40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 204 of 341  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  8761   Thu Jun 27 02:44:33 2013 ranaUpdateGreen Lockingc1als model edited Could be that this is OK, but it
doesn't yet make sense to me. Can you please
explain in words how this manages to apply
  
  8762   Thu Jun 27 05:44:51 2013 ranaUpdate 40MARS wireless network problems

    

       
            
  
  8763   Thu Jun 27 10:45:41 2013 SteveUpdateGeneral40MARS wireless network problems

    

       
            
  
  8764   Thu Jun 27 15:50:03 2013 JenneUpdatePEMBLRMS are going crazyThe BLRMS are totally crazy today! 
I'm not sure what the story is, since it's
been this way all day (so it's not an earthquake,
 WeirdBLRMSincrease_27June2013_rawSeis.pngWeirdBLRMSincrease_27June2013_lowFreqBLRMS.pngWeirdBLRMSincrease_27June2013_Gur1xBLRMS.png 
  8765   Thu Jun 27 15:58:27 2013 SteveUpdatePEMPSL enclosure particle counts 
 Particle counts were measured
inside the PSL enclosure at 40VAC variac
  
  8766   Thu Jun 27 17:04:49 2013 JenneUpdatesafetyNitrogen bottle too hot - overpressuredAll of us in the control room / desk area
heard a sudden whoosh of air a few minutes
ago.  It kind of sounded like a pressure
  
  8767   Thu Jun 27 17:09:41 2013 JenneUpdateLSCPRCL locking again - POP PIT workLast night before dinner, I copied over
the ASC yaw servo filters to the ASC pitch
filter bank.  Using ASC gain of +0.001,
 MeasuredVsModeledASCyaw.png 
  8768   Thu Jun 27 17:41:08 2013 AnnalisaUpdateGreen LockingETMY -beat note found! 
 Y
 beat_note.JPG 
  8769   Thu Jun 27 17:49:17 2013 manasaUpdateGreen Lockingc1als model edited

    

       
            
 ALS_PHASEcalib.pngBEATX_FINE.png 
  8770   Thu Jun 27 18:11:53 2013 gautamUpdateGeneralITMx Oplev-POX looks beam okay 
 Jenne just aligned the X arm
and I got a chance to check the status of
  
  8771   Thu Jun 27 18:24:25 2013 CharlesUpdateISSCTN Servo Prototype Characterization - Done CorrectlyAs I showed in [elog
8759], measuring the transfer function
of my prototype servo was difficult due to
 TF-CTNServo_v2_Prototype-Individual_Stages.pngTF-CTNServo_v2_Prototype-Calc_vs_Meas.pngTF-CTNServo_v2_Prototype-Individual_Stages.figTF-CTNServo_v2_Prototype-Calc_vs_Meas.fig 
  8772   Thu Jun 27 19:17:03 2013 manasaUpdateLSCXarm ALS out-of-loop noiseMeasured
frequency noise is ~10Hz/rtHz @100Hz. 
 ALS_OoL.pdfALS_OoL1.pdf 
  8773   Thu Jun 27 21:45:48 2013 ranaUpdatePEMBLRMS are going crazyIts an increase in the microseismic peak.
Don't know what its due to though.
 useism.pdf 
  8774   Thu Jun 27 21:59:42 2013 ranaUpdateComputer Scripts / ProgramsMatlab upgradedI moved the old matlab directory from /cvs/cds/caltech/apps/linux64/matlab_o   
  8775   Thu Jun 27 22:05:25 2013 ranaUpdateGeneralPianosa fixedThe keyboard on Pianosa workstation has
been flaky for the last several days at least.
Today, it was having troubles mounting the
  
  8777   Thu Jun 27 23:01:39 2013 gautamUpdateGeneralITMx Oplev-servo gains adjusted 
 With rana's input, I changed
the ITMx oplev servo gains given the beam
 pitch-plot.pdfyaw-plot.pdf 
  8778   Thu Jun 27 23:18:46 2013 jamieUpdateComputer Scripts / ProgramsWARNING: Matlab upgraded

    

       
            
  
  8779   Fri Jun 28 02:12:21 2013 manasaUpdateLSCPRMI + X arm ALS X arm stabilized
using ALS while PRMI stayed locked
 PRMI_XALS_Jun28.png 
  8780   Fri Jun 28 02:12:41 2013 JenneUpdateLSCPRCL locking again - ASC workRana had the epiphany that I didn't have
any antiwhitening for my POP QPD.  Ooops. 
We looked at the schematic for the
 PRMI_ASC_powerSpectra_27June2013.pdfScreenshot-Untitled_Window.png 
  8781   Fri Jun 28 02:23:00 2013 JenneUpdateLSCNeed to measure sensing matrix at REFL165[Lisa, Rana, Jenne]
Lisa asked to see a model of the
PRMI sensing matrix with REFL165 included,
 SensMatModel_28June2013_InclREFL165.png 
  8782   Fri Jun 28 11:33:32 2013 SteveUpdate 40MARS wireless network problem

    

       
            
  
  8783   Fri Jun 28 12:15:09 2013 KojiUpdateLSCNeed to measure sensing matrix at REFL165There is no sensible REFL165 PD in the
lab. I am supposed to prepare a new version
of REFL165 using prototype BBPD.
  
  8784   Fri Jun 28 13:10:28 2013 gautamUpdateGeneralITMx Oplev-servo gains adjusted 
 As mentioned in elog
8770, I wanted to give the POX beam a
 pitch-plot_copy.pdfyaw-plot_copy.pdf 
  8785   Fri Jun 28 14:57:15 2013 SteveUpdateGeneralclosing lab doorsI found the south end emergency doors not
latched completely. There was a ~ 3/8"
vertical gap from top to bottom.
  
  8786   Fri Jun 28 16:19:06 2013 CharlesUpdateISS40m Noise Budget - Seismic Contribution I'm working on developing a full
noise budget for the 40m. To that end, I'll
use measurements from the GUR1 seismometer
 seismic_noise_6-28-13_raw.pngseismic_noise_6-28-13_raw.figseismic_noise_6-28-13_meters.pngseismic_noise_6-28-13_meters.fig 
  8787   Fri Jun 28 17:33:33 2013 John ZweizigUpdateSUSNDS2 Status


   
        
            
  
  8788   Mon Jul 1 23:27:07 2013 JenneUpdateLSCSensing Matrix vs. Xarm sweepI have modeled the PRMI sensing matrix
as I bring the Xarm into resonance. 
In optickle, I have the PRMI on sideband
  
  8789   Tue Jul 2 00:25:14 2013 gautamUpdateGreen LockingUniversal PDH box tuning [Koji, Annalisa, Gautam]
Annalisa noticed that over the weekend
the Y-arm green PDH was locked to a sideband,
 circuit.pdfmodel.pdf 
  8790   Tue Jul 2 02:29:47 2013 JenneUpdateLSCSensing Matrix vs. Xarm sweepHere is the Sensing Matrix movie (sorry
for the iffy quality - my movies usually
come out better than this):
  
  8791   Tue Jul 2 12:59:46 2013 CharlesUpdateISSGeneral Design for ISS Applicable to Multiple Applications While attempting to develop a somewhat
accurate noise budget for the 40m, I reasoned
that while the shape of the transfer function
 6x 
  8792   Wed Jul 3 01:49:46 2013 AnnalisaUpdateGreen LockingALS servo configuration[Koji, Annalisa, Manasa]
Today we worked on the ALS servo
stabilization for the Y arm.
 ALSALS_calibrated 
  8793   Wed Jul 3 03:06:29 2013 AnnalisaUpdateGreen LockingALS servo configuration 
I realized that I cannot open the
attached plots. I'll fix them tomorrow.
  
  8794   Wed Jul 3 10:39:25 2013 manasaUpdateIOOMC aligned and WFS enabledI found WFS had been left disabled from
sometime yesterday. I don't see anyone mentioning 
when and why they had turned OFF the WFS
  
  8799   Wed Jul 3 20:51:43 2013 CharlesUpdateISSProposed ISS for CTN Experiment - Altium Schematic After familiarizing myself with Altium,
I drew up the attached schematic for the
ISS to be used in the CTN experiment. The
 CTNServo_v2_abbott-switch.pdf 
  8801   Thu Jul 4 01:09:33 2013 Annalisa, KojiUpdateLSCPRMI locked with REFL165Summary:
-
The new REFL165 PD was installed on the AP
 130703_PRMI.pdfScreenshot.png 
  8802   Thu Jul 4 17:14:53 2013 ranaUpdateSUSNew SUS screen Now that the 3f locking looks so
cool for the PRMI, I suppose that the PRMI
+ arm stuff will be very successful.
 OM1.png 
  8803   Thu Jul 4 19:37:37 2013 KojiUpdateSUSNew SUS screenTotally agree. The old suspension screen
should be driven away.
  
  8805   Mon Jul 8 15:31:48 2013 JenneUpdateASCPOP QPD calibration prepI am prepping to do the POP QPD calibration,
and so have turned off the POP QPD, and put
it onto a micrometer stage.  My plan
  
  8806   Mon Jul 8 16:27:49 2013 AlexUpdate Planned rack additionsAlex and Eric
For the photodetector frequency response
automation project, we plan to add modules
 Annotated_Rack_1y1.pdf 
  8807   Mon Jul 8 21:46:31 2013 manasaUpdateGreen LockingBeatbox[Koji, Manasa]
I wanted to investigate on the ALS
electronics(in particular the beatbox and
  
  8808   Tue Jul 9 01:18:48 2013 Nic, KojiUpdateASCPRMI locking / PRM ASC adjustment[Koji, Nic]
- Locked PRMI with REFL165 I/Q
- Aligned the POP beam on the QPD.
 PRMI_ASC.pdf 
  8809   Tue Jul 9 11:37:37 2013 gautamUpdateCDSset up for testing DAC Interface-board pin outsThe bank marked channel 9-16 is free, but
the connector is a 40 pin IDC and I need
to know the exact pin-out configuration before
  
  8810   Tue Jul 9 11:41:22 2013 JenneUpdateASCPOP QPD calibration attemptI was bad, and forgot to elog the most
important part of my work yesterday - that
I had rotated the POP QPD by 90 degrees,
  
  8811   Tue Jul 9 12:01:20 2013 gautamUpdateCDSset up for testing DAC Interface-board pin outs 
 Jenne just rebooted c1scy and
daqd on the framebuilder. We will do the
  
  8812   Tue Jul 9 16:08:32 2013 JenneUpdateASCPOP QPD calibration attempt[Jenne, Alex] 
Calibration data for the POP QPD
has been taken, with the PRMI locked on sideband
  
  8813   Tue Jul 9 17:03:06 2013 SteveUpdateGreen Lockingfiber layed for Y armAlex, Gautam and Steve,
Single
mode fiber 50m long is layed out into
 fromETMYtowardPSL.jpgfibreETMYtoPSL50m.jpgPSLfiberfromETMY.jpg 
  8814   Tue Jul 9 18:44:37 2013 gautamUpdateCDSDAC Interface Board-Pin Outs  Summary:
The pin-outs for the DAC interface
board have been determined.
 DAC_Interface_Board_Pin-out.pdfbreak-out_ribbon.JPG 
  8815   Tue Jul 9 20:09:53 2013 KojiUpdateIOOWFS debuggingThe low UGFs of the MC WFS servos made
the MC insane thesedays: 
The servos are too slow and we kept
  
  8817   Wed Jul 10 01:27:44 2013 gautamUpdateGreen LockingY-end Green PDH open-loop transfer function [Annalisa, gautam]
Summary:
We have measured the open-loop transfer
 Green_PDH_measurement.pdfY-end_Green_PDH.pdf 
  8818   Wed Jul 10 02:10:41 2013 manasaUpdateGreen LockingBeatbox gets a makeover

    

       
            
 IMG_0842.JPGIMG_0844.JPGIMG_0845.JPGIMG_0846.JPG 
ELOG V3.1.3-