Fri May 10 18:24:29 2019, gautam, Update, NoiseBudget, aligoNB
|
Fri May 10 13:00:25 2019, Chub, Update, General, crane inspection complete
|
Thu May 9 22:26:39 2019, Jon, Omnistructure, PSL, Second ADC added to PSL Acromag crate
|
Thu May 2 15:15:15 2019, Jon, Omnistructure, Computers, susaux machine renamed
|
Fri May 3 09:12:31 2019, gautam, Update, SUS, All vertex SUS watchdogs were tripped
|
Mon May 6 11:05:23 2019, Jon, Update, SUS, All vertex SUS watchdogs were tripped
|
Fri May 3 15:40:33 2019, gautam, Update, General, CVI 2" beamsplitters delivered
|
Thu May 2 15:35:54 2019, Jon, Omnistructure, Upgrade, c1susaux upgrade documentation
|
Thu May 2 10:59:58 2019, Jon, Update, SUS, c1susux in situ wiring testing completed  
|
Mon Apr 29 19:23:49 2019, Jon, Update, Computer Scripts / Programs, Scripted tests of suspension VMons using fast system
|
Thu May 2 10:41:50 2019, gautam, Update, SUS, SOS Magnet polarity
|
Tue Apr 30 17:27:35 2019, Anjali, Update, Frequency noise measurement, Frequency noise measurement of 1 micron source
|
Mon Apr 29 16:34:27 2019, gautam, Update, Electronics, ITMX/IMTY mis-labelling fixed at 1X4 and 1X5 
|
Thu Apr 11 17:30:45 2019, Jon, Update, SUS, Automated suspension testing with susPython
|
Mon Apr 15 18:13:23 2019, rana, Update, Computer Scripts / Programs, Automated suspension testing with susPython
|
Sun Apr 28 16:00:17 2019, gautam, Update, Computer Scripts / Programs, List of suspension test
|
Fri Apr 26 12:32:35 2019, Jon, Update, PSL, modbusPSL service shut down
|
Fri Apr 26 12:10:08 2019, Anjali, Update, Frequency noise measurement, Frequency noise measurement of 1 micron source 
|
Thu Apr 25 18:14:42 2019, Anjali, Update, PSL, Door broken
|
Sat Apr 6 02:07:40 2019, Anjali, Update, Frequency noise measurement, Frequency noise measurement of 1 micron source
|
Wed Apr 10 00:33:09 2019, Anjali, Update, Frequency noise measurement, Frequency noise measurement of 1 micron source  
|
Wed Apr 10 16:58:54 2019, rana, Update, IOO, fiber MZ for NPRO freq noise measurements
|
Wed Apr 10 22:59:22 2019, gautam, Update, IOO, Spooled fiber
|
Thu Apr 11 09:05:06 2019, Anjali, Update, IOO, Spooled fiber    
|
Fri Apr 12 01:22:27 2019, Anjali, Update, Frequency noise measurement, Frequency noise measurement of 1 micron source
|
Mon Apr 15 22:39:10 2019, gautam, Update, Frequency noise measurement, Alternate setup with PSL pickoff
|
Wed Apr 17 00:43:38 2019, gautam, Update, Frequency noise measurement, MZ interferometer ---> DAQ
|
Thu Apr 25 03:32:25 2019, Anjali, Update, Frequency noise measurement, MZ interferometer ---> DAQ   
|
Thu Apr 25 10:25:19 2019, gautam, Update, Frequency noise measurement, Homodyne v Heterodyne
|
Thu Apr 25 15:47:54 2019, Anjali, Update, Frequency noise measurement, Homodyne v Heterodyne
|
Thu Apr 25 10:32:39 2019, Jon, Update, VAC, Vac interlocks updated
|
Thu Apr 25 11:27:11 2019, gautam, Update, VAC, PSL shutter re-opened
|
Thu Apr 25 10:13:15 2019, Chub, Update, General, Air Handler Out of Commission
|
Thu Apr 18 22:35:23 2019, gautam, Update, SUS, ETMY actuator diagnosis
|
Fri Apr 19 11:36:23 2019, gautam, Update, SUS, No consistent solution for output matrix
|
Fri Apr 19 15:13:38 2019, rana, Update, SUS, No consistent solution for output matrix
|
Fri Apr 19 16:19:42 2019, gautam, Update, SUS, Actuation matrix still not orthogonal
|
Fri Apr 19 19:22:15 2019, rana, Update, SUS, Actuation matrix still not orthogonal
|
Mon Apr 22 22:43:15 2019, gautam, Update, SUS, ETMY sensor diagnosis
|
Thu Apr 25 00:30:45 2019, gautam, Update, SUS, ETMY BR mode   
|
Wed Apr 24 17:39:15 2019, Yehonathan, Summary, Loss Measurement, Basic analysis of loss measurement   
|
Tue Apr 23 18:48:25 2019, Jon, Update, SUS, c1susaux bench testing completed
|
Wed Apr 24 17:07:39 2019, gautam, Update, SUS, c1susaux in-situ testing [and future of IFOtest]   
|
Wed Apr 24 11:22:59 2019, awade, Bureaucracy, Equipment loan, Borrowed Zurich HF2LI Lock in Amplifer to QIL
|
Tue Apr 23 19:31:45 2019, Jon, Update, SUS, Watchdog channels separated from autoBurt.req
|
Mon Apr 22 21:33:17 2019, Jon, Update, SUS, Bench testing of c1susaux replacement
|
Fri Apr 19 12:06:31 2019, awade, Bureaucracy, Electronics, Borrowed Busby Box May 19th 2019
|
Fri Apr 19 09:42:18 2019, Koji, Bureaucracy, General, Item borrowing (40m->OMC)
|
Thu Apr 18 23:10:12 2019, gautam, Update, Loss Measurement, X arm misaligned
|
Tue Apr 2 18:40:01 2019, gautam, Update, VAC, Vac failure
|
Wed Apr 3 09:07:46 2019, gautam, Update, VAC, Vac failure
|
Wed Apr 3 10:42:36 2019, gautam, Update, VAC, TP2 forepump replaced
|
Wed Apr 3 16:17:17 2019, Jon, Update, VAC, TP2 forepump replaced
|
Wed Apr 3 18:35:54 2019, gautam, Update, VAC, PSL shutter re-opened
|
Fri Apr 5 01:10:18 2019, gautam, Update, VAC, TP3 forepump is also noisy
|
Tue Apr 16 22:06:51 2019, gautam, Update, VAC, Vac interlock tripped again 
|
Wed Apr 17 18:12:06 2019, gautam, Update, VAC, Vac interlock tripped again 
|
Mon Apr 15 22:55:34 2019, gautam, Frogs, Thermal Compensation, Lab thermostat adjusted
|
Mon Apr 15 10:20:44 2019, gautam, Update, Optical Levers, BS Oplev PIT was oscillating
|
Thu Apr 11 12:04:43 2019, Jon, Update, SUS, Starting some scripted SUS tests on ITMY
|
Thu Apr 11 12:57:48 2019, Jon, Update, SUS, Starting some scripted SUS tests on ITMY
|
Wed Apr 10 23:37:59 2019, gautam, Update, PSL, PSL fan is noisy
|
Thu Apr 11 11:42:10 2019, Koji, Update, PSL, PSL fan is noisy
|
Thu Apr 11 12:21:01 2019, not Koji, Update, PSL, PSL fan is noisy
|
Fri Apr 5 11:40:57 2019, Anjali, Update, Frequency noise measurement, Frequency noise measurement of 1 micron source   
|
Mon Apr 1 12:01:52 2019, Jon, Update, CDS,
|
Mon Apr 1 22:33:00 2019, gautam, Update, CDS, ITMY freed
|
Tue Apr 2 15:02:53 2019, Jon, Update, CDS, ITMY freed
|
Tue Apr 2 14:53:57 2019, gautam, Update, CDS, c1vac added to burt
|
Fri Mar 29 15:47:58 2019, gautam, Update, AUX, AUX laser fiber moved from AS table to PSL table
|
Sun Mar 31 18:39:45 2019, Anjali, Update, AUX, AUX laser fiber moved from AS table to PSL table  
|
Fri Mar 29 11:43:15 2019, Jon, Update, Upgrade, Found c1susaux database bug
|
Thu Mar 28 23:29:00 2019, Koji, Update, SUS, Suspension PD whitening and I/F boards modified for susaux replacement  
|
Tue Mar 26 18:35:06 2019, Jon, Update, Upgrade, Modbus IOC is running on c1susaux2
|
Mon Mar 25 10:21:05 2019, Jon, Update, Upgrade, c1susaux upgrade plan  
|
Tue Mar 26 04:25:13 2019, Johannes, Update, Upgrade, c1susaux upgrade plan
|
Wed Mar 20 19:26:25 2019, Jon, Update, VAC, Protection against AC power loss
|
Thu Mar 21 21:50:31 2019, rana, Update, VAC, Protection against AC power loss
|
Thu Dec 20 21:29:41 2018, Jon, Omnistructure, Upgrade, Vacuum Controls Switchover Completed
|
Fri Dec 21 11:13:13 2018, gautam, Omnistructure, VAC, N2 line valved off 
|
Fri Dec 21 12:57:10 2018, Koji, Omnistructure, VAC, N2 line valved off
|
Thu Jan 3 15:08:37 2019, gautam, Omnistructure, VAC, Vac status unknown  
|
Fri Jan 4 17:43:24 2019, gautam, Update, CDS, Timing issues
|
Wed Jan 9 11:33:35 2019, gautam, Update, CDS, Timing issues still persist 
|
Fri Jan 4 10:25:19 2019, Jon, Omnistructure, VAC, N2 line valved off
|
Thu Mar 21 18:36:59 2019, Jon, Omnistructure, Upgrade, Vacuum Controls Switchover Completed
|
Thu Mar 21 18:09:36 2019, Koji, Update, CDS, db file preparation for acromag c1susaux
|
Thu Mar 21 12:46:22 2019, Jon, Update, VAC, More vac controls upgrades
|
Thu Mar 21 17:22:52 2019, Jon, Update, VAC, More vac controls upgrades
|
Wed Mar 20 12:31:30 2019, Jon, Update, VAC, Doing vac controls work
|
Wed Mar 20 20:07:22 2019, Jon, Update, VAC, Doing vac controls work
|
Mon Mar 18 20:22:28 2019, gautam, Update, ALS, ALS stability test
|
Mon Mar 18 18:10:14 2019, Koji, Summary, General, Task items and priority
|
Sun Mar 17 21:06:17 2019, Anjali, Update, ALS, Amplifier characterisation   
|
Sun Mar 17 13:35:39 2019, Anjali, Update, ALS, Power splitter characterization   
|
Thu Mar 14 23:26:47 2019, Anjali, Update, ALS, ALS delay line electronics
|
Fri Mar 8 08:40:26 2019, Anjali, Configuration, , Frequency stabilization of 1 micron source
|
|