40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 198 of 357  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  8098   Mon Feb 18 11:54:15 2013 Max HortonUpdateSummary PagesTiming Issues and CalendarsCrontab: The bug of data only plotting
until 5PM is being investigated.  The
crontab's final call to the summary page
  
  8100   Mon Feb 18 21:43:05 2013 KojiUpdateAlignmentPOP path set up but AS55 is brokenI undertook the investigation of the AS55
PD.
I found the PD is not broken.
 AS55.pdf 
  8101   Mon Feb 18 23:41:15 2013 SendhilUpdateAlignmentAligned IPPOS, IPANG and OPLEVS[Yuta, Sendhil]
We aligned IPPOS, IPANG and all OPLEVs
(except for ETMX and SRM).
 IPANGIPPOSoplevs.png 
  8102   Tue Feb 19 00:21:09 2013 yutaUpdateElectronicsPOP path set up but AS55 is brokenHmm......  
I thought AS55 is broken because it
was not responding to the AS beam nor flashlight
  
  8104   Tue Feb 19 05:42:28 2013 KojiUpdateElectronicsPOP path set up but AS55 is broken10010 Ohm for POP55 vs 50 Ohm for AS55
(cf. http://nodus.ligo.caltech.edu:8080/40m/4763)
I
  
  8105   Tue Feb 19 08:06:02 2013 yutaUpdateElectronicsPOP path set up but AS55 is brokenI didn't use LED flash light. We learned
from the past (elog
#7355). I checked that POP55 and REFL55/165/33/11
  
  8106   Tue Feb 19 08:42:31 2013 KojiUpdateVACETMX door open[Steve, Yuta, Koji]
The ETMX heavy door was removed.
  
  8107   Tue Feb 19 09:37:23 2013 SteveUpdateIOOlow MC1 OSEM voltage 
    See TT DB25 pin swapping  
elog#7869 
 MC1_MC3.pngMC1_MC3_.png 
  8108   Tue Feb 19 12:02:00 2013 JamieUpdateIOOIMC table levelling.In order to address the issue of low MC1
OSEM voltages, Yuta and I looked at the IMC
table levelling.  Looking with the bubble
 Screenshot-Untitled_Window.png 
  8109   Tue Feb 19 15:10:02 2013 JamieUpdateCDSc1iscex alive againc1iscex is back up.  It is communicating
with it's IO chassis, and all of it's models
(c1x01, c1scx, c1spx) are running again.
  
  8110   Tue Feb 19 15:40:34 2013 CharlesUpdateISSISS PrototypeAfter spending a good deal of time learning
how to use the SR785, I was able to characterize
my prototype circuit. The transfer function
 Prototype_Transfer_Function.pngTheoretical_Transfer_Function.png 
  8111   Tue Feb 19 17:14:56 2013 ChloeUpdate QPD CircuitI finished working out the circuit and
figured out where the broken connections
were. This is diagrammed in my notebook (will
  
  8112   Tue Feb 19 19:55:52 2013 yutaUpdateIOOMC yaw input tuned[Jenne, Manasa, Yuta]

Since we levelled IMC stack, we had
 MCdecenter_19Feb2013.png 
  8113   Wed Feb 20 01:40:37 2013 ManasaUpdateAlignmentFinal IFO alignment- in progress[Yuta, Sendhil, Jamie, Jenne, Rana]

1. After the MC centering, we tried
  
  8114   Wed Feb 20 03:13:10 2013 yutaUpdateAlignmentclipping centering checklistI attached clipping/centering checklist
for the alignment.
Blue
 ClippingCenteringChecklist.pdf 
  8115   Wed Feb 20 10:13:41 2013 yutaUpdateAlignmentPRC flashing brighter than last weekAfter in-vac alignment work last night,
PRC is flashing brighter than PRMI alignment
last week.
  
  8116   Wed Feb 20 18:35:42 2013 JenneUpdateAlignmentNew in-vac alignment procedureI have updated the vacuum checklist for
in vacuum alignment.  Please take a
look (https://wiki-40m.ligo.caltech.edu/vent/checklist)
  
  8117   Wed Feb 20 18:53:48 2013 JenneUpdateAlignmentIFO ready for doors, then pumping[Yuta, Manasa, Sendhil, Jenne, Steve, Jamie,
Koji, Evan]
  
  8118   Wed Feb 20 19:20:50 2013 EvanUpdateAlignmentAS camera alignment[Manasa, Evan]
Manasa and I are trying to get the
AS beam onto the AS camera with a focusing
  
  8119   Wed Feb 20 19:48:16 2013 yutaUpdateAlignmentBS table oplev re-arranged[Sendhil, Yuta]

After aligning IFO and putting the
 IFOALIGN_QPDs_OSEMs.png 
  8120   Wed Feb 20 19:58:59 2013 ranaUpdateAlignmentBS table oplev re-arrangedPlease confirm the SRM OL beam is not too
bad and also find where the mis-aligned SRM
puts its beam. WE want to be sure that there
  
  8121   Wed Feb 20 20:15:29 2013 yutaUpdateAlignmentSRM oplev statusCurrently, SRM is misaligned in pitch so
that SRM reflected beam hits on the top edge
of SR3 (not on the mirror, but on the cage
  
  8122   Wed Feb 20 20:58:37 2013 yutaUpdateAlignmentclipping centering checklistBlue
ones are the ones we checked yesterday.
Green
 ClippingCenteringChecklist.pdf 
  8123   Wed Feb 20 21:12:37 2013 ranaUpdateAlignmentclipping centering checklist 
 Is the beam going towards the
OMC going to cause backscatter because of
  
  8124   Wed Feb 20 21:56:08 2013 yutaUpdateAlignmentclipping centering checklistI'm not sure about the OMC situation at
40m. I think there are no direct beam reflected
back into IFO from OMC path. There must be
  
  8126   Thu Feb 21 12:56:38 2013 JenneUpdateCDSc1iscex dead againc1iscex is dead again.  Red lights,
no "breathing" on the FE status
screen.
  
  8127   Thu Feb 21 13:34:35 2013 JenneUpdateTreasureIR card removed

    

       
            
  
  8128   Thu Feb 21 14:32:02 2013 JamieUpdateCDSc1iscex models restarted

    

       
            
  
  8129   Thu Feb 21 15:21:07 2013 yutaUpdateVACall heavy doors on, started pumping down annulus[Steve, Manasa, Jenne, Sendhil, Evan,
Yuta]
  
  8130   Thu Feb 21 16:53:37 2013 ManasaUpdatePSLPSL shutter[Steve, Jenne, Yuta, Manasa]
We have kept the laser ON at low
power through the pump down process. As we
  
  8131   Thu Feb 21 18:01:27 2013 SteveUpdateVACpumpdown at 230 Torr 
 We are pumping down with RP1
& RP3 oily roughing pumps at 3 Torr/min
  
  8132   Thu Feb 21 18:10:13 2013 ranaUpdateSEIPump Down misalignmentsThis plot shows the trend of the OL during
the past several hours of roughing pumping.
The big steps at the start of the
 OL.png 
  8133   Thu Feb 21 19:55:02 2013 ManasaUpdateLockingGreen locking in arms[Yuta, Manasa]

We have
 ETMYF_1045540570.png 
  8134   Thu Feb 21 21:12:42 2013 KojiUpdateVACpumpdown at 230 Torr[Rana, Yuta, Koji]
21:05 at the pressure of 10torr
V3 closed. RV1 manually closed. RPs
  
  8135   Fri Feb 22 08:01:25 2013 SteveUpdateVACpumpdown continuous 
 Pump
down is restarted after 10.5 hrs stop overnight.
 16hrs_pd75.png 
  8136   Fri Feb 22 11:12:16 2013 SteveUpdateVACpumpdown completed IFO   P1 pressure is 1
mTorr.  It is ready for high power light.
The Maglev took over the pumping
 mag60min.pngpd75at20h.png 
  8137   Fri Feb 22 13:03:49 2013 ManasaUpdate MC REFL PD murder 
[Yuta, Manasa]
We turned IFO power back to 1.25W
 dead.jpg 
  8138   Fri Feb 22 17:33:25 2013 ManasaUpdateElectronicsMC REFL PD back from the dead 
 [Yuta, Manasa]
We replaced the dead photodiode on
  
  8139   Fri Feb 22 17:33:38 2013 ChloeUpdate QPD circuit diagramToday I tested the circuitry within the
QPD to make sure I had put it back together
correctly. The output was able to detect
 IMG_0377.JPG 
  8140   Fri Feb 22 20:28:17 2013 JamieUpdateComputerslinux1 dead, then undeadAt around 2:30pm today something brought
down most of the martian network.  All
control room workstations, nodus, etc. were
 FX-606-U4_1205.pdf 
  8141   Sat Feb 23 00:34:28 2013 yutaUpdateComputerscrontab in op340m deleted and restored (maybe)I
accidentally overwrote crontab in op340m
with an empty file.
  
  8143   Sat Feb 23 07:14:58 2013 yutaUpdateLSCcan't lock Y armI tried to align and lock Y arm for the
first time after pumping.
But I couldn't lock Y arm for more
 TRYPOY.png 
  8144   Sat Feb 23 14:04:07 2013 KojiUpdateComputersapache retarted (Re: linux1 dead, then undead)apache has been restarted. 
How to: search "apache"
on the 40m wiki
  
  8145   Sat Feb 23 14:52:03 2013 JenneUpdateLSCETMYT camera back to normal

    

       
            
  
  8146   Sat Feb 23 15:26:26 2013 yutaUpdateComputerscrontab in op340m updatedI found some daily cron jobs for op340m
I missed last night. Also, I edited timings
of hourly jobs to maintain consistency with
  
  8147   Sat Feb 23 15:46:16 2013 ranaUpdateComputerscrontab in op340m updatedAccording to Google, you can add
a line in the crontab to backup the crontab
by having the cronback.py script be in the
  
  8148   Sat Feb 23 16:16:11 2013 Max HortonUpdateSummary PagesMultiprocessingCalendars:  The calendar issue
discussed previously (http://nodus.ligo.caltech.edu:8080/40m/8098)
 where the numbers are squished together
  
  8149   Sat Feb 23 16:54:24 2013 JenneUpdateLSCcan't lock Y armI'm not sure that Yuta had found the real
Yarm flashes last night.  When I came
in today, the Yarm would flash.  However
  
  8150   Sat Feb 23 17:14:59 2013 yutaUpdateLSCcan't lock Y armJenne found that;
  0. If all mirrors are "aligned,"
Yarm flashes.
  
  8152   Sun Feb 24 00:14:28 2013 ManasaUpdateSUSSUS SummaryI tried to fix the alarms for sensors on
the SUS summary screen. I checked earlier
elogs and found the setSensors.py script.
  
ELOG V3.1.3-