40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 205 of 346  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  12585   Thu Oct 27 23:29:47 2016 ericqUpdateGeneralPRFPMI locked, arms loss improvedAs Gautam mentioned, we had some success
locking the PRFPMI last
night. (SRM satellite box is still in surgery...)
 TRY_REFL_2d.pngAS.pngREFL.pngseis_sub.pdf 
  12591   Wed Nov 2 12:05:00 2016 ericqUpdateASCQuick WFS thoughtsI poked around a bit thinking about what
we need for a single AS WFS. 

New things that we would need:
  
  12597   Thu Nov 3 13:36:16 2016 ericqUpdateCDSc1pem revampedIt seems that the EX and EY BLRMS banks
were missing the BP and LP filters for the
0.03-0.1 and 0.1-0.3 bands. I've copied
  
  12608   Wed Nov 9 11:40:44 2016 ericqUpdateCDSsafe.snap BURT files now in svnThis is long overdue, but our burt files
for SDF now live in the LIGO userapps SVN,
as they should.
  
  12672   Wed Dec 7 11:52:48 2016 ericqUpdateIMCPartial IMC ringdownsThe transients are likely due to doppler
interference due to the input laser frequency
sloshing due to errant control signals after
 IMCpartial.pngIMCpartial.zip 
  12719   Sat Jan 14 12:36:57 2017 ericqUpdateDAQminute trends missingYes, writing minute trends causes hourly
FB crashes in the current state of things.
The "raw" minute trending is turned
  
  12732   Wed Jan 18 12:34:21 2017 ericqSummaryIOOMCL / MCF / Calibration



  
  12733   Wed Jan 18 12:46:47 2017 ericqUpdateComputer Scripts / Programsnodus web apache simlinks too soft


  
  12740   Thu Jan 19 16:36:35 2017 ericqUpdateComputer Scripts / Programsnodus web apache simlinks too soft


  
  12776   Tue Jan 31 15:08:13 2017 ericqMetaphysicsCDSMinute Trend KoanA novice was learning at the feet of Master
Daqd. At the end of the lesson he looked
through his notes and said, “Master,
  
  12779   Tue Jan 31 20:25:26 2017 ericqSummaryCDSMinute Trend Koan


  
  12796   Fri Feb 3 11:40:34 2017 ericqSummaryCDS/cvs/cds/caltech/chans back on svn1.6I was able to bring back svn 1.6 formatting
to /cvs/cds/caltech/chans by doing the following
on nodus:
  
  12830   Wed Feb 15 09:06:13 2017 ericqUpdateDAQpanels and pcbsThe amplifier unit should use the three
pin dsub connectors (3w3?) that we use on
many of the other units for DC power, and
  
  12962   Mon May 1 21:45:54 2017 ericqUpdateGeneralDRMI locking Comparing counts doesn't get you anywhere;
each PD has different whitening gain which
may vary from measurement to measurement.
  
  12974   Fri May 5 10:13:02 2017 ericqUpdateGeneralMICH NB questionsIs suspension thermal noise missing? I take
it "Thermal" refers just to thermal things
going on in the optic, since I don't see
  
  13227   Thu Aug 17 22:54:49 2017 ericqUpdateComputersTrying to access JetStor RAID filesThe JetStor RAID unit that we had been
using for frame writing before the fb meltdown
has some archived frames from DRFPMI locks
  
  13230   Sat Aug 19 01:35:08 2017 ericqUpdateALSX Arm ALS lockMy motivation tonight was to get an up-to-date
spectrum of a calibrated measurement
of the out-of-loop displacement of an arm
 ALS_comparison.pdf 
  13239   Tue Aug 22 15:17:19 2017 ericqUpdateComputersOld frames accessible againIt turns out the problem was just a bent
pin on the SCSI cable, likely from having
to stretch things a bit to reach optimus
  
  13263   Mon Aug 28 17:13:57 2017 ericqUpdateCDS40m files backup situationIn addition to bootable full disk backups,
it would be wise to make sure the important
service configuration files from each machine
  
  9572   Thu Jan 23 23:10:19 2014 ericq UpdateGeneralVent so far[ericq, Manasa, Jenne]
Summary: We opened up the
BS and both ITM chambers today, and put the
  
  9579   Mon Jan 27 21:36:35 2014 ericq UpdateGeneralVent so farAfter turning the slow FSS threshold down,
the mode cleaner stays locked enough to do
other things. We were able to align the tip
  
  9583   Tue Jan 28 22:24:46 2014 ericq UpdateGeneralFurther Alignment[Masasa, ericq]
Having no luck doing things remotely,
we went into the ITMX chamber and roughly
  
  12302   Thu Jul 14 22:29:57 2016 ericq UpdateGeneralETMX guide rod gluing / ETMY Magnet gluingThe pickle puckers came off ETMY cleanly  ETMY now rests   
  12305   Fri Jul 15 16:23:51 2016 ericq UpdateGeneralGluing setbacks[ericq, Lydia]

Here is a picture of the ETMX guide
rod post-gluing. There is unfortunately a
 IMG_2768.JPGIMG_2771.JPG 
  12372   Thu Aug 4 14:21:21 2016 ericq UpdateComputer Scripts / ProgramsWeb things mostly back onlineThe nodus restart caused a bit of downtime.
The apache configuration files were accidentally
deleted the other day, so elog/svn/wikis
  
  12373   Thu Aug 4 15:00:40 2016 ericq UpdateComputer Scripts / ProgramsWeb things mostly back onlineNodus' /export
and /etc
directories are now being backed up at
  
  12382   Sun Aug 7 14:53:39 2016 ericq UpdateSUSETMX Standoff gluing was successfulI came in to check on ETMX. I freed the
earthquake stops, and found that the OSEMS
were reasonably, but not perfectly, centered.
 ETMX_resonances.pdfETMX_SUSspectra.zip 
  7388   Fri Sep 14 16:39:14 2012 ericq, jenneUpdateGeneralFirst In Vac PictureAfter much fussing, we got a picture of
MMT1 with the beam.
Using the iris doesn't seem feasible.
 mmt1.jpg 
  10363   Mon Aug 11 21:03:48 2014 ericq, ranaSummaryIOOMC demod measurementWe measured
the TF of the MC Demod board today. 
  
  10935   Fri Jan 23 14:25:03 2015 evanUpdateCDSNew netgpib scripts for SR785Does netgpibdata/TFSR785
work at the 40m currently? I rsynced the
netgpibdata
 TFSR785.zip 
  228   Wed Jan 9 10:47:15 2008 frickeUpdateComputersethernet wiring in office/control roomThe electrical people have been here for three
days, installing ethernet cables and drops
in the 40m office area, in the old conduits
  
  9575   Sat Jan 25 21:09:16 2014 gabrieleHowToLSCProcedure to measure PRC lengthI know the drawing is wrong.
I put random distances, not realistic ones,
and I did not try to get something close
  
  12063   Tue Apr 5 11:42:17 2016 gaericqutamUpdateendtable upgradeTABLE REMOVALThere is currently no table at
the X end! 

We have moved the vast majority
  
  8684   Wed Jun 5 20:45:19 2013 gautamUpdateGeneralITMx Oplev Fixed

    

       
            
 ITMx_overview.JPGITMx_clipping_.JPG 
  8688   Fri Jun 7 17:12:46 2013 gautamUpdateGeneralProjector - lightbulb replaced

    

       
            
  
  8735   Thu Jun 20 20:46:16 2013 gautamUpdateIOOWFS debugging-QPD debugging 
 I wanted to make sure that
the QPD map on the C1IOO_MC_TRANS_QPD.adl
 MC2_QPD-map.png 
  8745   Tue Jun 25 12:42:16 2013 gautamUpdateGeneralSerial-interface with Doubling Oven at Y endSummary 
I have been working on setting up
a serial-link with the temperature controller
  
  8746   Tue Jun 25 19:18:07 2013 gautamConfigurationendtable upgradeplan of action for PZT installation  This entry is
meant to be a sort of inventory check and
  
  8755   Wed Jun 26 11:45:06 2013 gautamUpdateGeneralPID tuning-Doubling Oven at Y end 
Summary
Having established the serial link
 oven-loop.pdfTime_series.pngfit_attempt.png 
  8758   Wed Jun 26 19:02:38 2013 gautamUpdateGeneralITMx Oplev (not quite?) Fixed 
Summary:
Steve and I tried to fix the Oplev
 oplev_chamber.pdfphoto_1.JPGphoto_2.JPG 
  8770   Thu Jun 27 18:11:53 2013 gautamUpdateGeneralITMx Oplev-POX looks beam okay 
 Jenne just aligned the X arm
and I got a chance to check the status of
  
  8777   Thu Jun 27 23:01:39 2013 gautamUpdateGeneralITMx Oplev-servo gains adjusted 
 With rana's input, I changed
the ITMx oplev servo gains given the beam
 pitch-plot.pdfyaw-plot.pdf 
  8784   Fri Jun 28 13:10:28 2013 gautamUpdateGeneralITMx Oplev-servo gains adjusted 
 As mentioned in elog
8770, I wanted to give the POX beam a
 pitch-plot_copy.pdfyaw-plot_copy.pdf 
  8789   Tue Jul 2 00:25:14 2013 gautamUpdateGreen LockingUniversal PDH box tuning [Koji, Annalisa, Gautam]
Annalisa noticed that over the weekend
the Y-arm green PDH was locked to a sideband,
 circuit.pdfmodel.pdf 
  8800   Wed Jul 3 21:19:04 2013 gautamConfigurationendtable upgradeplan of action for PZT installation This is an update on the situation
as far as PZT installation is concerned.
I measured the required cable (PZT driver
 DAC_bank.pngASC_schematic.pdf 
  8804   Mon Jul 8 13:45:19 2013 gautamConfigurationendtable upgradeDriver board verificationWith the help of an expansion card,  I
verified that the + 15V and + 24V
from the eurocrate in the slot I've identified
  
  8809   Tue Jul 9 11:37:37 2013 gautamUpdateCDSset up for testing DAC Interface-board pin outsThe bank marked channel 9-16 is free, but
the connector is a 40 pin IDC and I need
to know the exact pin-out configuration before
  
  8811   Tue Jul 9 12:01:20 2013 gautamUpdateCDSset up for testing DAC Interface-board pin outs 
 Jenne just rebooted c1scy and
daqd on the framebuilder. We will do the
  
  8814   Tue Jul 9 18:44:37 2013 gautamUpdateCDSDAC Interface Board-Pin Outs  Summary:
The pin-outs for the DAC interface
board have been determined.
 DAC_Interface_Board_Pin-out.pdfbreak-out_ribbon.JPG 
  8817   Wed Jul 10 01:27:44 2013 gautamUpdateGreen LockingY-end Green PDH open-loop transfer function [Annalisa, gautam]
Summary:
We have measured the open-loop transfer
 Green_PDH_measurement.pdfY-end_Green_PDH.pdf 
ELOG V3.1.3-