    Reply  Thu Sep 22 04:49:14 2011, Anamaria, Update, LSC, Locking status update - Some Scripts, No Louck 
Entry  Thu Sep 22 11:49:05 2011, kiwamu, Update, LSC, some LSC scripts don't run on pianosa 
    Reply  Thu Sep 22 11:50:37 2011, Koji, Update, LSC, Locking status update 
Entry  Thu Sep 22 15:53:37 2011, Mirko, Update, LSC, RF modulation depth measurement again DSC_3478.JPGDSC_3481.JPGDSC_3480.JPG
    Reply  Thu Sep 22 18:33:01 2011, Koji, Summary, LSC, The LSC screen modification PD_screen.png
Entry  Thu Sep 22 22:55:01 2011, Anamaria, Update, LSC, POX channel = POY PD connected + Bad Rack  RFPDpowerRack2.pdf
    Reply  Thu Sep 22 23:18:51 2011, Koji, Summary, LSC, The LSC screen modification C1LSC_RFPD.png
Entry  Fri Sep 23 16:56:07 2011, Mirko, Update, LSC, Desired MC modulation frequency measurement, tuning of modulation frequency 
Entry  Sat Sep 24 17:12:54 2011, Koji, Update, LSC, Realignment of REFL / Some 3f PRMI locking / Recycling Gain 
    Reply  Sat Sep 24 20:14:36 2011, Koji, Update, LSC, Rough estimation of the PR gain 
    Reply  Mon Sep 26 15:15:45 2011, Anamaria, Update, LSC, Realignment of REFL / Some 3f PRMI locking / Recycling Gain 
Entry  Tue Sep 27 04:13:22 2011, kiwamu, Update, LSC, tonight's locking activity PRMI.png
Entry  Fri Sep 30 05:35:42 2011, kiwamu, Update, LSC, length fluctuations in MICH and PRCL noise.png
Entry  Fri Sep 30 06:25:20 2011, kiwamu, Update, LSC, Calbiration of BS, ITMs and PRM actuators actuators.png
    Reply  Fri Sep 30 08:40:02 2011, Koji, Update, LSC, length fluctuations in MICH and PRCL 
Entry  Sun Oct 2 02:33:32 2011, kiwamu, Update, LSC, something funny with AS55 outofloop.png
Entry  Mon Oct 3 04:43:03 2011, kiwamu, Update, LSC, sideband-resonance PRMI locked ITMYtable.png
    Reply  Thu Oct 6 05:18:20 2011, kiwamu, Update, LSC, Noise in AS55 was from clipping : fixed  outofloop.png
Entry  Thu Oct 6 15:40:57 2011, Jenne, Update, LSC, Arm absl length data taken 
Entry  Fri Oct 7 04:42:24 2011, kiwamu, Update, LSC, DRMI locked and some plans 
Entry  Fri Oct 7 11:45:24 2011, Koji, Summary, LSC, POY11 installed, 55MHz PD at POY removed 
    Reply  Fri Oct 7 11:53:47 2011, Koji, Update, LSC, DRMI locked and some plans 
    Reply  Sat Oct 8 00:44:42 2011, kiwamu, Update, LSC, calibration of SRM actuator actuators.png
    Reply  Sat Oct 8 04:41:07 2011, kiwamu, Update, LSC, length fluctuations in SRCL length_noise.png
Entry  Sun Oct 9 17:13:46 2011, kiwamu, Update, LSC, First attempt to estimate mode matching efficiency using interferometer mm_reflection.png
    Reply  Mon Oct 10 00:01:26 2011, Koji, Update, LSC, First attempt to estimate mode matching efficiency using interferometer 
    Reply  Mon Oct 10 10:14:43 2011, rana, Update, LSC, length fluctuations in SRCL 
    Reply  Mon Oct 10 13:52:04 2011, kiwamu, Update, LSC, RE: First attempt to estimate mode matching efficiency using interferometer 
Entry  Tue Oct 11 03:35:16 2011, kiwamu, Update, LSC, BS actuator reponse at low frequency : measured BSactuator.png
    Reply  Tue Oct 11 15:14:50 2011, rana, Update, LSC, BS actuator reponse at low frequency : measured 
    Reply  Tue Oct 11 19:11:25 2011, kiwamu, Update, LSC, Re: BS actuator reponse at low frequency : measured 
    Reply  Tue Oct 11 21:23:51 2011, Jenne, Update, LSC, Arm absl lengths 
Entry  Wed Oct 12 00:35:42 2011, kiwamu, Update, LSC, TRY path realigned 
    Reply  Wed Oct 12 17:53:01 2011, kiwamu, Update, LSC, BS actuator response : fitting done and histroy of delays bode_BSactuator.png
Entry  Thu Oct 13 03:22:53 2011, kiwamu, Update, LSC, measurement of sensing matrix : just began 
Entry  Thu Oct 13 23:58:38 2011, Koji, Update, LSC, fixing REFL165  PA131612.jpgPA131618.jpg
    Reply  Fri Oct 14 04:35:45 2011, kiwamu, Update, LSC, locking tonight Screen_shot_2011-10-14_at_4.24.01.png
    Reply  Sat Oct 15 16:42:08 2011, Koji, Update, LSC, Testing REFL165  REFL165_test_111014_KA.pdfREFL165_transimpedance2.pdf
    Reply  Sat Oct 15 17:06:20 2011, Koji, Update, LSC, Installation REFL165  
Entry  Mon Oct 17 11:40:44 2011, Koji, Update, LSC, REFL165 removed from the table 
    Reply  Mon Oct 17 22:20:42 2011, Koji, Update, LSC, REFL165 removed from the table 
Entry  Tue Oct 18 04:04:27 2011, kiwamu, Update, LSC, measurement of sensing matrix : touchy SRM 
    Reply  Tue Oct 18 10:04:41 2011, Koji, Update, LSC, REFL165 removed from the table REFL165_original.pdfREFL165_new.pdfREFL165_schematic_111017_KA.pdf
Entry  Wed Oct 19 17:21:16 2011, Koji, Summary, LSC, Modification on the RFPD interface cards D990543-B_mod.pdf
Entry  Thu Oct 20 04:47:37 2011, kiwamu, Update, LSC, clipping search round 1 
Entry  Wed Oct 26 20:30:47 2011, Katrin, Update, LSC, POX11 and POP55 installed 
Entry  Wed Oct 26 23:03:03 2011, kiwamu, Update, LSC, RF distribution box : two more 55MHz available 
    Reply  Thu Oct 27 16:09:37 2011, kiwamu, Update, LSC, RF distribution box : two more 55MHz available RF_Distribution_Box.png
    Reply  Thu Oct 27 18:00:38 2011, kiwamu, Summary, LSC, Offsets in LSC signals due to the RFAMs : Optickle simulation ratio.pngupper.pngPRCL_200.pngMICH_200.pngSRCL_200.png
    Reply  Fri Oct 28 03:42:50 2011, kiwamu, Update, LSC, ITMX table needs to be refined ITMXtable.png