40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 247 of 344  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  3006   Fri May 28 11:26:35 2010 JenneUpdatePEMNew Foam Box installed


   
        
            
  
  3017   Sun May 30 17:51:04 2010 kiwamuHowToPEMAllegra dataviewerI found the dataviewer didn't work only
on Allegra. This thing sometimes happened
as described in
  
  3018   Sun May 30 22:18:49 2010 ranaUpdatePEMGranite slab w/ lead balls is so far a flopThe seismometers showed an increased
noise in the Y-direction when put on top
of the granite slab. By tapping the slab,
  
  3022   Mon May 31 22:52:57 2010 ranaUpdatePEMGranite slab w/ lead balls is so far a flopThis plot shows the noise with the box
on, but no granite. We're still pretty far
off from the Guralp data sheet.
 Untitled.pnghuddlez.pnghuddlez.png 
  3024   Tue Jun 1 11:47:14 2010 steveUpdatePEMlead balls on concrete


   
        
            
 P1060269.JPG 
  3025   Tue Jun 1 15:51:42 2010 steveUpdatePEMfoam box for good thermal stabilityThis box was made  to provide good
thermal stability for seismometer calibration.
There is an inner solid shell of 0.064"
 albx2.PDF 
  3037   Wed Jun 2 18:09:32 2010 steveUpdatePEMseismometers off of linoleum floorSteve for Nancy,
Seismometer interface box ac power
was turned off, Guralps disconnected and
  
  3039   Wed Jun 2 21:21:43 2010 steveUpdatePEMseismometers off of linoleum floor
  
  3047   Thu Jun 3 22:17:05 2010 ranaUpdatePEMseismometers off of linoleum floor At ~2350 UTC on June 2, the seismometers
were turned off. After the granite slab was
repositioned with the new lead, the Ranger
 Untitled.pnga.pngUntitled.png 
  3050   Fri Jun 4 23:52:57 2010 ranaUpdatePEMseismometers off of linoleum floor   Untitled.pnghuddlez.png 
  3056   Tue Jun 8 18:39:36 2010 ranaUpdatePEMDAQ down

    
  
  3057   Tue Jun 8 20:52:25 2010 josephbUpdatePEMDAQ up (for the moment)As a test, I did a remote reboot of both
Megatron and c1iscex, to make sure there
was no code running that might interfere
  
  3060   Wed Jun 9 19:47:08 2010 nancyUpdatePEMlead balls on concrete


   
        
            
  
  3062   Thu Jun 10 07:53:14 2010 AlbertoUpdatePEMLaTeXlabs


   
        
            
  
  3139   Tue Jun 29 20:47:19 2010 JenneUpdatePEMTerminator put on Guralp BoxA little D-sub terminator was put on the
Gur1 input to the Guralp box, to check again
the noise level of the box.
  
  3147   Wed Jun 30 14:38:04 2010 JenneUpdatePEMGuralp terminator is switchedI moved the Guralp box's input terminator
from Gur1 to Gur2 a minute or so ago to check
the other channels.
  
  3149   Wed Jun 30 17:30:54 2010 JenneUpdatePEMSeismometers moved for MC Wiener workNow that the MC is back up and running,
I put the Guralp seismometers at the ends
of the mode cleaner.  Gur1 is near MC2,
  
  3153   Thu Jul 1 14:03:40 2010 josephbUpdatePEMTemporary disconnect of some PEM channels for ~20 minutesIn order to identify the output adapter
of the BNC patch panel used for about 20
PEM channels, I had to disconnect its power
  
  3154   Thu Jul 1 14:28:39 2010 JenneUpdatePEMMC1 Accelerometers in placeKevin sent me an email with top secret
info on where one of the other accelerometer
cubes was hiding (it was with his shaker
  
  3161   Tue Jul 6 17:29:04 2010 ChipUpdatePEMThe Ranger is mine!    
  3192   Mon Jul 12 10:23:51 2010 steveUpdatePEMair condition maintenance is todayThe AC filters will be checked and/or replaced
today. This means the AC will be off for
sort periods of time. Temperature and particle
 pem2y.jpg 
  3205   Tue Jul 13 11:51:19 2010 JenneUpdatePEMGur1 has no signal?!?!?!?![Sanjit, Jenne]
Sanjit discovered that the Gur1 channels
are all digital 0.  We determined that
 Gur1_noSignal_13Jul2010.png 
  3211   Tue Jul 13 23:20:37 2010 JenneUpdatePEMGur1 has no signal?!?!?!?!

    
        
  
  3267   Thu Jul 22 13:44:47 2010 JennaUpdatePEMGuralp seismometerOne of the Guralps [Gur2] has been taken
to the atf gyro lab, along with the breakout
box.
  
  3277   Fri Jul 23 15:32:02 2010 steveUpdatePEMcontrol room AC set point changedThe control room temp is warmer than usual.
The heat exchanger Office Pro 18 set point
was lowered from 70 to 68F yesterday.
  
  3288   Mon Jul 26 08:51:31 2010 steveUpdatePEM lowering AC setpoint by 2F makes PSL happy

    
        
 htempRTemp.jpg 
  3297   Tue Jul 27 11:43:24 2010 steveUpdatePEMair quality is bad todayThe lab is at 30,000 and Pasadena air is
at 1.1 e+6 particles /cf min of 0.5 micron.
 pemtoday.jpg 
  3334   Fri Jul 30 17:24:22 2010 JenneUpdatePEMGuralps back in the 40mI brought the GUR2 seismometer back from
Bridge so I can get some more MC/Seismic
data during the next week while we're pumped
  
  3349   Mon Aug 2 18:02:46 2010 JenneUpdatePEMSeismometer Update: Still not good, but perhpas getting betterToday's seismometer diagnosis activities
are still underway, this is just an update
(since I did some reboots):
  
  3351   Tue Aug 3 01:51:01 2010 JenneUpdatePEMSeismometer Update: Still not good, but perhaps getting better


   
        
            
  
  3354   Tue Aug 3 11:50:16 2010 JenneUpdatePEMSeismometer Problem Tracked downAfter some cable swapping this morning,
I have determined which cable is bad. 
It's the Gur1 cable between the seismometer
  
  3355   Wed Aug 4 01:44:56 2010 KojiConfigurationPEMAccelerometer located on and below the PSL table[Jenne and Koji] 
In order to characterize the seismic vibration
 IMG_2675.jpgIMG_2678.jpgIMG_2682.jpg 
  3356   Wed Aug 4 03:01:56 2010 JenneUpdatePEMCatastrophic Cable Failures


   
        
            
  
  3362   Wed Aug 4 20:15:07 2010 JenneUpdatePEMYay! Guralps work again!After much hassle, the Guralp cable from
the ADC Out of the breakout box to the ADC
is fixed, and 
  
  3395   Tue Aug 10 22:40:55 2010 KojiSummaryPEMAccelerometer located on and below the PSL tableResult
of the accelerometer measurement
Introduction

We wanted to characterize
 PEM_100809.pdf 
  3422   Fri Aug 13 18:32:48 2010 steveUpdatePEM new legs attached to optical tableKoji, Rana and Steve
 
The floor preparation continued today.
 P1060612.JPGP1060626.JPGP1060631.JPGP1060636.JPG 
  3430   Tue Aug 17 14:09:15 2010 steveUpdatePEMPSL optical table schedule Tuesday, 17 August : fill tunnel, set table
height, level table and balance load
Wednesday : grout tripod legs and
  
  3435   Wed Aug 18 16:42:14 2010 steveUpdatePEMPSL optical table legs load balanced 
 Rana, Koji, Alberto and Steve,
Tuesday afternoon
 P1060671.JPGP1060674.JPGP1060670.JPGP1060676.JPG 
  3444   Thu Aug 19 16:03:59 2010 steveUpdatePEMgrouting of PSL tripod legsThe 10' x 6' optical table is seating on
6 tripods. Each tripod leg has 3 feet. They
are supported by jack screws against copper
 P1060687.JPGP1060681.JPGP1060686.JPGP1060696.JPG 
  3448   Fri Aug 20 15:49:14 2010 steveUpdatePEMgrouting is doneThe preparation for pouring concrete is
continuing. The grout forms were removed.
Half inch ribbed steel bars were epoxied
 P1060699.JPGP1060700.JPGP1060704.JPG 
  3449   Fri Aug 20 16:17:35 2010 steveUpdatePEMPEM-count channels are not workingC1: PEM-count channels are dead since August
12, 2010
  
  3462   Tue Aug 24 11:23:32 2010 steveUpdatePEMtripod leg installation completedBertine Robby, Bertin and Jerry completed
the installation by pouring concrete yesterday
and cleaning up today.
 7x 
  3472   Wed Aug 25 16:13:32 2010 steveSummaryPEMPSL optical table is back into operation at 32.75" levelThe tile work was done yesterday after
noon.
This morning Mike Gerfen and me lowered
 P1060764.JPGP1060768.JPGP1060777.JPGP1060776.JPGP1060780.JPG 
  3477   Fri Aug 27 11:27:33 2010 steveUpdatePEMcrane safety documentI posted the crane safety document on the
40m wiki, vacuum page as 26 August 2010
Please add your comments and corrections.
  
  3493   Tue Aug 31 10:44:17 2010 steveUpdatePEMconcrete sealedThe PSL -leg concrete was sealed with a
single coat of SCOFIELD Cureseal-S to minimize
shedding of particles.
 P1060787.JPG 
  3495   Tue Aug 31 13:31:00 2010 steveUpdatePEMroom temp loweredI lowered room 101 thermostat setting from
74F to 72F
  
  3496   Tue Aug 31 14:47:53 2010 steveConfigurationPEMtoilet upgradeOur toilets were replaced by a green Gerber
1.6 gpf ( 6 lpf ) last week.
 toil-n.JPG 
  3497   Tue Aug 31 15:26:46 2010 ranaUpdatePEMroom temp loweredAnd I raised it back to 73F. The thermometers
on the wall show 74-75F as the actual room
temp. The dial on the temperature controller
  
  3505   Wed Sep 1 10:54:15 2010 steveUpdatePEM more crane balancing Crane balancing at the south end is continuing
today.
  
  3513   Thu Sep 2 14:11:17 2010 steveSummaryPEMsouth end crane balancing is completedThe crane I -beam now leveled at all degrees
of rotation.  The lower hinge was moved
southward  about 1/4 of an inch. 
 P1060798.JPGP1060800.JPGP1060804.JPG 
ELOG V3.1.3-