40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 198 of 354  Not logged in ELOG logo
ID Date Author Type Categorydown Subject Text Attachments
  634   Thu Jul 3 18:48:09 2008 AlbertoUpdateGeneralBeats of the two lasers in the absolute length measurement observed I adjusted the alignment of the flipper mirror
as suggested by Koji making the two beam
spots match. I also aligned all the IFO mirrors
  
  635   Thu Jul 3 22:54:45 2008 KojiUpdateGeneralBeats of the two lasers in the absolute length measurement observed Great! Conguraturation! I wish if I could
see it! It's nice if you can put the photo
or anything of the RF spectrum analyzer.
  
  637   Mon Jul 7 11:22:02 2008 AlbertoUpdateGeneralBeats of the two lasers in the absolute length measurement observed I didn't post a screenshot from the RF SA
because I had troubles with the interface
with the computer (unfortunately the network
  
  638   Mon Jul 7 13:06:38 2008 KojiUpdateGeneralBeats of the two lasers in the absolute length measurement observed One may need an RF filter after the mixer.
I expect the SR560 does work for this purpose.
If it does not, a passive LPF can be used.
  
  643   Mon Jul 7 19:15:38 2008 AlbertoUpdateGeneralOptics alignement on the ABS length experimentToday I started setting up the PLL instruments
to lock the frequency of the NPRO beam to
the IFO beam. with no need of a new alignment
  
  650   Tue Jul 8 21:58:22 2008 albertoUpdateGeneralSecondaty beam aligned to the IFO beam againYesterday the alignment of the secondary beam
to the IFO was completely lost and today
I had to realign all the optics before I
  
  653   Wed Jul 9 17:58:19 2008 JohnSummaryGeneralIlluminator alarmsThis morning some time was wasted on alignment
due to the illuminators.
  
  656   Thu Jul 10 19:12:07 2008 AlbertoUpdateGeneralabs cavity length measurement experimentYesterday morning, when I started, I found
the IFO beam on a different position and
the beam spot at the AS port looked very
  
  664   Sun Jul 13 22:39:16 2008 JohnSummaryGeneralEdited medm screens I've edited the FSS and PMC screens so that
red boxes are shown around the appropriate
slider if a gain or offset is not within
  
  668   Mon Jul 14 19:15:43 2008 AlbertoUpdateGeneralabs cavity length measurement experimentLately I've been dealing with the alignment
of the interferometer to have a good beam
spot at the AS port. Today the alignment
  
  669   Mon Jul 14 21:34:10 2008 AlbertoUpdateGeneralabs cavity length measurement experiment[quote]Lately I've been dealing with the alignment
of the interferometer to have a good beam
spot at the AS port. Today the alignment
  
  674   Tue Jul 15 12:23:22 2008 JenneUpdateGeneralMC2 Watchdog trippedAlberto, Jenne

Mode Cleaner was unlocked.  We checked, and
  
  683   Wed Jul 16 16:59:07 2008 AlbertoUpdateGeneralAligmentI think the two beams are aligned again -
they both pass the Faraday, they match at
the irises and all along the optical path
  
  687   Thu Jul 17 00:59:18 2008 JenneSummaryGeneralFunny signal coming out of VCOWhile working on calibrating the MC_F signal,
Rana and I noticed a funny signal coming
out of the VCO.  We expect the output to
 VCOout_time.PNGVCOout_freq.PNG 
  706   Mon Jul 21 11:54:00 2008 JenneUpdateGeneralMC Servo BoardI pulled the MC Servo Board again, to check
the components that are on the board, and
compare them with the schematics.  The filters
  
  727   Wed Jul 23 21:48:30 2008 robConfigurationGeneralrestore IFO when you're done with it
[SIZE=3][B]when you are done with the IFO,
please click "Restore last auto-alignment"[/B][/SIZE]
  
  738   Fri Jul 25 10:48:13 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Realignment / beating / PLL trialAlberto and Koji

o We worked for the abs length measurement
  
  748   Mon Jul 28 15:54:04 2008 KojiUpdateGeneralAbs. Len. Meas. ~ More on the beat / the PLL setupAlberto and Koji,

Last Friday evening, Koji found that the
 PLL_setup.pngbeat_at_8MHz.jpg 
  774   Thu Jul 31 10:24:32 2008 KojiUpdateGeneralIFO statusLast night I used the Y-arm for the abs length
measurement. The Yarm was aligned by the
script. 
  
  776   Thu Jul 31 11:19:30 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Resonance search trialLast night, I tried to find the resonance
of Yarm by sweeping the frequency of the
injection beam.
  
  782   Sat Aug 2 12:53:43 2008 KojiUpdateGeneralAbs. Len. Meas. ~ New PLL at the PSL table[B]Report of the work last night:[/B]
The new heterodyne interferometer on the
PSL table was built.
 yarm_dc.png 
  783   Sat Aug 2 13:07:23 2008 KojiConfigurationGeneralThe AP table cleanedDuring the construction of the independent
PLL I cleaned up some of the unused optics
from the AP table. Essentially this should
  
  787   Mon Aug 4 00:37:58 2008 KojiUpdateGeneralAbs. Len. Meas. ~ RF PD at the Y end / Manual frequency scan[B]Work log on August 2nd[/B]

o Just remind you:
 YEND_LAYOUT.png4th_FSR1.png4th_FSR2.png 
  788   Mon Aug 4 00:56:07 2008 KojiHowToGeneralAbs. Len. Meas. ~ Auto freq scanner with GPIB[B]Work log on August 3rd  - Part1[/B]

o Yesterday I was too much tired of changing
 freq_scan.png 
  789   Mon Aug 4 05:23:57 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Measurement for Y-arm completedFinally, I have completed the abs length and
g-factor measurements for Y-arm.
[COLOR=green][B]>>>GO FOR THE VENT<<<[/B][/COLOR]
  
  793   Mon Aug 4 21:48:24 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Scan for TEM00/01/10[B]Work log on August 3rd  - Part2[/B]

o I tried to measure the frequency of the
 TEM00.pngTEM01.pngknife_edge.png 
  794   Mon Aug 4 22:31:10 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Simple Test for TEM01/10 split[B]Work log on August 3rd - Part3[/B]

[B]Question:[/B]
 TEM01_10.png 
  795   Tue Aug 5 00:05:57 2008 KojiUpdateGeneralAbs. Len. Meas. ~ IFR2023A calibration[B]Work log on August 4th[/B]

o IFR2023A (Marconi) was calibrated by the
  
  796   Tue Aug 5 02:39:55 2008 KojiConfigurationGeneralAbs. Len. Meas. ~ Optical Layout on the AP / PSL table 2008-Aug-05Here are the PDF and the PNG of the AP and
PSL table layouts.
After this photo, the squeezing setup at
 optical_layout_ap_table3.pngoptical_layout_ap_table3.pdfoptical_layout_PSL_table1.pngoptical_layout_PSL_table1.pdf 
  798   Tue Aug 5 10:56:05 2008 AlbertoConfigurationGeneralITMX chamber opened and mirror releasedD-Mass, Steve, Rana, Koji, Yoichi, Alberto,
We opened the ITMX chamber to check the optics
after last week earthquake. In particular,
  
  800   Tue Aug 5 17:56:23 2008 AlbertoConfigurationGeneralSRM and PRM inspectionYoichi, Koji, Rana, Steve, Alberto

Today we opened the [B]BSC[/B] to inspect
 IMG_1434.JPGIMG_1456.JPG 
  801   Wed Aug 6 11:10:34 2008 KojiUpdateGeneralAbs. Len. Meas. ~ analysis of the TEM00 scan[B]Analysis of the data on August 3th ~ Part
1[/B]
 TEM00fit.pngTEM00FSRfit.png 
  802   Wed Aug 6 11:43:52 2008 KojiUpdateGeneralAbs. Len. Meas. ~ analysis of the TEM01 scan[B]Analysis of the data on August 3th ~ Part
2[/B]
 TEM01fit.png 
  805   Wed Aug 6 19:01:15 2008 AlbertoUpdateGeneralITMX and SRM OSEM post-earthquake diagnosticKoji, Yoichi, Alberto

Today we reset the OSEMs on ITMX and SRM
  
  838   Thu Aug 14 21:52:51 2008 KojiSummaryGeneralAbs. Len. Meas. ~ summary of my SummerI have made the summary of the absolute length
measurement.
It is attached here. The file is a bit big
 mode_spacing_measurement_080816_v2.pdf 
  875   Mon Aug 25 10:23:53 2008 steveHowToGeneralcable killerRack 1Y7 double violation:

BNC cables left to be jammed by door
 cablkill.pngcablkll2.png 
  938   Wed Sep 10 08:57:03 2008 steveUpdateGeneraletmy illuminator turned offThe ETMY illuminator was left on yesterday.
I just turned it off.
  
  940   Wed Sep 10 19:53:53 2008 AlbertoUpdateGeneralabs length experimentUpdate of the last days work on the experiment
to measure the absolute length of the cavities.
  
  943   Thu Sep 11 23:28:35 2008 albertoUpdateGeneralabs cavity length experimentThe MC lost lock for some reason not related
to either the FSS or the PMC I'm done with
my measurement for tonight. I've shut the
  
  944   Fri Sep 12 11:09:20 2008 AlbertoUpdateGeneralabs cavity length experimentI'm leaving the lab for a couple of hours.
I shut the NPRO. The interferometer is available
to anyone.
  
  945   Sat Sep 13 23:13:01 2008 AlbertoUpdateGeneralabs cavity length experimentThe Y arm was locked all time today but, suddenly,
this afternoon it lost lock and since then
I've been unable to restore it. I tried unsuccessfully
  
  946   Sun Sep 14 18:30:32 2008 AlbertoUpdateGeneralABSL: measured X armToday I measured the X arm FSR.
Hi moved the fast PD (Thor Labs PDA255) from
the Y end table to the X end table. I had
  
  947   Sun Sep 14 19:29:07 2008 AlbertoUpdateGeneralABSL: measured X arm[quote]Today I measured the X arm FSR.
Hi moved the fast PD (Thor Labs PDA255) from
the Y end table to the X end table. I had
  
  956   Wed Sep 17 13:58:36 2008 AlbertoUpdateGeneralABSL: results from the X armToday I repeated the measurement of the FSR
on the X arm cavity. The noise in the transmitted
power that made the measures fluctuate was
 Sept17_XarmFSRmeasurement_report.ps 
  960   Wed Sep 17 19:13:47 2008 AlbertoUpdateGeneralABSL: statusI installed the setup for measuring TEM01/10
on the X end table. 
I'm leaving. I shut the laser, flipped down
  
  962   Thu Sep 18 09:30:12 2008 steveUpdateGenerallow noise metal film resistors are inLow noise metal film resistor and capacitor
kits from www.garrettelec.com are in.
 mfr&cap.pngstorcab.png 
  979   Mon Sep 22 20:00:35 2008 AlbertoUpdateGeneralABSL: running measurementI'm leaving the X arm locked on the TEm01
mode while a measurement is running. Just
please wait for 40 minute if you need the
  
  987   Wed Sep 24 17:57:04 2008 AlbertoUpdateGeneralABSL: FSS Slow Actuator ControlRana, Alberto

Today when I started working with the PLL
  
  994   Thu Sep 25 17:14:31 2008 ranaConfigurationGeneralnew sitemap   vegemite.png 
  1030   Tue Oct 7 10:49:29 2008 AlbertoUpdateGeneralDisplaced PhotodiodeThis morning I found that the photodidode
of the PLL in the PSL table was not aligned
to the beam anymore. The PD support was not
  
ELOG V3.1.3-