40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 16 of 173  Not logged in ELOG logo
Entry  Tue Aug 26 09:58:59 2008, steve, Omnistructure, COC, ETMX is #03 etmx-d40posg_012.jpgetmx03.jpg
Entry  Tue Aug 26 12:00:45 2008, Jenne, Summary, PEM, Transfer function of Ranger seismometer 
Entry  Tue Aug 26 15:06:16 2008, steve, Configuration, VAC, rga scan RGA-0808260125.png
Entry  Tue Aug 26 18:19:16 2008, rana, Omnistructure, Electronics, Resistor Noise at the 40m SEI-RN_RNM.pdf
Entry  Tue Aug 26 19:07:37 2008, Yoichi, HowTo, Computers, Reading data from Agilent 4395A analyzer through GPIB from *Linux* machine 
Entry  Wed Aug 27 10:55:35 2008, Yoichi, HowTo, Computers, Annoying behavior of the touch pads of the lab. laptops is fixed 
Entry  Wed Aug 27 12:09:10 2008, Eric, Summary, Cameras, Weekly Summary originalETMX.pngrotatedETMX.png
Entry  Thu Aug 28 19:02:25 2008, rana, josephb, rob, Summary, Computers, big boot 
Entry  Wed Aug 27 13:55:43 2008, rana,jenne, Update, PSL, PMC Servo Board 
    Reply  Fri Aug 29 02:40:43 2008, rana,jenne, Update, PSL, PMC Servo Board pmclp-07.pdfpmclp_40m_080824.mpmclp.m
Entry  Fri Aug 29 11:01:49 2008, josephb, Configuration, Computers, Attempt to change a channel gain in ICS-110B 
Entry  Fri Aug 29 11:05:11 2008, josephb, Summary, Computers, c1asc was down this morning 
Entry  Fri Aug 29 12:41:26 2008, josephb, Eric, Configuration, Computers, More front ends moved to new network 
Entry  Fri Aug 29 12:43:44 2008, josephb, Summary, Computers, c1susvme1 down 
Entry  Fri Aug 29 15:01:45 2008, steve, Update, PSL, MOPA_HTEMP in increasing htcl.jpg
Entry  Thu Aug 28 18:56:14 2008, rana, Configuration, PSL, beam block distorted 
    Reply  Fri Aug 29 10:20:32 2008, Yoichi, Configuration, PSL, beam block distorted 
    Reply  Fri Aug 29 16:35:18 2008, Yoichi, Configuration, PSL, beam block distorted 
Entry  Fri Aug 29 17:39:25 2008, rana, Configuration, PSL, PMC: ADC Channels mcf.png
Entry  Fri Aug 29 18:24:48 2008, rana, HowTo, PSL, PMC: PZT Calibration pmc-pzt-cal.pdfmcf.png
Entry  Sat Aug 30 13:28:01 2008, rana, Configuration, PSL, PMC: List of changes 
Entry  Fri Aug 29 22:57:48 2008, Yoichi, Update, PSL, FSS loop transfer functions OPLTFs.pdfOPLTFsScaled.pdf
    Reply  Mon Sep 1 04:34:00 2008, rana, Update, PSL, FSS loop transfer functions n.pdfFSSLO.PNGFSSLO-Spec.pngPC25.pngpc.pdf
       Reply  Tue Sep 2 07:58:34 2008, rana, Summary, PSL, FSS & PMC LO trends for 2 years psl-lo-trend.png
Entry  Mon Sep 1 19:23:17 2008, Yoichi, Configuration, PSL, FSS on an auxiliary loop 
    Reply  Tue Sep 2 09:58:42 2008, Yoichi, Configuration, PSL, FSS on an auxiliary loop 
Entry  Tue Sep 2 10:09:03 2008, steve, Update, PSL, head temp is cooling down 
Entry  Tue Sep 2 14:28:41 2008, Yoichi, Update, PSL, FSS EOM driving signal spectra RFDrive1.pngRFDrive2.png
Entry  Tue Sep 2 22:43:16 2008, Yoichi, Configuration, PSL, Updated FSS open loop TF OPLTF.png
Entry  Wed Sep 3 12:26:49 2008, Eric, Summary, Cameras, Weekly Summary SimulatedErrorComparison.png
Entry  Wed Sep 3 18:43:19 2008, Yoichi, Configuration, Electronics, Two more active probes Tektronix-P6201-active-probe.pdf
Entry  Wed Sep 3 18:45:01 2008, Alberto, Configuration, , PD3 gain 
Entry  Wed Sep 3 19:09:56 2008, Yoichi, DAQ, Computers, c1iovme power cycled 
    Reply  Thu Sep 4 00:38:14 2008, rana, Update, PSL, c1iovme power cycled 
       Reply  Thu Sep 4 07:29:52 2008, Yoichi, Update, PSL, c1iovme power cycled 
Entry  Thu Sep 4 07:46:10 2008, Yoichi, Update, IOO, MC is now happy MC-lock.png
Entry  Thu Sep 4 10:13:48 2008, Jenne, Update, IOO, We unlocked the MC temporarily 
Entry  Thu Sep 4 13:48:50 2008, Yoichi, Update, PSL, FSS modulation depth RCScan.png
Entry  Thu Sep 4 14:43:58 2008, Jenne, Update, PSL, PMC Open Loop Gain OpenLoopTF04Sept2008.png
Entry  Thu Sep 4 11:33:25 2008, josephb, Eric, Jenne, Configuration, Computers, Attempt to increase gain for C1:PSL-ISS_INMONPD_F via 110B 
    Reply  Thu Sep 4 16:24:56 2008, rana, Configuration, Computers, Attempt to increase gain for C1:PSL-ISS_INMONPD_F via 110B 
Entry  Thu Sep 4 17:03:25 2008, Yoichi, Update, PSL, RF oscillator noise comparison RFSpectra.png
Entry  Thu Sep 4 17:12:57 2008, Yoichi, Update, PSL, FSS open loop TF FSS-OPLTFs.png
Entry  Thu Sep 4 17:17:03 2008, Yoichi, Update, IOO, MC open loop TF MC-OPLTF.png
Entry  Thu Sep 4 17:44:27 2008, Yoichi, Update, PSL, FSS error signal spectrum FSS-Error-Spe.png
Entry  Thu Sep 4 18:02:34 2008, rana, josephb, Configuration, PEM, Accelerometer gains increased by 10 acc.png
Entry  Fri Sep 5 08:34:03 2008, steve, Update, PSL, MZ locked mzhv.jpg
Entry  Fri Sep 5 09:56:14 2008, josephb, Eric, Configuration, Computers, Funny channels, reboots, and ethernet connections 
Entry  Mon Sep 8 10:57:49 2008, steve, Update, IOO, the psl and mc are back to normal fss.pngpmcbrick.pngbrick.jpg
Entry  Fri Sep 5 10:36:34 2008, steve, Update, PEM, thermostate setting changed 
    Reply  Fri Sep 5 15:09:50 2008, rana, Update, PEM, thermostate setting changed 
       Reply  Mon Sep 8 13:47:35 2008, steve, Update, PEM, thermostate setting changed 
Entry  Mon Sep 8 15:38:57 2008, Yoichi, Configuration, PSL, POY RF amp is back to its original task 
Entry  Wed Sep 10 08:57:03 2008, steve, Update, General, etmy illuminator turned off 
Entry  Wed Sep 10 13:28:25 2008, Yoichi, Summary, Electronics, IOO rack lost -24V (recovered) 
Entry  Wed Sep 10 19:53:53 2008, Alberto, Update, General, abs length experiment 
Entry  Thu Sep 11 11:29:14 2008, josephb, Configuration, Computers, Final netgear switch in place in 1Y2 
Entry  Thu Sep 11 14:27:53 2008, steve, Bureaucracy, SAFETY, safety training 
Entry  Thu Sep 11 23:28:35 2008, alberto, Update, General, abs cavity length experiment 
Entry  Fri Sep 12 11:09:20 2008, Alberto, Update, General, abs cavity length experiment 
Entry  Sat Sep 13 23:13:01 2008, Alberto, Update, General, abs cavity length experiment 
ELOG V3.1.3-