40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 256 of 354  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  3205   Tue Jul 13 11:51:19 2010 JenneUpdatePEMGur1 has no signal?!?!?!?![Sanjit, Jenne]
Sanjit discovered that the Gur1 channels
are all digital 0.  We determined that
 Gur1_noSignal_13Jul2010.png 
  3211   Tue Jul 13 23:20:37 2010 JenneUpdatePEMGur1 has no signal?!?!?!?!

    
        
  
  3267   Thu Jul 22 13:44:47 2010 JennaUpdatePEMGuralp seismometerOne of the Guralps [Gur2] has been taken
to the atf gyro lab, along with the breakout
box.
  
  3277   Fri Jul 23 15:32:02 2010 steveUpdatePEMcontrol room AC set point changedThe control room temp is warmer than usual.
The heat exchanger Office Pro 18 set point
was lowered from 70 to 68F yesterday.
  
  3288   Mon Jul 26 08:51:31 2010 steveUpdatePEM lowering AC setpoint by 2F makes PSL happy

    
        
 htempRTemp.jpg 
  3297   Tue Jul 27 11:43:24 2010 steveUpdatePEMair quality is bad todayThe lab is at 30,000 and Pasadena air is
at 1.1 e+6 particles /cf min of 0.5 micron.
 pemtoday.jpg 
  3334   Fri Jul 30 17:24:22 2010 JenneUpdatePEMGuralps back in the 40mI brought the GUR2 seismometer back from
Bridge so I can get some more MC/Seismic
data during the next week while we're pumped
  
  3349   Mon Aug 2 18:02:46 2010 JenneUpdatePEMSeismometer Update: Still not good, but perhpas getting betterToday's seismometer diagnosis activities
are still underway, this is just an update
(since I did some reboots):
  
  3351   Tue Aug 3 01:51:01 2010 JenneUpdatePEMSeismometer Update: Still not good, but perhaps getting better


   
        
            
  
  3354   Tue Aug 3 11:50:16 2010 JenneUpdatePEMSeismometer Problem Tracked downAfter some cable swapping this morning,
I have determined which cable is bad. 
It's the Gur1 cable between the seismometer
  
  3355   Wed Aug 4 01:44:56 2010 KojiConfigurationPEMAccelerometer located on and below the PSL table[Jenne and Koji] 
In order to characterize the seismic vibration
 IMG_2675.jpgIMG_2678.jpgIMG_2682.jpg 
  3356   Wed Aug 4 03:01:56 2010 JenneUpdatePEMCatastrophic Cable Failures


   
        
            
  
  3362   Wed Aug 4 20:15:07 2010 JenneUpdatePEMYay! Guralps work again!After much hassle, the Guralp cable from
the ADC Out of the breakout box to the ADC
is fixed, and 
  
  3395   Tue Aug 10 22:40:55 2010 KojiSummaryPEMAccelerometer located on and below the PSL tableResult
of the accelerometer measurement
Introduction

We wanted to characterize
 PEM_100809.pdf 
  3422   Fri Aug 13 18:32:48 2010 steveUpdatePEM new legs attached to optical tableKoji, Rana and Steve
 
The floor preparation continued today.
 P1060612.JPGP1060626.JPGP1060631.JPGP1060636.JPG 
  3430   Tue Aug 17 14:09:15 2010 steveUpdatePEMPSL optical table schedule Tuesday, 17 August : fill tunnel, set table
height, level table and balance load
Wednesday : grout tripod legs and
  
  3435   Wed Aug 18 16:42:14 2010 steveUpdatePEMPSL optical table legs load balanced 
 Rana, Koji, Alberto and Steve,
Tuesday afternoon
 P1060671.JPGP1060674.JPGP1060670.JPGP1060676.JPG 
  3444   Thu Aug 19 16:03:59 2010 steveUpdatePEMgrouting of PSL tripod legsThe 10' x 6' optical table is seating on
6 tripods. Each tripod leg has 3 feet. They
are supported by jack screws against copper
 P1060687.JPGP1060681.JPGP1060686.JPGP1060696.JPG 
  3448   Fri Aug 20 15:49:14 2010 steveUpdatePEMgrouting is doneThe preparation for pouring concrete is
continuing. The grout forms were removed.
Half inch ribbed steel bars were epoxied
 P1060699.JPGP1060700.JPGP1060704.JPG 
  3449   Fri Aug 20 16:17:35 2010 steveUpdatePEMPEM-count channels are not workingC1: PEM-count channels are dead since August
12, 2010
  
  3462   Tue Aug 24 11:23:32 2010 steveUpdatePEMtripod leg installation completedBertine Robby, Bertin and Jerry completed
the installation by pouring concrete yesterday
and cleaning up today.
 7x 
  3472   Wed Aug 25 16:13:32 2010 steveSummaryPEMPSL optical table is back into operation at 32.75" levelThe tile work was done yesterday after
noon.
This morning Mike Gerfen and me lowered
 P1060764.JPGP1060768.JPGP1060777.JPGP1060776.JPGP1060780.JPG 
  3477   Fri Aug 27 11:27:33 2010 steveUpdatePEMcrane safety documentI posted the crane safety document on the
40m wiki, vacuum page as 26 August 2010
Please add your comments and corrections.
  
  3493   Tue Aug 31 10:44:17 2010 steveUpdatePEMconcrete sealedThe PSL -leg concrete was sealed with a
single coat of SCOFIELD Cureseal-S to minimize
shedding of particles.
 P1060787.JPG 
  3495   Tue Aug 31 13:31:00 2010 steveUpdatePEMroom temp loweredI lowered room 101 thermostat setting from
74F to 72F
  
  3496   Tue Aug 31 14:47:53 2010 steveConfigurationPEMtoilet upgradeOur toilets were replaced by a green Gerber
1.6 gpf ( 6 lpf ) last week.
 toil-n.JPG 
  3497   Tue Aug 31 15:26:46 2010 ranaUpdatePEMroom temp loweredAnd I raised it back to 73F. The thermometers
on the wall show 74-75F as the actual room
temp. The dial on the temperature controller
  
  3505   Wed Sep 1 10:54:15 2010 steveUpdatePEM more crane balancing Crane balancing at the south end is continuing
today.
  
  3513   Thu Sep 2 14:11:17 2010 steveSummaryPEMsouth end crane balancing is completedThe crane I -beam now leveled at all degrees
of rotation.  The lower hinge was moved
southward  about 1/4 of an inch. 
 P1060798.JPGP1060800.JPGP1060804.JPG 
  3547   Wed Sep 8 16:17:58 2010 steveUpdatePEMparticle counter problemI played with the particle counter this
morning. Now it's running and reading the
correct numbers on the old COCHECKLIST.adl
  
  3551   Thu Sep 9 11:31:54 2010 steveUpdatePEMaccelerometer cable connectionI turned off/on the power to the accelerometers
in order to re rout their connections. I
found cable connector body-nut  #3 loose
  
  3585   Fri Sep 17 17:35:35 2010 steveUpdatePEMcleaned up at 1Y1 PSL rackCleaned up cables on the top and bottom.
Vacuumed both areas. We still have some remaining
shading from the MOPA umbilical and more
  
  3646   Tue Oct 5 09:26:04 2010 steveConfigurationPEMmoved accelerometersAccelerometers xyz were moved from IOO-south/west 
corner to under PSL table. They were turned
off for ~20 minutes.
  
  3752   Thu Oct 21 12:15:02 2010 ranaUpdatePEM6.9 Mag EQ in Gulf of California

   
        
            Magnitude
  
  3808   Thu Oct 28 09:16:17 2010 steveUpdatePEMwelding in the vertex areaFire-smoke sensors in the vertex area #2-31,
2-30 east, 2-32 south/MC2 and 2-37 old control
room area are turned off to accommodate the
  
  3810   Thu Oct 28 13:01:34 2010 steveUpdatePEMcrane repair guys left for the day


   
        
            
  
  3894   Thu Nov 11 11:08:26 2010 steveBureaucracyPEMAP table found openPlease remember to cover the optical tables
!
  
  3977   Tue Nov 23 14:52:28 2010 JenneUpdatePEMPEM Model StartedJoe showed me what was what with adding
DAQ channels, and I have begun building a simulink
  
  3985   Wed Nov 24 18:11:26 2010 JenneUpdatePEMSome progress on getting PEM channelsI have made a little bit of progress on
the PEM channels.  I have begun writing
up detailed instructions in the
  
  4061   Wed Dec 15 18:29:59 2010 JenneUpdatePEMSeismometer Channels Being Recorded AgainThe Seismometer channels are once more
being recorded.  Alastair brought Gur1
back from the ATF the other day, and today
  
  4165   Tue Jan 18 10:25:23 2011 steveUpdatePEMvertex crane work this weekThe crane people are here. The Vertex chambers
are covered with plastic. The PSL HEPAs will
be running on high during the day.
  
  4269   Thu Feb 10 11:16:31 2011 steveUpdatePEMsouth arm AC turned onThe air condition was off for the south
arm. I  turned it on.
  
  4386   Tue Mar 8 15:23:16 2011 steveUpdatePEMclean room glovesAnsell
AccuTech
91-300 clean
  
  4484   Mon Apr 4 11:52:13 2011 JenneUpdatePEMSTS2s unpackedI unpacked the STS2 seismometers that we
borrowed from LLO.  They are sitting
underneath the Xarm, in the middle of the
  
  4550   Thu Apr 21 08:26:42 2011 steveUpdatePEMPSL enclosure work todayThe east side window guides  will
be replaced by one long U-channel. There
will be drilling into 2x2 steel frame. It
  
  4553   Thu Apr 21 15:20:46 2011 steveUpdatePEMPSL enclosure work today

    

       
            
 P1070558.JPGP1070560.JPG 
  4825   Wed Jun 15 16:37:56 2011 JenneUpdatePEMPEM AA Board has been diagnosed and fixed[Jenne, Steve]
After talking with Steve, I had a
look at the PEM's AA board, to see what the
 1X7_AAboard_connector_fix.pdf 
  4826   Thu Jun 16 00:39:08 2011 KojiUpdatePEMPEM AA Board has been diagnosed and fixedAs
seen in the photo, the board has a strange
bulge 
  
  4937   Tue Jul 5 08:32:38 2011 steveUpdatePEMbad air quality in the labThe fireworks of yesterday showing up in
the lab. Pasadena out side air 6.6 million 
cfm for 0.3 micron particles  and 1.5
 badaq.jpgjuly4pem.jpg 
  5018   Fri Jul 22 14:22:13 2011 Ishwita, ManuelUpdatePEMSTS-2 seismometer hardware testingWe have two STS-2 seismometer boxes...
the blue
box & the 
  
ELOG V3.1.3-