40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 197 of 341  Not logged in ELOG logo
IDup Date Author Type Category Subject Text Attachments
  9855   Fri Apr 25 13:18:08 2014 Dark JamieUpdateLSClocking activity

    

       
            
 m10008_f1_bg.jpg 
  9856   Fri Apr 25 22:20:01 2014 ranaUpdateIOOcsh/tcsh hackery combattedTo make the mcwfson/off scripts work from
rossa (and not just Jamie's pet machine)
I swapped the sh-bang line at the top of
  
  9857   Fri Apr 25 23:08:57 2014 ranaSummaryIOOMC2_TRANS QPD Servo re-re-engaged againWe turned on the MC2_TRANS paths for both
PIT/YAW tonight.
  
  9858   Sat Apr 26 13:19:59 2014 ericqSummaryIOOMC2_TRANS QPD Servo re-re-engaged again

    

       
            
  
  9859   Sun Apr 27 19:53:54 2014 ericqUpdateLSCPRFP YArm LockingInspired by a comment by Koji the other
day, I spent some time yesterday and today
working on locking a (very lossy) power recycled
  
  9860   Sun Apr 27 20:26:19 2014 KojiUpdateLSCPhase Tracker servo characterizationThe measured open loop TF of the ALS Phase
Tracker loop for each arm was characterized
by an empirical model on LISO.
 ALSX_PTTF.pdfALSY_PTTF.pdf 
  9861   Sun Apr 27 21:30:59 2014 KojiUpdateLSCALS servo characterizationThe measured openloop TF of the ALS servo
for each was characterized by a ZPK model.
The openloop TF can be modeled by:
 ALSX_OLTF.pdfALSY_OLTF.pdf 
  9862   Mon Apr 28 10:24:10 2014 KojiUpdateLSCerror signal characterizationAs we now have the loop model, we can characterize
the error signals.
We have the following data:
 ALSX_SPE.pdfALSY_SPE.pdf 
  9863   Mon Apr 28 10:34:51 2014 KojiUpdateLSCnew ALS servo designBased on the evaluation of the error signals,
the new servo was designed.
Concept:
 ALSX_OLTF_new2.pdfALSY_OLTF_new2.pdf 
  9864   Mon Apr 28 10:48:48 2014 KojiUpdateLSCnew ALS servo design: comparisonComparison of the new and old servo
OLTF
The new servo has the same UGF, slightly
 ALSX_OLTF_new.pdfALSY_OLTF_new.pdf 
  9865   Mon Apr 28 10:59:54 2014 KojiUpdateLSCNew ALS servo design: expected error signalsThe expected error signals derived from
the estimated free running error signals
of the ALS.
 ALSX_SPE_new.pdfALSY_SPE_new.pdf 
  9866   Mon Apr 28 11:03:57 2014 KojiConfigurationLSCNew ALS servo implemented for the X armThe
new ALS/LSC servo was implemented for the
X arm.
  
  9867   Mon Apr 28 11:08:11 2014 KojiUpdateLSCNew ALS servo design: expected error signalsHere are the MATLAB scripts and LISO codes
for all of these servo analyses
 140421_ALS_servo.zip 
  9868   Mon Apr 28 13:18:18 2014 JenneUpdateLSCLSC offsets script modified

    

       
            
  
  9869   Mon Apr 28 15:47:57 2014 manasaSummaryIOOMC2_TRANS QPD Servo trend

    

       
            
 MC_TRANSservoApr28.png 
  9870   Mon Apr 28 17:27:29 2014 steveUpdatesafetysafety audit 2014

    

       
            
  
  9871   Mon Apr 28 20:31:38 2014 ranaSummaryIOOMC2_TRANS QPD Servo trendThis is a 4-day trend. I don't see any
difference here which is significant. My
guess is that the MC_TRANS servo gain is
 Untitled.png 
  9872   Mon Apr 28 23:05:03 2014 JenneUpdateLSCALS CARM and DARM settings[Jenne, Koji]
The IFO is being uncooperative tonight,
and I have an early morning meeting, so I'm
  
  9873   Tue Apr 29 00:11:03 2014 steveUpdatesafetysafety audit 2014Be aware that
this may affect POP QPD and POP RF Thorlabs
  
  9874   Tue Apr 29 01:10:16 2014 KojiConfigurationLSCNew ALS servo implemented for the X armNew ALS servo performance
Attachment 1:
Comparison between the old (
 ALSX_SPE.pdfALSX_PDH_SPE.pdf 
  9875   Tue Apr 29 10:01:25 2014 KojiConfigurationGeneralnetgpibdata is working again nowI've moved the WB network analyzer to the
OMC lab. The 40m network analyzer is not
in service for the MC monitoring.
  
  9876   Tue Apr 29 16:42:29 2014 SteveUpdateVACTP2 drypump replaced

    

       
            
 dryforepumpreplaced.png 
  9877   Wed Apr 30 00:40:55 2014 manasaConfigurationLSCY arm IR lock troubleshooting[Koji, Manasa]
The
  
  9878   Wed Apr 30 11:16:41 2014 SteveUpdateIOOthis typical morningc1sus and c1iscey were reset. The PMC needed
to be locked. MC locked instantly.
The FSS ion pump power supply was
 40days.png 
  9879   Wed Apr 30 14:21:50 2014 manasaUpdateCDSfb restartedc1sus and c1isey were not talking to fb.
The usual mxstream restart did not help.
Restarted fb
  
  9880   Wed Apr 30 16:07:59 2014 manasaUpdateLSCALS X noise post servo modificationI. The Y arm stayed stable through last
night and I have saved the arm lock settings
to IFOconfigure.
 ALSX_PToltf.jpgALSX_FreeInloop.jpgALSX_ool.jpgALSX_OLTF.jpg 
  9881   Wed Apr 30 17:07:19 2014 jamieUpdateCDSc1ioo now on Dolphin networkThe
c1ioo host is now fully on the dolphin network!
After the mx
 dolphin.pngALSXonDolphin.pdf 
  9882   Wed Apr 30 17:45:34 2014 jamieUpdateCDSc1ioo now on Dolphin networkFor reference, here are the new IPC entries
that were made for the ALS X/Y phase between
c1als and c1lsc:
  
  9883   Wed Apr 30 18:06:06 2014 jamieUpdateCDSPOP QPD signals now on dolphinThe POP QPD X/Y/SUM signals, which are
acquired in c1ioo, are now being broadcast
over dolphin.  c1ass was modified to
 c1ass-POPQPD.pngc1ioo-POPQPD.png 
  9884   Wed Apr 30 21:16:42 2014 ranaUpdateLSCMC2 Strad   bettsreplica.jpgMC_Y_vio.pdfMC2_vio.pdf 
  9885   Wed Apr 30 21:31:25 2014 ranaHowToIOOMystery Alignment againLooks like there was some mysterious MC
alignment shift around 5:30 PM today, but
no elog.....?? Now things are drifting much
  
  9886   Wed Apr 30 21:57:07 2014 ranaSummaryIOOMC2_TRANS QPD Servo now on for real   dolphin.pngMC2_QPD_trend.png 
  9887   Thu May 1 00:13:21 2014 KojiUpdateLSCALS X beat setup alignedI saw big misalignment on the GTRX camera,
I went to the PSL table and aligned the beat
beams.
  
  9888   Thu May 1 03:15:03 2014 JenneUpdateLSCYarm locking with CM board[Rana, EricQ, Jenne]
We locked the Yarm by using the CM
board this evening. 
 Yarm_CMlocking_spectra_30Apr2014_copy.pdfYarm_CMlocking_TFs_30Apr2014_copy.pdf 
  9889   Thu May 1 03:23:07 2014 ericqUpdateLSCYarm locking with CM board

    

       
            
  
  9890   Thu May 1 10:23:42 2014 jamieUpdateCDSc1ioo dolphin fiber nicely routedSteve and I nicely routed the dolphin fiber
from c1ioo in the 1X2 rack to the dolphin
switch in the 1X4 rack.  I shutdown
 green.png 
  9891   Thu May 1 13:03:34 2014 JenneUpdateLSCMC board pulled for AC coupling

    

       
            
  
  9892   Thu May 1 14:45:44 2014 JenneUpdateLSCMC board back in

    

       
            
 IMG_1394.JPGIMG_1395.JPGIMG_1398.JPGIMG_1402.JPG 
  9893   Thu May 1 16:41:35 2014 ericqUpdateLSCYarm locking with CM board (Edited this post; Forgot
to account for the FMs other than 4 and 5...
it now agrees better!)
 AOsignsSame.pdfAOsignsOpposite.pdfloopModeling.m 
  9894   Thu May 1 17:00:05 2014 ranaUpdateLSCYarm locking with CM board I think that's about halfway there.
Since this needs to be a precise comparison,
we cannot use so many approximations.
  
  9895   Thu May 1 17:14:36 2014 steveUpdatePSLthin window AR measuredCVI broadband AR coating was measured at
the PSL-enclosure table around 9-10am today.
The 2W Innolight first PBS  S polarization
  
  9896   Fri May 2 01:01:28 2014 ranaUpdateCDSc1ioo dolphin fiber nicely routedThis C1IOO business seems to be wiping
out the MC2_TRANS QPD servo settings each
day. 
  
  9897   Fri May 2 01:58:52 2014 ranaConfigurationComputer Scripts / ProgramsupdateDB configured to index NFS during CRON dailyI wanted
to use locate to find some files today, but
  
  9898   Fri May 2 02:22:56 2014 rana, QUpdateIOOMC alignmentsWe were having unstable MC locking so we
did some physical alignment touch up. Use
MC suspension bias to have good MC alignment.
  
  9899   Fri May 2 03:51:29 2014 ranaUpdateLSCfarther into CMRana, Q
After some more matlab loopology
(see Qlog), we turned on the AO path successfully.
 MCkicked.png 
  9900   Fri May 2 08:15:54 2014 steveUpdatesafetysafety audit 2014 
 Late adition: CHECK all viewport covers.
 solidCoverRequired.jpg 
  9901   Fri May 2 08:38:07 2014 SteveUpdateIOOthis typical morning 
 c1sus needed reset.
 2dTrend.png 
  9902   Fri May 2 10:38:29 2014 steveUpdatePSLthin window AR measured

    

       
            
  
  9903   Fri May 2 11:14:47 2014 jamieUpdateCDSc1ioo dolphin fiber nicely routed

    

       
            
  
  9904   Fri May 2 13:03:30 2014 JenneUpdateLSCALS Y beat setup alignedI touched up the alignment of the Ygreen
on the PSL table.
  
ELOG V3.1.3-