40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 22 of 169  Not logged in ELOG logo
Entry  Fri Jul 20 22:51:28 2018, Koji, Update, IOO, IMC WFS path alignment 
Entry  Fri Jul 20 18:30:47 2018, Jon, Configuration, AUX, Recommend to install AUX PZT driver 
Entry  Thu Jul 19 18:09:17 2018, pooja, Update, Cameras, Update in developing neural networks nn_simulation_mlt_sine_nodes4_lr0p00001_beta1_0p8_beta2_0p85_marked.pdfnn_simulation_2_nodes4_target-1to1_marked.pdf
Entry  Wed Jul 18 03:14:48 2018, Annalisa, Update, General, Vent 80 recovery 
    Reply  Wed Jul 18 23:43:50 2018, Koji, Update, General, Vent 80 recovery IMG_5868.JPGIMG_5382.JPG
Entry  Tue Jul 17 17:37:46 2018, Annalisa, Terra, Configuration, Thermal Compensation, Heaters installation 6x
Entry  Tue Jul 17 12:46:28 2018, rana, Update, General, some notes from yesterday 
Entry  Tue Jul 17 01:07:40 2018, gautam, Update, SUS, ETMY EQ stops 
Entry  Mon Jul 16 18:12:00 2018, Koji, Update, VAC, Adding a manual gate valve between TP1 and V1/VM2 P_20180716_155413.jpgP_20180716_155645.jpgP_20180716_155738.jpgP_20180716_162307.jpgP_20180716_172000.jpg
Entry  Mon Jul 16 15:07:19 2018, Koji, Summary, VAC, Oven C vent P_20180716_141512.jpgP_20180716_141601.jpgP_20180716_141610.jpgP_20180716_141827.jpgP_20180716_143901.jpg
Entry  Fri Jul 13 23:39:46 2018, Annalisa, Configuration, Thermal Compensation, Thermal compensation setup - power supply IMG_2012.jpgIMG_2013.jpg20180713_213818.jpg
Entry  Fri Jul 13 23:23:49 2018, pooja, Update, Cameras, Update in developing neural networks nn_simulation_2_nodes4_lr0p00001_beta1_0p8_beta2_0p85.pdfnn_simulation_2_nodes8_lr0p00001_beta1_0p8_beta2_0p85.pdf
Entry  Fri Jul 13 20:36:33 2018, Koji, Summary, General, In vac/In air heater wiring  heater_wiring.pdf
Entry  Wed Oct 12 22:51:26 2016, Koji, Update, General, Clipping could not be improved by the PZTs - NEED ANOTHER VENT 
    Reply  Thu Oct 13 00:23:54 2016, ericq, Update, VAC, Pre-vent prep 
       Reply  Thu Oct 13 09:30:38 2016, Steve, Update, General, vent 79 is happening vent79precond.pngventing.png
          Reply  Thu Oct 13 16:48:34 2016, Steve, Update, VAC, vent 79 is completed vent_79.png
             Reply  Thu Oct 13 19:28:14 2016, gautam, Update, General, in-air alignment 
                Reply  Fri Oct 14 10:31:53 2016, gautam, Update, General, doors are off ITMY and BS/PRM chambers 
                   Reply  Fri Oct 14 18:33:55 2016, gautam, Update, General, AS clipping investigations 7x
                      Reply  Mon Oct 17 22:45:16 2016, gautam, Update, General, AS beam centered on all OMs 7x
                         Reply  Tue Oct 18 18:56:57 2016, gautam, Update, General, OM5 rotated to bypass OMC, green scatter is from window to PSL table OMCchamber.pdfgreenGhosts.JPGIMG_3322.JPGIMG_3326.JPG
                            Reply  Wed Oct 19 16:41:55 2016, gautam, Update, General, Heavy doors back on 8x
             Reply  Thu Oct 20 09:17:08 2016, Steve, Update, VAC, Pumpdown 80 has started readyPd80.pngbeforePd80.pngpd80at1h.png7d_atm.png
                Reply  Thu Oct 20 15:59:52 2016, Steve, Update, VAC, Pumpdown 80 has completed 7hPd80.png8hPd80.png9hPd80.png
                   Reply  Fri Oct 21 02:06:20 2016, gautam, Update, General, IFO recovery 
                      Reply  Mon Oct 24 11:39:13 2016, gautam, Update, General, ALS recovered ALSOutOfLoop20161024.pdfXendPDHOLTF20161024.pdf
                   Reply  Fri Oct 21 09:28:21 2016, Steve, Update, VAC, Vac Normal reached VacNormal.png
                      Reply  Wed Nov 23 11:32:13 2016, Steve, Update, VAC, TP3 drypump replaced again 
                         Reply  Fri Nov 10 08:52:21 2017, Steve, Update, VAC, TP3 drypump replaced 
                            Reply  Fri Feb 16 15:57:58 2018, Steve, Update, VAC, TP3 drypump replaced 
                Reply  Thu Jul 12 16:18:22 2018, Steve, Update, VAC, Vent preparations before_Vent.pngbefore_Vent_cond.png
                   Reply  Thu Jul 12 23:59:14 2018, gautam, Update, General, Vent objectives and prep 
                      Reply  Fri Jul 13 02:52:11 2018, gautam, Update, General, Vent objectives and prep preVentStatus.png
                         Reply  Fri Jul 13 17:13:45 2018, Koji, Update, General, Vent objectives and prep P_20180713_020603.jpg
                         Reply  Fri Jul 13 18:01:13 2018, gautam, Update, General, Low power MC 
Entry  Fri Jul 13 10:54:55 2018, aaron, Update, VAC, Vent 80 vent80wtiptilts.png
    Reply  Fri Jul 13 16:26:52 2018, Steve, Update, VAC, Vent 80 is completing... @atm.pngvent80_7h.pngventregN2&Air_c.jpg
Entry  Fri Jul 13 00:15:13 2018, Annalisa, Terra, Configuration, AUX, Y arm cavity scan  IMG_6492.JPGIMG_6494.JPG
Entry  Thu Jul 12 15:15:47 2018, Sandrine, Update, , Beat Note Measurements for Cavity Scans 
Entry  Thu Jul 12 14:06:39 2018, keerthana, Update, elog, Finesse and Analytical solution - Comparison finesse_cavity.pngAnalytical1.pdfFinesse_Analytical.pdfDifference.pdf
Entry  Thu Jul 12 11:13:39 2018, gautam, Update, General, OMC revival 
    Reply  Thu Jul 12 12:26:39 2018, aaron, Update, General, OMC revival 
Entry  Sun Jul 8 12:20:12 2018, Jon, Summary, AUX, Gouy Phase Measurements from AUX-Laser Scans yarm_aux_carrier_trans.pdfprmi_aux_carrier_trans.pdfdrmi_aux_carrier_trans.pdf
Entry  Wed Jul 11 16:50:34 2018, pooja, Update, Cameras, Update in developing neural networks graphs.pdf
Entry  Wed Jul 11 16:23:21 2018, aaron, Update, OMC, Coordination of the Output Mode-cleaner Mirror Insertion Expedition (COMMIE) 
Entry  Wed Jul 11 15:57:00 2018, aaron, Update, OMC, Reviving OMC electronics 
Entry  Tue Jul 10 23:44:23 2018, Annalisa, Configuration, Thermal Compensation, Heater setup assembly 8x
Entry  Tue Jul 10 16:59:12 2018, Izabella Pastrana, HowTo, Computer Scripts / Programs, Taking Remote TF Measurements with the Agilent 4395A 
Entry  Mon Jul 9 12:36:32 2018, pooja, Update, General, Projector light bulb blown out 
Entry  Sun Jul 8 22:27:25 2018, keerthana, Update, , AUX diagram PLL-single_demodulation.pdfPLL-double_demodulation.pdf
Entry  Sat Jul 7 19:50:38 2018, Annalisa, Configuration, Thermal Compensation, Study about the Thermal projection setup and its effect on the cavity 6x
Entry  Fri Jul 6 19:39:37 2018, Udit Khandelwal, Summary, General, CAD drawings of cantilever suspension required 
Entry  Fri Jul 6 12:12:09 2018, Annalisa, Configuration, Thermal Compensation, Thermal compensation setup IMG_1887.jpgIMG_1884.jpgIMG_1883.jpgIR20180706_0358_labels.png
Entry  Thu Jul 5 17:58:04 2018, keerthana, sandrine, Update, elog,  setup1.jpgsetup2.jpg
Entry  Thu Jul 5 17:33:36 2018, keerthana, sandrine, Update, elog, Lights not working 
Entry  Thu Jul 5 10:15:30 2018, gautam, Update, SUS, PRM watchdog tripped PRM_watchdogTrip.png
Entry  Wed Jul 4 20:48:32 2018, pooja, Update, Cameras, Medm screen for GigE sitemap.pngGigE_macros.pngCUST_CAMERA.png
Entry  Wed Jul 4 19:11:49 2018, Jon, Update, AUX, More Testing of AUX-Laser Mode Scanning yarm_trans_70uW.pdfprc_trans_9mW.pdfyarm_carrier_trans_70uW.tar.gzprc_carrier_trans_9mW.tar.gz
Entry  Tue Jul 3 11:59:10 2018, Jon, Update, AUX, AUX Carrier Scan of Y-Arm Cavity yarm_carrier_trans.pdfAG4395A_02-07-2018_185504.txt
Entry  Fri Jun 22 08:50:33 2018, Steve, Update, SUS, ITMY_UL sensor ITMY_UL.png
    Reply  Fri Jun 22 18:30:21 2018, gautam, Update, SUS, ITMY_UL sensor 
    Reply  Mon Jul 2 09:01:11 2018, Steve, Update, SUS, ITMY_UL sensor ITMY_ULcripingback.png
Entry  Fri Jun 29 18:16:32 2018, Jon, Configuration, PSL, Changes to AUX Optical Layout on PSL Table PSL_AUX_SETUP_CHANGE.pdf
Entry  Thu Jun 28 16:48:27 2018, gautam, Update, SUS, SOS cage towers  
Entry  Thu Jun 28 11:05:48 2018, shruti, Update, PEM, Seismometer temp control equipment 
Entry  Wed Jun 27 21:18:00 2018, gautam, Update, CDS, Lab maintenance scripts from NODUS---->MEGATRON 
    Reply  Thu Jun 28 08:09:51 2018, Steve, Update, CDS, vacuum pneumatic N2 pressure 320d_N2.png
       Reply  Thu Jun 28 10:28:27 2018, rana, Update, CDS, vacuum pneumatic N2 pressure 
Entry  Mon Dec 18 17:48:09 2017, rana, Update, Computers, rossa: SL7.3 upgrade continues 
    Reply  Tue Jun 26 22:06:33 2018, rana, Update, Computers, rossa: SL7.3 upgrade continues: DTT is back 
       Reply  Wed Jun 27 19:05:20 2018, rana, Update, Computers, rossa: SL7.3 upgrade continues: DTT is back 
Entry  Wed Jun 27 18:12:04 2018, gautam, Update, Electronics, Coil driver dewhitening DeWhiteningSketch.pdf
Entry  Tue Jun 26 20:59:36 2018, aaron, Update, OMC, prep for vent in a couple weeks 
Entry  Tue Jun 26 17:54:59 2018, pooja, Update, Cameras, Developing neural networks NN_noise_diag.zip
Entry  Tue Jun 26 17:20:33 2018, Jon, Configuration, Cameras, LLO Python Camera Software is Working 
Entry  Tue Jun 19 23:27:27 2018, gautam, Update, SUS, ETMX coil driver work in AM tomorrow 
    Reply  Thu Jun 21 00:14:01 2018, gautam, Update, SUS, ETMX coil driver out 
       Reply  Thu Jun 21 03:13:37 2018, gautam, Update, SUS, ETMX coil driver noise ETMXsticthced.pdfETMXFullSpan.pdfETMXCoilDriver.fil.zip
          Reply  Sun Jun 24 20:02:07 2018, gautam, Update, SUS, Some notes about coil driver noise CoilDriverSchematic.pdfD010001_2k_fastOnly_2.25k.pdfD010001_4k_fastOnly_4.5k.pdf
             Reply  Tue Jun 26 16:28:00 2018, gautam, Update, SUS, Coil driver protoboard characterization IMG_7060.JPGETMXstitchced.pdfETMXfullSpan.pdfPSRR.pdf
       Reply  Thu Jun 21 18:25:57 2018, gautam, Update, SUS, ETMX coil driver re-installed 
Entry  Tue Jun 26 10:50:14 2018, pooja, Update, Cameras, Beam spot tracking using OpenCV cv2_track_fig.pdf
Entry  Sat Jun 23 13:08:41 2018, Jon, Update, AUX, First Coherent AUX Scan of PRC Using AM Sidebands IMG_2695.jpegIMG_2698.jpegIMG_2699.jpeg
    Reply  Sat Jun 23 20:54:35 2018, Koji, Update, AUX, First Coherent AUX Scan of PRC Using AM Sidebands 
    Reply  Tue Jun 26 10:06:39 2018, keerthana, Update, AUX, First Coherent AUX Scan of PRC Using AM Sidebands TRANS.pdfREFL.pdf
Entry  Thu Jun 21 14:23:22 2018, Udit Khandelwal, Summary, General, A summary of the Tip-TIlt Mirror Holder design changes 1.png2.png3-1.png3-2.png3-3.png
    Reply  Thu Jun 21 14:57:59 2018, Koji, Summary, General, A summary of the Tip-TIlt Mirror Holder design changes 
       Reply  Mon Jun 25 19:14:02 2018, Udit, Summary, General, Re: A summary of the Tip-TIlt Mirror Holder design changes 4-1.png4-2.png
          Reply  Mon Jun 25 21:14:08 2018, Koji, Summary, General, Re: A summary of the Tip-TIlt Mirror Holder design changes 
Entry  Tue Jun 19 18:56:55 2018, Jon, Update, General, AUX beam alignment issues 
    Reply  Wed Jun 20 00:57:04 2018, johannes, Update, General, AUX beam alignment issues as110_rf_30MHz.pdfyend_rf_30MHz.pdf
       Reply  Sun Jun 24 23:13:46 2018, johannes, Update, General, AUX beam alignment issues AS_AUX_SETUP.pdf
ELOG V3.1.3-