40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 205 of 346
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
17268 Entries
Goto page
Previous
1
,
2
,
3
...
204
, 205,
206
...
344
,
345
,
346
Next
Fri Jul 15 16:23:51 2016, ericq , Update, General, Gluing setbacks
Thu Aug 4 14:21:21 2016, ericq , Update, Computer Scripts / Programs, Web things mostly back online
Thu Aug 4 15:00:40 2016, ericq , Update, Computer Scripts / Programs, Web things mostly back online
Sun Aug 7 14:53:39 2016, ericq , Update, SUS, ETMX Standoff gluing was successful
Fri Sep 14 16:39:14 2012, ericq, jenne, Update, General, First In Vac Picture
Mon Aug 11 21:03:48 2014, ericq, rana, Summary, IOO, MC demod measurement
Fri Jan 23 14:25:03 2015, evan, Update, CDS, New netgpib scripts for SR785
Wed Jan 9 10:47:15 2008, fricke, Update, Computers, ethernet wiring in office/control room
Sat Jan 25 21:09:16 2014, gabriele, HowTo, LSC, Procedure to measure PRC length
Tue Apr 5 11:42:17 2016, gaericqutam, Update, endtable upgrade, TABLE REMOVAL
Wed Jun 5 20:45:19 2013, gautam, Update, General, ITMx Oplev Fixed
Fri Jun 7 17:12:46 2013, gautam, Update, General, Projector - lightbulb replaced
Thu Jun 20 20:46:16 2013, gautam, Update, IOO, WFS debugging-QPD debugging
Tue Jun 25 12:42:16 2013, gautam, Update, General, Serial-interface with Doubling Oven at Y end
Tue Jun 25 19:18:07 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation
Wed Jun 26 11:45:06 2013, gautam, Update, General, PID tuning-Doubling Oven at Y end
Wed Jun 26 19:02:38 2013, gautam, Update, General, ITMx Oplev (not quite?) Fixed
Thu Jun 27 18:11:53 2013, gautam, Update, General, ITMx Oplev-POX looks beam okay
Thu Jun 27 23:01:39 2013, gautam, Update, General, ITMx Oplev-servo gains adjusted
Fri Jun 28 13:10:28 2013, gautam, Update, General, ITMx Oplev-servo gains adjusted
Tue Jul 2 00:25:14 2013, gautam, Update, Green Locking, Universal PDH box tuning
Wed Jul 3 21:19:04 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation
Mon Jul 8 13:45:19 2013, gautam, Configuration, endtable upgrade, Driver board verification
Tue Jul 9 11:37:37 2013, gautam, Update, CDS, set up for testing DAC Interface-board pin outs
Tue Jul 9 12:01:20 2013, gautam, Update, CDS, set up for testing DAC Interface-board pin outs
Tue Jul 9 18:44:37 2013, gautam, Update, CDS, DAC Interface Board-Pin Outs
Wed Jul 10 01:27:44 2013, gautam, Update, Green Locking, Y-end Green PDH open-loop transfer function
Wed Jul 10 22:41:06 2013, gautam, Configuration, endtable upgrade, PZT Driver Board
Thu Jul 11 23:50:57 2013, gautam, Configuration, , PZT Driver Board-changes made
Mon Jul 15 11:51:18 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum
Mon Jul 15 15:54:20 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units
Mon Jul 15 17:59:31 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -6.4kHz bandwidth
Tue Jul 16 14:51:09 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-Modified notches
Thu Jul 18 19:09:08 2013, gautam, Configuration, endtable upgrade, QPD Calibration for PZT Calibration
Thu Jul 18 20:20:52 2013, gautam, Configuration, endtable upgrade, First mirror glued to PZT and mounted in modified mounts
Thu Jul 18 21:12:58 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-All channels modified
Thu Jul 18 23:34:40 2013, gautam, Configuration, endtable upgrade, Coarse adjustment of PZT axes orientation in mount
Fri Jul 19 22:51:40 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted
Fri Jul 19 23:35:31 2013, gautam, Configuration, endtable upgrade, Preliminary Calibration of PZT
Tue Jul 23 04:07:48 2013, gautam, Update, CDS, Excitation points set up on c1scx
Tue Jul 23 16:47:01 2013, gautam, Update, CDS, Excitation points set up on c1scx
Tue Jul 23 19:38:58 2013, gautam, Update, CDS, Characterisation of DAC at 1X9
Tue Jul 23 20:41:40 2013, gautam, Configuration, endtable upgrade, Full range calibration and installation of PZT-mounted mirrors
Mon Jul 29 13:39:25 2013, gautam, Configuration, endtable upgrade, PZT Driver Board-further changes
Mon Jul 29 21:57:45 2013, gautam, Configuration, endtable upgrade, Hardware installed at 1X9
Tue Jul 30 19:40:47 2013, gautam, Configuration, endtable upgrade, DAC-PZT Driver Board Output Signal Chain Tested
Tue Jul 30 19:44:05 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted
Thu Aug 1 12:12:35 2013, gautam, Update, CDS, New model for endtable PZTs
Thu Aug 1 13:09:17 2013, gautam, Update, CDS, New model for endtable PZTs-procedure
Thu Aug 1 15:28:44 2013, gautam, Update, CDS, New model for endtable PZTs-problem solved
Goto page
Previous
1
,
2
,
3
...
204
, 205,
206
...
344
,
345
,
346
Next
ELOG V3.1.3-