2_noise.png 
  2842   Mon Apr 26 11:13:28 2010 steveOmnistructurePEMAC on/off is working


   
        
            
  
  2889   Thu May 6 18:25:20 2010 JenneUpdatePEMAcc power supply turned onThe accelerometer power supply / preamp
board has been OFF because of exciting new
accelerometer measurements.  It's now
  
  2890   Thu May 6 18:43:58 2010 ranaUpdatePEMNoise floor of the Ranger SeismometerI
added a noise model of the SR560 to the LISO
opamp.lib. This assumes you're
 ranger.pdf 
  2892   Thu May 6 19:51:22 2010 JenneUpdatePEMNew 'Seismic Spectrum of the 40m'For reasons unknown, the seismic spectra
posted above Rosalba has been wrong since
~January when it was first posted. 
 SeisRef_6May2010_AccelCalFudged.png 
  2934   Fri May 14 16:19:22 2010 JenneUpdatePEMGuts of a Guralp[Jenne, Rana]
We took apart and examined one of
the Guralp seismometers this afternoon. 
  
  2972   Mon May 24 07:53:57 2010 steveConfigurationPEMair cond. just turned ONIFO room temp 27.5C , Please remember to
turn AC back on !
 acoff.jpg 
  3002   Thu May 27 23:59:54 2010 ranaUpdatePEMNew Foam Box installedValera
and I put the 2 Guralps and the Ranger onto
the big granite slab and then put the new
 Untitled.png 
  3003   Fri May 28 00:40:53 2010 ranaUpdatePEMDAQ down Although trends are available, I
am unable to get any full data from in the
past (using DTT or DV). I started the FB's
  
  3005   Fri May 28 10:44:47 2010 josephbUpdatePEMDAQ down

    
        
  
  3006   Fri May 28 11:26:35 2010 JenneUpdatePEMNew Foam Box installed


   
        
            
  
  3017   Sun May 30 17:51:04 2010 kiwamuHowToPEMAllegra dataviewerI found the dataviewer didn't work only
on Allegra. This thing sometimes happened
as described in
  
  3018   Sun May 30 22:18:49 2010 ranaUpdatePEMGranite slab w/ lead balls is so far a flopThe seismometers showed an increased
noise in the Y-direction when put on top
of the granite slab. By tapping the slab,
  
  3022   Mon May 31 22:52:57 2010 ranaUpdatePEMGranite slab w/ lead balls is so far a flopThis plot shows the noise with the box
on, but no granite. We're still pretty far
off from the Guralp data sheet.
 Untitled.pnghuddlez.pnghuddlez.png 
  3024   Tue Jun 1 11:47:14 2010 steveUpdatePEMlead balls on concrete


   
        
            
 P1060269.JPG 
  3025   Tue Jun 1 15:51:42 2010 steveUpdatePEMfoam box for good thermal stabilityThis box was made  to provide good
thermal stability for seismometer calibration.
There is an inner solid shell of 0.064"
 albx2.PDF 
  3037   Wed Jun 2 18:09:32 2010 steveUpdatePEMseismometers off of linoleum floorSteve for Nancy,
Seismometer interface box ac power
was turned off, Guralps disconnected and
  
  3039   Wed Jun 2 21:21:43 2010 steveUpdatePEMseismometers off of linoleum floor
  
  3047   Thu Jun 3 22:17:05 2010 ranaUpdatePEMseismometers off of linoleum floor At ~2350 UTC on June 2, the seismometers
were turned off. After the granite slab was
repositioned with the new lead, the Ranger
 Untitled.pnga.pngUntitled.png 
  3050   Fri Jun 4 23:52:57 2010 ranaUpdatePEMseismometers off of linoleum floor   Untitled.pnghuddlez.png 
  3056   Tue Jun 8 18:39:36 2010 ranaUpdatePEMDAQ down

    
  
  3057   Tue Jun 8 20:52:25 2010 josephbUpdatePEMDAQ up (for the moment)As a test, I did a remote reboot of both
Megatron and c1iscex, to make sure there
was no code running that might interfere
  
  3060   Wed Jun 9 19:47:08 2010 nancyUpdatePEMlead balls on concrete


   
        
            
  
  3062   Thu Jun 10 07:53:14 2010 AlbertoUpdatePEMLaTeXlabs


   
        
            
  
ELOG V3.1.3-