ID Date Author Type Category Subjectup Text Attachments
  2004   Fri Sep 25 19:55:59 2009 JenneUpdateAdaptive FilteringSubtraction of the microseism using Adaptive Filtering![Rana, Jenne]
The OAF system did something useful
today!  Attached is a plot.  Black
 OAF_running_WORKING_25Sept2009.png 
  10310   Thu Jul 31 19:37:59 2014 KojiUpdateIOOSuccessful modification of the FSSQuick note:
Migration
of the 10Hz pole from the output stage of
  
  2577   Mon Feb 8 14:56:17 2010 AlbertoUpdateABSLSuddenly a much better alignment of PRCI just aligned PRM and locked PRC and I
noticed that SPOB is much higehr than it
used to be. It's now about 1800, vs 1200
  
  2578   Mon Feb 8 15:01:46 2010 robUpdateABSLSuddenly a much better alignment of PRC


   
        
            
  
  2579   Mon Feb 8 15:41:51 2010 AlbertoUpdateABSLSuddenly a much better alignment of PRC

    
        
  
  259   Thu Jan 24 12:50:50 2008 JohnSummaryTreasureSugar NapoleonsSome pictures from the group meeting yesterday.  Sweeties.pdf 
  8945   Wed Jul 31 09:51:43 2013 SteveUpdatesafetySujan receives safety trainingSujan got 40m specific basic safety training
this morning.
 IMG_0031.JPG 
  7024   Wed Jul 25 11:25:27 2012 MashaUpdateGeneralSummaryThis week, I have been mainly working on
my new neural network project, and working
with the BLRMS channels.
  
  13601   Fri Feb 2 21:12:46 2018 Udit KhandelwalSummaryGeneralSummary - 2018/02/02Tip-Tilt
Suspension CAD:
Discussed with Koji about motivation
  
  13865   Fri May 18 18:14:18 2018 Udit KhandelwalSummaryGeneralSummary 05/18/2018Tip-Tilt Suspension Design:

Designed a new ECD plate and
changed dimensions of the side arms after
  
  13884   Wed May 23 19:24:37 2018 Udit KhandelwalSummaryGeneralSummary 05/23/2018Tip-Tilt Redesign Project with
Koji:

Did
 ecdplate_eddy.png 
  13638   Fri Feb 16 21:03:17 2018 Udit KhandelwalSummaryGeneralSummary 2018/02/1640m Lab Cad:
Updated the dimensions of and fleshed
out the chambers in greater detail, by referring
  
  13677   Fri Mar 9 20:35:41 2018 Udit KhandelwalSummaryGeneralSummary 2018/03/091. Optical Table Layout 

I had discussed with Koji a way
to record coordinates of optical table equipments
  
  11380   Fri Jun 26 23:18:52 2015 Eve ChaseUpdateCDSSummary Page UpdatesMotivation:

My SURF project largely focuses
on updating and improving the 40m summary
  
  11585   Wed Sep 9 11:33:58 2015 ranaUpdateSummary PagesSummary Page updates
Made most plots in IOO tab only
plot when MC_TRANS > 10000 using Eve's
MC_LOCK state definition.
added
  
  12400   Thu Aug 11 11:51:38 2016 PrafulUpdateComputer Scripts / ProgramsSummary PagesThe summary pages have been updated with
the new naming seismometer channel naming
conventions. Here's a link to them working
  
  7032   Wed Jul 25 17:35:44 2012 LizUpdateComputer Scripts / ProgramsSummary Pages are in the right place!The summary pages can now be accessed from
the "Daily Summary" link under
LOGS on the 40 meter Wiki page.
  
  16893   Mon Jun 6 16:09:23 2022 ranaConfigurationDetCharSummary Pages: seis BLRMSI updated the config file c1pem.ini in
/users/public_html/detcharsummary/ConfigFiles,
and commited it so I hope it works, but I
  
  11884   Tue Dec 15 18:08:22 2015 Max IsiUpdateGeneralSummary archive cleaning cron jobI have added a new cron job in pcdev1 at
CIT using the 40m shared account. This will
run the /home/40m/DetectorChar/bin/cleanarchive
  
  3169   Wed Jul 7 17:05:30 2010 steve, ranaUpdateSAFETYSummary of Crane Damage/MalfunctionThe 1 Ton yellow crane support beam
jammed up at Friday morning, June 25.
 
 10x 
  13472   Wed Dec 13 17:46:08 2017 Udit KhandelwalSummaryGeneralSummary of Current Tasks40m
Lab CAD

1. 40m_bldg.dwg has 2D drawing
 top_view.pngisometic_view.png 
  407   Mon Mar 31 14:01:40 2008 jamieSummaryLSCSummary of DC readout PD non-linearity measurementsFrom March 21-26, I conducted some measurements
of the response non-linearity of some mock-up
DC readout photodetectors.  The detectors
 t21-r21_v_power.png 
  6422   Thu Mar 15 08:48:40 2012 RyanSummaryCDSSummary of Syracuse Visit to 40m Mar 5-9 2012JIMS Channels in PEM Model
The
PEM model has been modified now to include
the JIMS(Joint Information Management System)
  
  1783   Thu Jul 23 10:05:38 2009 AlbertoUpdatePSLSummary of the latest adventures with the alignment of the mode cleaner


  
  3738   Mon Oct 18 18:33:46 2010 KojiSummaryCOCSummary of the main mirrors & their phasemap measurementI have made a summary web page for the
40m upgrade optics.
https://nodus.ligo.caltech.edu:30889/40m_phasemap/
  
  6521   Wed Apr 11 17:56:26 2012 JenneUpdateGeneralSummary of things to figure out with the IFOQuestions:
Power recycling gain
   * It should be ~40,
  
  5127   Fri Aug 5 20:37:34 2011 jamieSummaryGeneralSummary of today's in-vacuum work[Jamie, Suresh, Jenne, Koji, Kiwamu]
After this morning's hiccup
with the east end crane, we decided to
  
  5130   Sat Aug 6 03:10:05 2011 SureshSummaryGeneralSummary of today's in-vacuum workThe table below gives the OSEM positions
as seen on the slow chanels C1:SUS-ETMX_{UL,UR,LL,LR,SD}PDMon
 ETMX_OSEMs.pngAfter_osem_adjustment.JPGBefore_osem_adj.JPG 
  5131   Sat Aug 6 13:38:02 2011 ranaSummaryGeneralSummary of today's in-vacuum workThis OSEM placement is just the OPPOSITE
of what the proper placement is.
Usually, we want to put them in so
  
  11431   Mon Jul 20 16:45:15 2015 Max IsiConfigurationGeneralSummary page c1sus.ini error correctedBad syntax errors in the c1sus.ini config
file were causing the summary pages to crash:
a plot type had not been indicated for plots
  
  12135   Wed May 25 14:21:29 2016 Max IsiUpdateGeneralSummary page configurationI have modified the c1summary.ini and c1lsc.ini
configuration files slightly to avoid overloading
the system and remove the errors that were
  
  15309   Wed Apr 22 13:52:05 2020 gautamUpdateDetCharSummary page revivalCovid 19 motivated me to revive the summary
pages. With Alex Urban's help, the infrastructure
was modernized, the wiki
  
  15696   Wed Dec 2 18:35:31 2020 gautamUpdateDetCharSummary page revivalThe summary pages were in a sad state of
disrepair - the daily jobs haven't been
running for > 1 month. I only noticed
  
  11375   Thu Jun 25 12:03:42 2015 Max IsiUpdateGeneralSummary page statusThe summary pages have been down due to
incompatibilities with a software update
and problems with the LDAS cluster. I'm
  
  11376   Thu Jun 25 14:18:46 2015 Max IsiUpdateGeneralSummary page statusThe pages are live again. Please allow
some time for the system to catch up and
process missed days. If there are any
  
  11411   Tue Jul 14 16:47:18 2015 EveUpdateSummary PagesSummary page updates continue during upgradeI've continued to make changes to the
summary pages on my own environment, which
I plan on implementing on the main summary
  
  11257   Sun Apr 26 20:10:10 2015 max isiHowToGeneralSummary pagesI have set up new summary pages for the
40m: http://www.ligo.caltech.edu/~misi/summary/
This website shows plots (time series,
  
  11261   Mon Apr 27 21:42:07 2015 ranaUpdateVACSummary pagesWe want to have a VAC page in the summaries,
so Steve
  
  11279   Mon May 11 12:17:19 2015 max isiHowToGeneralSummary pagesI have created a wiki page with introductory
info about the summary page configuration:
https://wiki-40m.ligo.caltech.edu/Daily summary
  
  15370   Wed Jun 3 11:20:19 2020 gautamUpdateDetCharSummary pagesSummary:

The 40m
summary pages have been revived. I've
  
  15812   Wed Feb 17 13:59:35 2021 gautamUpdateDetCharSummary pagesThe summary pages had failed because of
a conda env change. We are dependent on detchar's
  
  11382   Mon Jun 29 17:40:56 2015 Max IsiUpdateGeneralSummary pages "Code status" page fixedIt was brought to my attention that the
"Code status" page (https://nodus.ligo.caltech.edu:30889/detcharsummary/status.html)
had been stuck showing "Unknown status"
  
  11546   Sun Aug 30 13:55:09 2015 IgnacioUpdateIOOSummary pages MCFThe summary
pages show the effect of the MCL FF on MCF
(left Aug 26, right Aug 30):
 Aug26.pngAug30.png 
  12910   Mon Mar 27 20:29:05 2017 ranaSummaryDetCharSummary pages broken againGoing to the summary pages and looking
at 'Today' seems to break it and
crash the browser. Other tabs are OK, but
  
  11401   Fri Jul 10 17:57:38 2015 Max IsiUpdateGeneralSummary pages downThe summary pages are currently unstable
due to priority issues on the cluster*. The
plots had been empty ever since the CDS updated
  
  12432   Tue Aug 23 09:50:17 2016 Max IsiUpdateGeneralSummary pages down due to cluster maintenance Summary pages down today due to schedulted
LDAS cluster maintenance. The pages will
be back automatically once the servers are
  
  12440   Thu Aug 25 08:19:25 2016 Max IsiUpdateGeneralSummary pages down due to cluster maintenance The system is back from maintenance and
the pages for last couple of days will be
filled retroactively by the end of the week.
  
  11434   Tue Jul 21 21:33:22 2015 Max IsiUpdateGeneralSummary pages moved to 40m LDAS accountThe summary pages are now generated from
the new 40m
LDAS account. The nodus URL (https://nodus.ligo.caltech.edu:30889/detcharsummary/)
  
  12394   Wed Aug 10 17:30:26 2016 Max IsiUpdateGeneralSummary pages statusSummary pages are currently empty due to a
problem with the code responsible for locating
frame files in the cluster. This should be
  
  12399   Thu Aug 11 11:09:52 2016 Max IsiUpdateGeneralSummary pages statusThis problem has been fixed. 

> Summary pages are currently empty due to
  
ELOG V3.1.3-