40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 241 of 354  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  15485   Wed Jul 15 19:23:44 2020 gautamUpdateGeneralEmergency light on in control roomThe emergency lamps above the exit sign
on the NW entrance to the control room are
on. I tried opening and closing the door,
  
  15487   Wed Jul 15 20:58:40 2020 gautamUpdateGeneralEmergency light on in control roomTrue - it is now not on anymore.




  
  15488   Wed Jul 15 21:08:43 2020 gautamUpdateElectronicsETM coil outputs DQedTo facilitate this investigation, I've
DQed the 4 face coil outputs for the two
ETMs. EX is currently running with 5 times
 CDS.pngcoilOutDQed.png 
  15489   Thu Jul 16 01:12:22 2020 gautamUpdateBHDIn-air BHD - preparing the LO pathAttachment
#1 - The 80mW pickoff
 IMG_8626.JPGIMG_8627.JPGIMG_8628.JPGIMG_8629.JPG 
  15490   Thu Jul 16 14:41:22 2020 gautamUpdateGeneralFire extinguisher inspectionThe (masked) tech accessed all areas in
the lab (office area, control room, VEA)
between ~230pm-3pm. The laser safety goggles
  
  15491   Fri Jul 17 00:18:13 2020 gautamUpdateGeneralLocking updat
I found that an EPICS channel wasn't
reset to the correct value by burtrestore
after the FE bootfest yesterday.

This
  
  15493   Sun Jul 19 15:40:15 2020 gautamUpdateBHDIn-air BHD - CDS and wiring summaryAttachment
#1 shows the proposed
 wiringDiagram.pdf 
  15494   Mon Jul 20 17:23:46 2020 gautamUpdateElectronicsCoil drivers for the test massesSummary:

Looking at the signals to the test
mass coils, it seems borderline
 ALSlock_timeDomain.pdfALSlock.pdfRFlock.pdf 
  15495   Mon Jul 20 17:55:15 2020 gautamUpdateBHDIn-air BHD - preparing the LO pathThe LO pickoff has been coupled into a
fiber with ~90% MM (8 mW / 9 mW input). While
I wait for the DCPD electronics to be found
  
  15497   Tue Jul 21 00:30:24 2020 gautamUpdateBHDIn-air BHD - LO RINAttachment
#1 shows the RIN of
 LO_RIN.pdf 
  15498   Tue Jul 21 16:41:46 2020 gautamUpdateBHDPMC assembly space I decided to use the old EY auxiliary optics
table, which is now stored along the east
arm about 10 m from the end, as a workspace
 IMG_8635.JPG 
  15506   Thu Jul 30 16:16:43 2020 gautamUpdateSUSSuspension recoveryThis
earthquake and friends had tripped all
watchdogs. I used the scripted watchdog re-enabler,
  
  15508   Thu Aug 6 22:57:20 2020 gautamUpdatesafetyNew live HV SuppliesBe aware that there is now a KEPCO HV supply
that is energized, sitting on the floor immediately
adjacent to the OMC rack, east of the AP
  
  15513   Mon Aug 10 16:52:04 2020 gautamUpdateBHDWorkable setup preparedAll the details are in E2000436,
and documents linked from there, I think
an elog would be much too verbose. In summary,
  
  15514   Tue Aug 11 23:20:29 2020 gautamUpdateBHDSome first tests with air BHD setupSome tests done today:

All of these tests were done with
the PRMI locked with carrier resonant in
 PRMI_RFlock.pdfPRMI_RFlock_fullscale.pdf 
  15515   Wed Aug 12 17:36:42 2020 gautamUpdateCDSTiming distribution slot availabilitySee Attachment
#1. J8 was connected
 IMG_8706.JPG 
  15516   Wed Aug 12 17:42:58 2020 gautamUpdateElectronicsPhotodiode inventorySee Attachments
#1 and #2.
 IMG_8709.JPGIMG_8708.JPG 
  15517   Wed Aug 12 18:08:54 2020 gautamUpdateElectronicsNumber of the beastThe "source"
output of the SR785 has a DC offset of -6.66
 IMG_8710.JPG 
  15521   Thu Aug 13 11:30:19 2020 gautamUpdateCDSTiming distribution slot availabilityThat's great. I wonder if we can also
get away with not adding new Dolphin infrastructure.
I'd really like to avoid changing any
  
  15523   Thu Aug 13 18:10:22 2020 gautamUpdateGeneralPower outageThere was a power outage ~30 mins ago that
knocked out CDS, PSL etc. The lights in the
office area also flickered briefly. Working
  
  15524   Fri Aug 14 00:01:55 2020 gautamUpdateCDSBHD / OMC model channels now added to autoburtI added the EPCIS channels for the c1omc
model (gains, matrix elements etc) to the
autoburt such that we have a record of these,
  
  15529   Mon Aug 17 15:18:26 2020 gautamUpdateEquipment loanBeam Profiler + peripherals --> 40mGabriele left the DataRay beam profiler
+ peripherals (see Attachment
 IMG_8719.JPG 
  15530   Mon Aug 17 21:24:43 2020 gautamUpdateGeneralFire extinguisher inspectionA technician came to the lab today at ~4pm.
He entered the VEA (with booties and googles),
and also the clean and bake lab. The whole
  
  15531   Mon Aug 17 23:36:10 2020 gautamUpdateALSWhitening and ALS noiseI finally managed to
install a differential-receiving whitening
board in 1Y2 - 4 channels are available at
 ALSimprovement.pdf 
  15532   Mon Aug 17 23:41:50 2020 gautamUpdateBHDWhitening and air BHD dark noiseSummary:

With the chosen transimpedance
of 300 ohms, in order to be able to see the
 BHD_whitening.pdf 
  15534   Thu Aug 20 00:21:51 2020 gautamUpdateElectronicsFirst look at HV coil driverSummary:

A single channel of this
board was stuffed (and other channels
 IMG_8724.JPGtimeDomain.pdfHVampNoise.pdf 
  15535   Fri Aug 21 15:27:00 2020 gautamUpdateBHDBetter BHD mode-matchingSummary:

The mode-matching between the LO
and AS beams is now ~50%.
 IMG_7548.JPGBHD_MM.pngPRMI_DCPDs.pdf 
  15536   Sun Aug 23 23:36:58 2020 gautamUpdateElectronicsFirst look at HV coil driverSummary:

A more careful analysis has revealed
some stability problems. 
 IMG_5379.JPGstabilityCriterion.pdf 
  15540   Wed Aug 26 00:52:55 2020 gautamUpdateBHDBHD activitiesListing some talking points from the last
week of activity here.


  
  15541   Wed Aug 26 15:48:31 2020 gautamUpdateVACControl screen left open on vacuum workstationI found that the control MEDM screen was
left open on the c1vac workstation. This
should be closed every time you leave the
  
  15542   Wed Aug 26 16:12:25 2020 gautamUpdateElectronicsTest mass coil current requirementsAttachment
#1 is a summary of
 coilCurrents.png 
  15543   Wed Aug 26 22:49:47 2020 gautamUpdateElectronicsCheckout of Trek Model 603I unboxed
the Trek amplifier today, and performed some
basic tests of the functionality. It seems
 IMG_8951.JPG 
  15544   Fri Aug 28 11:41:23 2020 gautamBureaucracysafetyCrane inspection 2020Mr Fred Goodbar of Konacrane was in the
lab 830am-1130am today. All three cranes
in the VEA were inspected, loaded with 450lb
  
  15545   Fri Aug 28 23:33:38 2020 gautamUpdateBHDSome more hardware changesJust a quick set of notes detailing changes
so that there are no surprises, more details
to follow.
  
  15548   Sat Aug 29 22:10:09 2020 gautamUpdateElectronicsWFS characterizationClearly this "riff raff" is referring
to me. It won't help today I guess but
there is one each on the carts holding the
  
  15549   Sat Aug 29 22:46:29 2020 gautamUpdateBHDNew homodyne-phase control electronicsSummary:

The electronics chain used to drive
the three elements of the PI PZT on which
 zetaDrive.pdftrekTFs.pdf 
  15552   Tue Sep 1 15:39:04 2020 gautamUpdateElectronicsHV coil driver oscillations fixedSummary:

Increasing the compensation capacitance
(470 pF now instead of 33 pF) seems to have
 testSetup.pdfHVampNoise_driven.pdf 
  15553   Wed Sep 2 00:49:47 2020 gautamUpdateBHDSome notes about homodyne phaseSummary:

Using a heterodyne measurement
setup to track both quadratures, I estimated
 heterodyneMICH.pdfunwrappedPhase.pdfunwrappedPhase_zoom.pdfphaseNoisePSD.pdf 
  15554   Thu Sep 3 00:00:57 2020 gautamUpdateBHDNew patch cable installed
10m PM1064 cable was installed.
I tried a double shielding approach (photos
tmrw here),
  
  15555   Thu Sep 3 15:55:04 2020 gautamUpdateBHDPhase drift between LO and IFO after fiber replacementSummary:

After replacement of the fiber
delivering the LO beam to the airBHD setup
 LOphaseDrift.pdfphaseDrift_tempCorr.png 
  15562   Mon Sep 7 23:49:14 2020 gautamUpdateBHDA first look at RF44 schemeSummary:

Over the last couple of days, I've
been working towards getting the infrastructure
  
  15564   Tue Sep 8 11:49:04 2020 gautamUpdateCDSSome path changesI edited /diskless/root.jessie/home/controls/.bashrc
so that I don't have to keep doing this
  
  15565   Wed Sep 9 00:05:18 2020 gautamUpdateBHDMore notes on the RF44 schemeSummary:


With the Michelson locked
on a dark fringe, the f2-f1 signal at ~44
 IMG_3397.JPGphaseNoisePSD.pdfmagnitudeHist.pdfLOpowerDrift.png 
  15570   Tue Sep 15 10:57:30 2020 gautamUpdatePSLPMC re-locked, RGA re-enabledThe PMC has been unlocked since September
11 sometime (summary pages are flaky again).
I re-locked it just now. I didn't mess
 RGAscan.pdf 
  15571   Tue Sep 15 12:20:36 2020 gautamUpdateElectronicsSR785 repairedThe unit was repaired and returned to the
40m. Now, with a DMM, I measure a DC offset
value that is ~1% of the AC signal amplitude.
 dividerTF.pdf 
  15572   Tue Sep 15 17:04:43 2020 gautamUpdateElectronicsDC adaptors deliveredThese were delivered to the 40m today and
are on Rana's desk

  
  15573   Tue Sep 15 17:19:09 2020 gautamUpdateIOOMC F spectrum There was an abrupt change in the MC_F
spectrum between August
4 and August
 MCF_MCL.pdf 
  15575   Tue Sep 15 22:11:52 2020 gautamUpdateBHDMore notes on the RF44 schemeSummary:

After more trials, I
 RF44.pdf 
  15576   Wed Sep 16 09:43:41 2020 gautamUpdateIOOMC F spectrum This
elog suggests that there is uniformly
1 stage engaged across all channels. I didn't
 MCF_MCL.pdf 
  15578   Wed Sep 16 17:44:27 2020 gautamUpdateCDSAll vertex FE models restartedI had to make a CDS change to the c1lsc
model in an effort to get a few more signals
into the models. Rather than risk requiring
 CDS.png 
ELOG V3.1.3-