  4700   Thu May 12 08:54:11 2011 steveUpdateIOOIP_POS cable found

    

       
            
  
  4699   Thu May 12 05:25:26 2011 kiwamuUpdateIOOIP_POS disconnectedA
cable for IP_POS has been disconnected at
the LSC rack, 1Y2. Due to it currently no
  
  4698   Thu May 12 02:31:07 2011 SureshUpdateRF Systeminstallation of RF splitters in Demod boards[Jamie, Koji, Suresh]
We replaced splitters in several
demod boards as per the table given below:
  
  4697   Thu May 12 00:59:45 2011 ryan, ranaUpdatePSLReturn of the PSL temperature boxThe PSL temperature box has returned to
service, with some circuit modifications.
The 1k resistors on all the temp. sensor
  
  4696   Wed May 11 23:02:52 2011 valeraUpdateASSDither angular stabilizitaion system updateThis is what was done in past two days:
- The ETMY and ITMY pitch and yaw
dofs are modulated at 40, 44, 42, 46 Hz respectively
  
  4695   Wed May 11 22:54:53 2011 JenneUpdateTreasureETMY trans QPD installedI put the ETMY trans QPD in. 
The ETMY trans beam was already going
toward the TRY DC PD, and a CCD camera. 
  
  4694   Wed May 11 22:52:55 2011 kiwamuUpdateLSCstatus update and planRana forced
me to write this entry for summary because
  
  4693   Wed May 11 21:58:30 2011 ranaUpdateSUSETMX_OPLEV : He-Ne replaced

    
        
  
  4692   Wed May 11 17:20:24 2011 kiwamuConfigurationIOOloop diabled on PZT2[Valera / Kiwamu]
 
  
  4691   Wed May 11 17:10:04 2011 kiwamuConfigurationElectronicsfixed : MC3 LL PD has no signal[Valera / Kiwamu]
It was because of a loose connection.
Pushing the connector solved the issue.
 looseconnectionMC3.png 
  4690   Wed May 11 16:04:36 2011 Larisa ThorneConfigurationElectronicsJenne-Seismometer LPF projectThe schematic for the seismometer box from
this last
time  has been updated...
 STS2diagram2.png 
  4689   Wed May 11 13:54:32 2011 steveUpdateLSCLSC power suppliesAux- rack _1Y2 is just behind 1Y3 
It contains Kepco Analoge DC power supplies
for +- 5, 15 and 24V
 P1070679.JPG 
  4688   Wed May 11 11:44:52 2011 kiwamuUpdateSUSf2p filters installed on ITMYNew f2p
filters were installed on 
 f2p_itmy.png 
  4687   Wed May 11 11:24:59 2011 steveUpdateSUSSRM-oplev qpd is back

    

       
            
 srm-prm_oplevs.jpg 
  4686   Wed May 11 11:05:45 2011 steveUpdateSUSETMX_OPLEV : He-Ne replaced

    

       
            
 P1070672.JPG 
  4685   Wed May 11 10:49:16 2011 valeraConfigurationElectronicsMC3 LL PD has no signalYesterday we found that MC3 OSEM LL PD
did not have a sensible signal - the readback
was close to zero and it was making MC move
  
  4684   Wed May 11 00:23:21 2011 kiwamuUpdateASCY arm and beam pointing alignment[Jamie / Valera / Kiwamu]
 The incident
  
  4683   Tue May 10 23:14:01 2011 kiwamuUpdateSUSETMX_OPLEV : He-Ne laser dead ?I
found that a He-Ne laser which has been used
for ETMX_OPLEV was NOT giving the light.
  
  4682   Tue May 10 22:56:17 2011 kiwamuUpdateSUSf2p filters installed on ETMYNew f2p filters
were installed on ETMY.  
 f2p_etmy.png 
  4681   Tue May 10 20:57:05 2011 ranaUpdatePSLPSL reference cavity temperature box modifications : after 24 hours still OK

    
        
 Untitled.png 
  4680   Tue May 10 16:45:19 2011 josephbUpdateCDSc1ass now receiving AS55I from c1lsc[Valera, Joe]
We added a cdsPCIx_SHMEM connection
between the c1lsc and c1ass models. 
  
  4679   Tue May 10 16:42:49 2011 josephbUpdateCDSNew upconversion model (c1uct)[Ryan, Joe]
Ryan added the c1uct (upconversion
tester) model to the c1ioo machine.  
  
  4678   Tue May 10 11:14:44 2011 steveUpdatePSLPSL-QPD_ANG qpd optimizedValera and I placed F 572.7 mm lens ~15
cm away  from the ang  qpd (in
the same mount with ND filter) so that two
 qpdangl.jpg 
  4677   Tue May 10 10:06:23 2011 josephbUpdatePSLFixed channel names for PSL QPDs, fixed saturation, changed signsI added calculation entries to the /cvs/cds/caltech/target/c1iool0/c1ioo.db
file which are named C1:IOO-QPD_*_*, as the
channels were originally named.  These
  
  4676   Tue May 10 09:05:49 2011 KojiUpdateGeneralaLIGO BBPD / Green PD investigationBBPD update
- The BBPD circuit has been constructed
on the aLIGO BBPD board
 PD_response.pdf 
  4675   Tue May 10 01:39:41 2011 SureshUpdateRF SystemRF source troublesToday after Steve and I finished the RF
cabling work for the day, Kiwamu noticed
that there were no RF signals to be seen. 
  
  4674   Tue May 10 00:44:52 2011 valeraUpdateIOOMC2 centeringKiwamu, Koji, Valera
We centered the beam on MC2 in pitch
by moving the MC1,2,3 in the following combination
 mc2centering.pdf 
  4673   Tue May 10 00:31:28 2011 kiwamuUpdateASCIFO alignment planThe alignment of the interferometer
goes basically step by step.
Tuesday will be an alignment day.
  
  4672   Mon May 9 20:30:20 2011 ranaUpdatePSLPSL reference cavity temperature box modificationsI re-installed the box (@ ~8:15) after
reflowing some of the solder joints. I will
observe it over night and then remove the
 Untitled.png 
  4671   Mon May 9 18:54:29 2011 kiwamuUpdateLSCtriggerd locking logic : screen preparedI made a new medm screen for the triggering
logics. Have fun.
I put a button on C1LSC.adl to invoke
 trigger_medm.png 
  4670   Mon May 9 17:23:25 2011 SureshUpdateRF SystemRF Cables near LSC Rack[Steve, Suresh]
We started to clean up the RF cables
(heliax and PD interface cables)  at
  
  4669   Mon May 9 17:21:13 2011 JamieBureaucracyCDS!!!!REMEMBER TO COMMIT YOUR MODIFICATIONS!!!!Also, remember to update the svn working
copy before you begin doing any work, to
make sure you're working on the most recent
  
  4668   Mon May 9 16:58:23 2011 JamieBureaucracyCDS!!!!REMEMBER TO COMMIT YOUR MODIFICATIONS!!!!Whenever you modify any of the front-end
code in /opt/rtds/caltech/c1/userapps, such
as models, scripts or medm screens, REMEMBER
  
  4667   Mon May 9 16:12:49 2011 JamieConfigurationCDScanonicalize paths to core and userappsI have updated the /opt/rtcds paths to
reflect the new specification of the CDS
aLIGO code release procedures document.
  
  4666   Mon May 9 15:21:36 2011 josephbUpdatePSLFixed channel names for PSL QPDs, fixed saturation, changed signs[Valera,
Joe]
Software
  
  4665   Mon May 9 13:14:48 2011 josephbUpdateLSCC1:LSC-TRIG_MTRX : wrong matrix size[Joe,
Kiwamu]
There
  
  4664   Mon May 9 12:33:40 2011 kiwamuUpdateLSCC1:LSC-TRIG_MTRX : wrong matrix sizeI found
that C1:LSC-TRIG_MTRX has a wrong matrix
  
  4663   Mon May 9 09:37:51 2011 valeraUpdatePSLPSL and MC trendsThe attached plot shows 7 day trends of
the MC and PMC power levels, PSL QPDs, and
temperature. The MC stayed locked for ~40
 pslmcdrift2.pdf 
  4662   Sun May 8 22:59:40 2011 ranaUpdatePSLPSL reference cavity temperature box modificationsI looked at the PSL temperature box. It
started out as D980400-B-C. Then it was revised
by Peter King as per the LHO mods E020247.
  
  4661   Sun May 8 17:29:01 2011 ranaUpdateIOOMC beam spot centeringIt seems like the best option would be
to make the MCASS just adjust the SUS biases
and center the beams on the suspended optics.
  
  4660   Sun May 8 16:32:52 2011 valeraUpdateIOOMC beam spot centering Kiwamu told me that the CDS matrix
notation has changed and the 40m front end
code has changed since February. I changed
  
  4659   Sat May 7 18:08:54 2011 valeraUpdateIOOMC beam spot centering scriptI tried to run the scripts/senseMCdecentering
to check the centering of the MC beam spots
on the mirrors. The script (csh) produces
 mcditherlines2.pdf 
  4658   Sat May 7 12:57:54 2011 KojiSummaryGeneralaLIGO BBPD / Green PD investigationThe RF amplifier of the prototype BBPD
has been replaced from ERA-5SM to MAR-6SM.
 PD_response.pdf 
  4657   Sat May 7 10:59:11 2011 SureshUpdateRF SystemRF Source filters changed 
The
SLP-50 filters which were on the 55 MHz lines
 RF_Source_Schematic.pngRF_Source.jpg 
  4656   Sat May 7 02:52:53 2011 kiwamuUpdateLSCTRY photo diode installed[Suresh / Kiwamu]
 We
installed the TRY photo diode (Thorlabs one)
  
  4655   Fri May 6 17:11:55 2011 steveUpdateSUSSRM-oplev cable The SRM qpd cable was removed from the
BS-table. It's path was changed from 1x4
to ITMY-table following the inner cable tray.
  
  4654   Fri May 6 15:59:40 2011 steveUpdateVACTP3 fore pump replacedDry fore pump of TP3 replaced by brand
new Varian SH-110  at  1.1 Torr_75,208
hrs
  
  4653   Fri May 6 15:42:55 2011 valeraMetaphysicsIOOInput mode cleaner length and 11 MHz modulation frequency After Kiwamu set the REFL11 phases
in the PRMI configuration (maximized PRM->REFL11I
reesponse) I tried to measure the MC length
  
  4652   Fri May 6 14:59:36 2011 Leo SingerConfigurationSUSTuning ITMY bandstopI tuned the ITMY bandstops -- 'before'
and 'after' spectra attached.  Note
that the after the tuning, the bounce mode
 itmy-before.pdfitmy-after.pdfitmy-nobounceroll.pdf 
  4651   Fri May 6 10:20:00 2011 steveSummarySAFETY2011 safety auditThe emphasis of this annual safety audit 
was on  safe  electrical housekeeping
on March 3, 2011
 sa2011done1.pdfP1070448.JPG 