ID |
Date |
Author |
Type |
Category |
Subject |
11966
|
Mon Feb 1 14:08:06 2016 |
Steve | Update | PEM | roof condtion is good |
It rained hard yesterday. We have not had this strong downpoor for years. We got 0.7" and the roof did not leak. |
11972
|
Wed Feb 3 08:39:17 2016 |
Steve | Update | CDS | blank daily summary pages |
Daily summary pages are blank today. Yesterday is ok |
11975
|
Thu Feb 4 10:14:52 2016 |
Steve | Update | SUS | earthquake 3.5M |
|
11976
|
Thu Feb 4 10:19:05 2016 |
Steve | Update | safety | fire marshal inspection |
Pasadena fire marshal inspected the lab today. No violation was found. |
11980
|
Mon Feb 8 09:37:07 2016 |
Steve | Update | SUS | EQ 3.9m |
No sign of damage
|
11986
|
Thu Feb 11 14:28:50 2016 |
Steve | Update | Treasure | 091415 declared |
Beautifully Done
Chirp
what is next?
Atm 3, Ron Drever could not celebrate with us because of health issues.
|
11987
|
Fri Feb 12 11:10:49 2016 |
Steve | Update | Green Locking | Innolight laser is 10 years old |
It shipped out for repair evaluation.
Arrived to Hayward,CA 2016Feb16
|
11992
|
Tue Feb 16 09:13:39 2016 |
Steve | Update | General | there was a power outage & EQ |
Pasadena reported the Sunday night event as a power transient caused by the trip of a power transmission line. This affected the entire city. Once the loss was detected, the system automatically switches to an alternate source. It was about one second for the system to recover.
2W Innolight, both Lightwaves at the ends, PSL HEPA, Ref Cavity and 3 AC units turned on.
The 40m vacuum did not trip. It is vacuum normal.
The Jetstore computer is indicating power failer.
|
11996
|
Wed Feb 17 09:05:07 2016 |
Steve | Update | VAC | forepump replaced |
TP3 drypump replaced after 10,344 hrs at 750 mTorr foreline pressure.
The foreline pressure is 13 mTorr after 8 hrs of running, TP3: 50K rpm, 0.14 Amp with all annuloses pumped.
The annulos pressures are 0.3 - 5 mtorr
************************
Frame builder just crashed again |
12001
|
Mon Feb 22 08:45:46 2016 |
Steve | Update | SUS | EQ 4.3 grabs ITMX-UL magnet |
Local EQ4.3
kicks ITMX-UL magnet into stuck position.
Hopefully it is only sticking. |
12004
|
Tue Feb 23 09:51:34 2016 |
Steve | Update | SUS | ITMX free |
Good job Q! Give us more details please or play Rachmaninoff Piano Concernto #2
Atm2, EQ 3.5 and 4.1
confirming ITMX is really free
Quote: |
Taking inspiration from J. Lewis et. al, ITMX has been freed.
Even better, I'm now seeing Green flashes in the X arm. 
|
|
12007
|
Wed Feb 24 09:06:25 2016 |
Steve | Update | Treasure | the way it happened |
Celebration
|
12008
|
Wed Feb 24 10:27:23 2016 |
Steve | Update | safety | safety audit 2016 |
Safety audit went smothly.
Crane inspection is scheduled for March 4
Safety glasses will be measured before April 1
|
12010
|
Thu Feb 25 11:02:36 2016 |
Steve | Update | General | Power Glitch again |
Quote: |
Chiara reports an uptime of >195 days, so its UPS is working fine 
FB, megatron, optimus booted via front panel button.
Jetstor RAID array (where the frames live) was beeping, since its UPS failed as well. The beep was silenced by clicking on "View Events/Mute Beeper" at 192.168.113.119 in a browser on a martian computer. I've started a data consistency check via the web interface, as well. According to the log, this was last done in July 2015, and took ~19 hrs.
Frontends powered up; models don't start automatically at boot anymore, so I ran rtcds start all on each of them.
All frontends except c1ioo had a very wrong datetime, so I ran sudo ntpdate -b -s -u pool.ntp.org on all of them, and restarted the models (just updating the time isn't enough). There is an /etc/ntp.conf in the frontend filesystem that points to nodus, which is set up as an NTP server, but I guess this isn't working.
PMC locking was hindered by sticky sliders. I burtrestored the c1psl.snap from Friday, and the PMC locked up fine. (One may be fooled by the unchanged HV mon when moving the offset slider into thinking the HV KEPCO power supplies need to be brought down and up again, but it's just the sliders)
Mode cleaner manually locked and somewhat aligned. Based on my memory of PMC camera/transmission, the pointing changed; the WFS need a round of MC alignment and WFS offset setting, but the current state is fine for operation without all that.
|
10:15 power glitch today. ETMX Lightwave and air conditions turned back on |
12015
|
Wed Mar 2 10:09:28 2016 |
Steve | Update | safety | professional crane inspection |
The crane inspection is scheduled for this coming Friday from 8-12
|
12018
|
Thu Mar 3 10:19:20 2016 |
Steve | Update | safety | safety audit 2016 |
Bob cleaned the safety glasses. They were sonicated in warm 2% Liquinox water for 10 minutes. Steve checked them by transmission measurement of 1064 nm at 150 mW
|
12020
|
Fri Mar 4 11:07:10 2016 |
Steve | Update | safety | crane inspection completes 2016 safey audit |
All 3 cranes inspected by professional and load tested with 450 lbs at max reach.
|
12031
|
Fri Mar 11 16:52:53 2016 |
Steve | Update | PEM | leaky roof |
Johannes found dripping water at the vac rack. It is safe. It is not catching anything. Actual precipitation was only 0.62" |
12035
|
Tue Mar 15 10:31:58 2016 |
Steve | Update | IOO | Laser is turned back on |
It's may be the janitor's doing.
I noticed that the HEPA filers were off. They are turned on at 20%
|
12036
|
Wed Mar 16 15:36:03 2016 |
Steve | Update | SUS | wire standoff test cut |
Ruby wire standoff 1 mm od. with V-groove test cut. SOS sus wire 0.0017" od. is in the background.
|
12038
|
Fri Mar 18 11:04:56 2016 |
Steve | Update | SUS | inverted pendulum |
Kate Dooley picked up this item today. |
12039
|
Mon Mar 21 10:07:45 2016 |
Steve | Update | SUS | ETMX enclosure update |
The enclosure top piece in the middle is still in the machine shop.
The carpenter who helps in the built just left for one week vacation.
The unit will be ready on April 1
I'd prefer doing the installation with the enclosure on the new table.
It's the only way to minimize the resonances of the enclosure with shimming. |
12040
|
Mon Mar 21 14:29:32 2016 |
Steve | Update | Calibration-Repair | 1W Innolight laser repair diagnoses |
Quote: |
Quote: |
After adjusting the alignment of the two beams onto the PD, I managed to recover a stronger beatnote of ~ -10dBm. I managed to take some measurements with the PLL locked, and will put up a more detailed post later in the evening. I turned the IMC autolocker off, turned the 11MHz Marconi output off, and closed the PSL shutter for the duration of my work, but have reverted these to their nominal state now. The are a few extra cables running from the PSL table to the area near the IOO rack where I was doing the measurements from, I've left these as is for now in case I need to take some more data later in the evening...I
|
Innolight 1W 1064nm, sn 1634 was purchased in 9-18-2006 at CIT. It came to the 40m around 2010
It's diodes should be replaced, based on it's age and performance.
RIN and noise eater bad. I will get a quote on this job.
The Innolight Manual frequency noise plot is the same as Lightwave' elog 11956
|
Diagnoses from Glasglow:
“So far we have analyzed the laser. The pump diode is degraded. Next we would replace it with a new diode. We would realign the diode output beam into the laser crystal. We check all the relevant laser parameters over the whole tuning range. Parameters include single direction operation of the ring resonator, single frequency operation, beam profile and others. If one of them is out of spec, then we would take actions accordingly. We would also monitor the output power stability over one night. Then we repackage and ship the laser.” |
12041
|
Tue Mar 22 14:12:18 2016 |
Steve | Update | IOO | Laser is turned back on |
The 2W Innolight was turned on.
|
12043
|
Wed Mar 23 11:55:47 2016 |
Steve | Update | General | Smart UPS 2200 Battery Replaced |
Batteries replaced in control room UPS after 3 years from replaceUPSbattery.com
|
12044
|
Wed Mar 23 15:23:12 2016 |
Steve | Summary | PEM | Guralps as connected |
We have one calibration sheet of GUR- B, from 26 June 2008, model CMG-T40-0008, sn T4157 at ETMY east, interface box input 1
I'm looking for calibration paper of GUR- A, model CMG-T40-0053, sn T4Q17 at ETMX south, interface box input 2
Quote: |
I measured the guralp raw outputs and the TFs using the handheld unit and an FFT analyzer.
[Setup]
The handheld unit was connected to each guralp with the same cable which is confirmed t be functional with the Yend Guralp.
The signal for Z, N, and E directions are obtained from the banana connectors on the handheld unit. Each direction has mass, low gain velocity, and high gain velocity output. The PSDs of the signals were measured with an FFT analyzer. The transfer function from the mass signal to the low/high gain signals were also measured for each direction.
The adjustment screw for the E output of the Xend does not work. I had to tilt the Xend Guralp using the leg screws to bring the E signal to zero.
[Result]
Attachment 1: Raw voltage PSD for all outputs
Attachment 2: Comparison of the low gain vel outputs
- All of the mass output show similar PSDs.
- Low gain velocity outputs shows somewhat similar levels. I still need to check if the output is really the ground velocity or not.
- High gain velocity outputs are either not high gain, broken, or not implemented.
- We need to calibrate the low gain output using signal injection, huddle test, or something else.
Attachment 3: TFs between each mass output and the low or high gain outputs
- TFs between the mass signal and the low vel signals show the similar transfer functions between the channels.
- The high gain outputs show low or no transfer function with regard to the mass signals.
|
|
12045
|
Thu Mar 24 07:56:09 2016 |
Steve | Update | Calibration-Repair | NO Noise Eater for 1W Innolight |
1W Innolight is NOT getting Noise Eater as it was decided yesterday at the 40m meeting. Corrected 3-25-2016
Repair quote with adding noise eater is in 40m wiki
Quote: |
Quote: |
Quote: |
After adjusting the alignment of the two beams onto the PD, I managed to recover a stronger beatnote of ~ -10dBm. I managed to take some measurements with the PLL locked, and will put up a more detailed post later in the evening. I turned the IMC autolocker off, turned the 11MHz Marconi output off, and closed the PSL shutter for the duration of my work, but have reverted these to their nominal state now. The are a few extra cables running from the PSL table to the area near the IOO rack where I was doing the measurements from, I've left these as is for now in case I need to take some more data later in the evening...I
|
Innolight 1W 1064nm, sn 1634 was purchased in 9-18-2006 at CIT. It came to the 40m around 2010
It's diodes should be replaced, based on it's age and performance.
RIN and noise eater bad. I will get a quote on this job.
The Innolight Manual frequency noise plot is the same as Lightwave' elog 11956
|
Diagnoses from Glasglow:
“So far we have analyzed the laser. The pump diode is degraded. Next we would replace it with a new diode. We would realign the diode output beam into the laser crystal. We check all the relevant laser parameters over the whole tuning range. Parameters include single direction operation of the ring resonator, single frequency operation, beam profile and others. If one of them is out of spec, then we would take actions accordingly. We would also monitor the output power stability over one night. Then we repackage and ship the laser.”
|
|
12046
|
Thu Mar 24 08:20:52 2016 |
Steve | Update | PEM | Guralp-A calibration sheet |
All Guralp instruments and digitisers are provided with calibration documentation. Should you require a copy of calibration information for any product, email caldoc@guralp.com with the serial number of the product in the subject field and calibration information will be sent to you through email.
See data in the 40m wiki
|
12050
|
Mon Mar 28 08:30:09 2016 |
Steve | Update | SUS | PRM damping restored |
Recent EQ 4.8 mag San Felipe, Mexico trips PRM sus damping.
PRM damping restored. PMC locked. |
12051
|
Mon Mar 28 10:43:18 2016 |
Steve | Update | endtable upgrade | ETMX 4'x2' optical table pictures |
|
12057
|
Thu Mar 31 09:38:41 2016 |
Steve | Update | endtable upgrade | Y end 4x3 existing layout |
Beam colors: 1064 nm red, 514 nm green and 633 nm yellow.
There should be room for lens in front of the pd at red3 and a mirror for alignment in the new layout.
This picture may help you how to improve the new ETMX 4' x 3' optical layout.
|
12062
|
Tue Apr 5 08:55:51 2016 |
Steve | Update | SUS | local EQ 3.1m |
Local earth quake 3.1 magnitude in Valencia, Ca did not trip our suspensions.
|
12067
|
Thu Apr 7 14:30:58 2016 |
Steve | Update | endtable upgrade | ETMX table height |
Quote: |
Steve has finished installing the enclosure on the new endtable. So Eric and I decided to try and lock the X arm and measure the beam height of the transmitted IR beam relative to the endtable. We initially thought of using POX DC as a the LSC trigger but this did not work as there was no significant change in it when the arm was flashing. Eric then tried misaligning the ITM and using AS110 as a trigger - this worked. We then recompiled the ASS model to take AS110 as an input, and ran the dither alignment. After doing so, I measured the beam height at two points on the new endtable.
Bottom line:
- The beam is roughly level across the table (along the North-South direction, within the precision to which I could place the irides and measure the height). The table has also been levelled pretty well...
- The beam height is ~4.7" across the endtable
So the beam is about 0.7" higher relative to the endtable than we'd like it to be. What do we do about this?
- Is it even possible to raise the table by 0.7" so we can have a level beam everywhere? Are there some constraints related to how the enclosure is attached to the window?
- Are we okay with tolerating a solution where we keep the beam level at 4", and use Y10 and Y11 (see layout in elog 12060) to raise the beam by 0.7", and then have slightly higher posts for the optics downstream of this point?
I've also placed two irides extending the cavity axis on the endtable. These should be helpful in aligning the green to the arm eventually.
|
The new TMC 4' x 3' x4" optical table and enclosure is installed - aligned- leveled.
Atm2, Picture is taken ~42" from the window at 3.75 camera height. The leveled table height is wthin 1/4 at the center of the window.
I think this is close enough to move on with the installation of the optics.
We can raise the loaded table in the future if it is needed.
Atm4, Optical table height to floor 33" at the south west corner
Atm3, Enclosure top cover transmission at 1064 nm, 1mm beam size, power level 157 mW, 0 degree incident angle, T 1.3% Metal shield is required above 100 mW hitting the wall of the enclosure!
Atm5, window to enclosure Kapton seal |
12068
|
Fri Apr 8 09:13:20 2016 |
Steve | Update | endtable upgrade | ETMX-T beam height |
X arm resonating after alignment, beam height on ETMX optical table ~4.75"
|
12070
|
Mon Apr 11 17:03:41 2016 |
Steve | Update | Calibration-Repair | 1W Innolight repair completed |
The laser is back. Test report is in the 40m wiki as New Pump Diode Mephisto 1000
It will go on the PSL table. |
12071
|
Tue Apr 12 09:14:57 2016 |
Steve | Update | SUS | Ruby wire - v - groove cut pictures |
The ruby wire standoff V groove cuts are looking good.
I will request free sample of sapphire prizm where one side would have SOS's R cylindrical surface.
The present plan to have the v-groove on this prism.
|
12074
|
Wed Apr 13 11:00:28 2016 |
Steve | Update | endtable upgrade | X endtable repopulation |
ETMX optical table is grounded to ETMX chamber through 1 Mohms
The doubling oven temp controller is installed to reach its cable.
|
12082
|
Tue Apr 19 10:58:53 2016 |
Steve | Update | safety | safety scans at PSL & tables |
The PSL had one 1064 nm beam to be blocked around the north east side. The end enclosures are fine.
|
12084
|
Wed Apr 20 14:36:45 2016 |
Steve | Update | PEM | dusty lab |
It is worth wiping table top covers. Use isopropanol soaked lint free wipes.
|
12086
|
Thu Apr 21 15:12:38 2016 |
Steve | Update | VAC | RGA is not working |
Quote: |
Steve pointed out that in the aftermath of the Nitrogen running out a couple of times last week, the RGA had shut itself off thinking that there was a leak and so it was not performing the scheduled scans once a day. So the data files from the scheduled scans were empty in the /opt/rtcds/caltech/c1/scripts/RGA/logs directory. The wiki page for getting it up and running again is up-to-date, but the script RGAset.py did not exist on the c0rga machine, which the RGA is communicating with via serial port. I copied over the script RGAset.py from rossa to c0rga and ran the script on that machine - but the error flags it returned were not all 0 (indicating some error according to the manual) - so I edited the script to send just the initialize command ('IN0') and commented out the other commands, after which I got error flags which were all 0. After this, I ran a manual scan using 'RGAlogger.py', and it appears that the RGA is now able to take scans again - I'm attaching a plot of the scan results. We've saved this scan as a reference to compare against after a few days.
|
Our last RGA scan is from February 14, 2016 We had a power outage on the 15th
Gautom has not succeded reseting it. The old c0rga computer looks dead. Q may resurrect it, if he can? |
12087
|
Fri Apr 22 13:58:13 2016 |
Steve | Update | PEM | leaky roof is fixed |
Dan sealed the leak today.
|
12088
|
Mon Apr 25 11:07:06 2016 |
Steve | Update | SUS | spare SOS tower |
Earth quake stops need viton tips.
Wirestandoffs are still aluminum. |
12089
|
Tue Apr 26 15:22:35 2016 |
Steve | Update | endtable upgrade | Cleaning ETMX vacuum dirty window |
Gautom is progressing with the layout nicely. The X-arm transmission window have not seen cleaning for decades. This should be the time to do it. Here is picture of dirtiness.
It is not that simple... How much effort should we put in it? The hole table with 1W inno laser plus... set up now about ~500 lbs We can pull it off carefully, but it is not risk free.
We should look at our other signal port windows! Gautom's long reach able him to do the first contact cleaning without moving anything. It is great!
|
12091
|
Wed Apr 27 09:05:10 2016 |
Steve | Update | General | AP viewport |
Sad situation
The anti-symmetric port
spider webs fly in the wind |
12094
|
Wed Apr 27 15:04:47 2016 |
Steve | Update | endtable upgrade | Cleaning ETMX vacuum dirty window |
It looks very promising.
|
12096
|
Thu Apr 28 08:49:47 2016 |
Steve | Update | PEM | possible noise sources schedule |
Building: Campus (see attached Map)
Date: Manhole 1 - May 3 through May 5
Manhole 2 – May 6 through May 10
Manhole 2 - May 16 through May 19
Manhole 3 – May 11 through May 19
Time: Noise: 7:00 a.m. To 5:00 p.m.
Access: 24 Hours a day
Interruption: Noise/Vehicular & Pedestrian Access
Storm Drain Manholes
*In order to repair 3 manholes associated with a large storm drain that runs north-south through the campus, work will take place at the
3 manholes shown on the map. This work will interrupt vehicular and pedestrian access on the paths adjacent to the manholes. Though the work at Manholes 1 and 2 will allow vehicular and pedestrian access around the manholes, the work at Manhole 3 will completely block the driveway running south from the southeast corner of Parking Lot 11. Noise will also be created by the repair
|
12117
|
Sun May 15 19:48:08 2016 |
Steve | Update | VAC | run out of N2 |
3-4 hrs ago we run out of nitrogen. We are back to Vacuum Normal
|
12119
|
Tue May 17 14:46:51 2016 |
Steve | Update | VAC | RGA scan at day 595 |
We have good RGA scan now. There was no scan for 3 months. |
12122
|
Thu May 19 16:29:20 2016 |
Steve | Update | endtable upgrade | Optical layout almost complete |
|
12133
|
Wed May 25 08:32:55 2016 |
Steve | Update | SUS | local EQ 3.5m |
Local EQ 3.5 mag at 2:28 UTC May 24, 2016 Rancho Cucamonga, Ca.....no damage
|