40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 16 of 173
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
8608 Entries
Goto page
Previous
1
,
2
,
3
...
15
, 16,
17
...
171
,
172
,
173
Next
Tue Aug 26 09:58:59 2008, steve, Omnistructure, COC, ETMX is #03
Tue Aug 26 12:00:45 2008, Jenne, Summary, PEM, Transfer function of Ranger seismometer
Tue Aug 26 15:06:16 2008, steve, Configuration, VAC, rga scan
Tue Aug 26 18:19:16 2008, rana, Omnistructure, Electronics, Resistor Noise at the 40m
Tue Aug 26 19:07:37 2008, Yoichi, HowTo, Computers, Reading data from Agilent 4395A analyzer through GPIB from *Linux* machine
Wed Aug 27 10:55:35 2008, Yoichi, HowTo, Computers, Annoying behavior of the touch pads of the lab. laptops is fixed
Wed Aug 27 12:09:10 2008, Eric, Summary, Cameras, Weekly Summary
Thu Aug 28 19:02:25 2008, rana, josephb, rob, Summary, Computers, big boot
Wed Aug 27 13:55:43 2008, rana,jenne, Update, PSL, PMC Servo Board
Fri Aug 29 02:40:43 2008, rana,jenne, Update, PSL, PMC Servo Board
Fri Aug 29 11:01:49 2008, josephb, Configuration, Computers, Attempt to change a channel gain in ICS-110B
Fri Aug 29 11:05:11 2008, josephb, Summary, Computers, c1asc was down this morning
Fri Aug 29 12:41:26 2008, josephb, Eric, Configuration, Computers, More front ends moved to new network
Fri Aug 29 12:43:44 2008, josephb, Summary, Computers, c1susvme1 down
Fri Aug 29 15:01:45 2008, steve, Update, PSL, MOPA_HTEMP in increasing
Thu Aug 28 18:56:14 2008, rana, Configuration, PSL, beam block distorted
Fri Aug 29 10:20:32 2008, Yoichi, Configuration, PSL, beam block distorted
Fri Aug 29 16:35:18 2008, Yoichi, Configuration, PSL, beam block distorted
Fri Aug 29 17:39:25 2008, rana, Configuration, PSL, PMC: ADC Channels
Fri Aug 29 18:24:48 2008, rana, HowTo, PSL, PMC: PZT Calibration
Sat Aug 30 13:28:01 2008, rana, Configuration, PSL, PMC: List of changes
Fri Aug 29 22:57:48 2008, Yoichi, Update, PSL, FSS loop transfer functions
Mon Sep 1 04:34:00 2008, rana, Update, PSL, FSS loop transfer functions
Tue Sep 2 07:58:34 2008, rana, Summary, PSL, FSS & PMC LO trends for 2 years
Mon Sep 1 19:23:17 2008, Yoichi, Configuration, PSL, FSS on an auxiliary loop
Tue Sep 2 09:58:42 2008, Yoichi, Configuration, PSL, FSS on an auxiliary loop
Tue Sep 2 10:09:03 2008, steve, Update, PSL, head temp is cooling down
Tue Sep 2 14:28:41 2008, Yoichi, Update, PSL, FSS EOM driving signal spectra
Tue Sep 2 22:43:16 2008, Yoichi, Configuration, PSL, Updated FSS open loop TF
Wed Sep 3 12:26:49 2008, Eric, Summary, Cameras, Weekly Summary
Wed Sep 3 18:43:19 2008, Yoichi, Configuration, Electronics, Two more active probes
Wed Sep 3 18:45:01 2008, Alberto, Configuration, , PD3 gain
Wed Sep 3 19:09:56 2008, Yoichi, DAQ, Computers, c1iovme power cycled
Thu Sep 4 00:38:14 2008, rana, Update, PSL, c1iovme power cycled
Thu Sep 4 07:29:52 2008, Yoichi, Update, PSL, c1iovme power cycled
Thu Sep 4 07:46:10 2008, Yoichi, Update, IOO, MC is now happy
Thu Sep 4 10:13:48 2008, Jenne, Update, IOO, We unlocked the MC temporarily
Thu Sep 4 13:48:50 2008, Yoichi, Update, PSL, FSS modulation depth
Thu Sep 4 14:43:58 2008, Jenne, Update, PSL, PMC Open Loop Gain
Thu Sep 4 11:33:25 2008, josephb, Eric, Jenne, Configuration, Computers, Attempt to increase gain for C1:PSL-ISS_INMONPD_F via 110B
Thu Sep 4 16:24:56 2008, rana, Configuration, Computers, Attempt to increase gain for C1:PSL-ISS_INMONPD_F via 110B
Thu Sep 4 17:03:25 2008, Yoichi, Update, PSL, RF oscillator noise comparison
Thu Sep 4 17:12:57 2008, Yoichi, Update, PSL, FSS open loop TF
Thu Sep 4 17:17:03 2008, Yoichi, Update, IOO, MC open loop TF
Thu Sep 4 17:44:27 2008, Yoichi, Update, PSL, FSS error signal spectrum
Thu Sep 4 18:02:34 2008, rana, josephb, Configuration, PEM, Accelerometer gains increased by 10
Fri Sep 5 08:34:03 2008, steve, Update, PSL, MZ locked
Fri Sep 5 09:56:14 2008, josephb, Eric, Configuration, Computers, Funny channels, reboots, and ethernet connections
Mon Sep 8 10:57:49 2008, steve, Update, IOO, the psl and mc are back to normal
Fri Sep 5 10:36:34 2008, steve, Update, PEM, thermostate setting changed
Fri Sep 5 15:09:50 2008, rana, Update, PEM, thermostate setting changed
Mon Sep 8 13:47:35 2008, steve, Update, PEM, thermostate setting changed
Mon Sep 8 15:38:57 2008, Yoichi, Configuration, PSL, POY RF amp is back to its original task
Wed Sep 10 08:57:03 2008, steve, Update, General, etmy illuminator turned off
Wed Sep 10 13:28:25 2008, Yoichi, Summary, Electronics, IOO rack lost -24V (recovered)
Wed Sep 10 19:53:53 2008, Alberto, Update, General, abs length experiment
Thu Sep 11 11:29:14 2008, josephb, Configuration, Computers, Final netgear switch in place in 1Y2
Thu Sep 11 14:27:53 2008, steve, Bureaucracy, SAFETY, safety training
Thu Sep 11 23:28:35 2008, alberto, Update, General, abs cavity length experiment
Fri Sep 12 11:09:20 2008, Alberto, Update, General, abs cavity length experiment
Sat Sep 13 23:13:01 2008, Alberto, Update, General, abs cavity length experiment
Goto page
Previous
1
,
2
,
3
...
15
, 16,
17
...
171
,
172
,
173
Next
ELOG V3.1.3-