  8350   Tue Mar 26 08:50:02 2013 SteveUpdateGeneraljanitor dayKeven, our janitor accidentally pushed
the main entry door laser emergency stop
switch.
  
  8351   Tue Mar 26 11:08:03 2013 JenneUpdateLockingPRMI locking should be possible - let's get it done![Jenne, Gabriele, Jamie]
We have looked at Koji's old Finesse
code, and determined that the PRMI sensing
 PRMI_SBres_plot_allTheFs_LowRes.pngLSC_sigmatrix_PRMI.pdf 
  8352   Tue Mar 26 11:33:55 2013 JamieUpdateOpticsHOWTO calculate effective RoC of flipped TTIn case anyone is curious how I got the
numbers for the effective radius of curvature
of the flipped TT mirrors, I include the
 mirror.mtransmission.mTTflipped.mM2Reff.m 
  8353   Tue Mar 26 15:00:55 2013 ManasaUpdateIOOTuning MC length/FSR

    

       
            
 MC_spectrum.pngMC_spectrum.zip 
  8354   Tue Mar 26 15:43:45 2013 ranaUpdateIOOTuning MC length/FSR  Please attach
the data file of the measurement
  
  8355   Tue Mar 26 16:10:31 2013 JamieUpdate40m UpgradingETMY table levelingSteve's suggestion for how to level the
end table using "swivel leveling mounts":
 end-tabel-leveling.png 
  8356   Tue Mar 26 16:36:24 2013 SteveUpdate40m Upgrading table leveling mounts go here

    

       
            
 optabSTAND.PDFswivvelMountEE.jpg 
  8357   Tue Mar 26 17:27:17 2013 KojiUpdateIOOTuning MC length/FSRPlease add the discussions on the cavity
absolute length (and its change, adjustment
precision),
  
  8358   Tue Mar 26 17:32:30 2013 ChloeUpdate QPD/ECDL ProgressI built the summing/subtracting circuit
on the breadboard, and hooked this up with
one of the other QPDs I found (image of setup
 IMG-20130326-00245.jpg 
  8359   Tue Mar 26 20:20:10 2013 CharlesUpdateISSISS Design Plans - Servo Noise AnalysisIn order to allow other individuals besides
myself to consider the proposed design of
the ISS, I have created a publicly available
 ISS.pdf 
  8360   Wed Mar 27 15:46:13 2013 JenneUpdateLockingPRMI progress[Gabriele, Jenne]
We have achieved PRMI locks of the
order ~5 seconds! Here is an example lock:
 PRMI_sb_27Mar2013.png 
  8361   Wed Mar 27 21:53:21 2013 AnnalisaUpdateABSLBeat note of ATF auxiliary laserAfter measuring the beat note, the "Alberto"
NPRO auxiliary laser has been moved from
the PSL table to the POY table. Its beam
  
  8362   Thu Mar 28 00:31:11 2013 JenneUpdateSUSPRMI optics' oplev servos tuned[Rana, Gabriele, Jenne, Jamie, Lisa, Rana]
We have tuned the oplev servos for
PRM, BS, ITMX, ITMY.  For each, we measured
 8x 
  8363   Thu Mar 28 01:59:33 2013 JenneUpdateLockingPRMI progress - even better![Gabriele, Rana, Jenne, Jamie, Lisa, Zach]
We
tweaked some things after dinner, and our
  
  8364   Thu Mar 28 04:21:40 2013 ranaUpdateLockingPRMI progress - even better! 
 A key step was turning off
the whitening filters. With the previous
  
  8365   Thu Mar 28 07:58:15 2013 SteveUpdateGreen LockingNPRO repair

    

       
            
  
  8366   Thu Mar 28 10:44:30 2013 ManasaUpdateComputersc1lsc downc1lsc was down this morning.
I restarted fb and c1lsc based on
elog
 cds_FE.pngcds_fe1.png 
  8367   Thu Mar 28 12:50:52 2013 JenneUpdateComputersc1lsc is fine Manasa told me that she   
  8368   Thu Mar 28 19:32:22 2013 AnnalisaSummaryAuxiliary lockingBeat note found! 
 I plot the variation of the
beat note frequency as a function of "Alberto"
 BeatFreq.jpg 
  8369   Thu Mar 28 23:00:30 2013 AnnalisaUpdateABSLBeat note of ATF auxiliary laser found 
The beat note for the ATF lab laser
has been found. 
  
  8370   Thu Mar 28 23:06:48 2013 AnnalisaUpdateAuxiliary locking"Alberto" NPRO laser again on PSL table "Alberto"NPRO laser has
been moved again on PSL table in order to
make a measurement of the beat note varying
  
  8371   Fri Mar 29 00:27:06 2013 ManasaUpdate40m UpgradingEndtable upgrade for auxiliary green laser : AssemblyI am currently putting together all components
so that they are ready to go on the table
once leveling and installation of shield
 IMG_0433.JPGIMG_0434.JPG 
  8372   Fri Mar 29 16:30:27 2013 SteveUpdate40m Upgrading table leveling mounts go here

    

       
            
  
  8373   Fri Mar 29 16:35:54 2013 SteveUpdate40m UpgradingEndtable upgrade 
 My full effort to get the optical
table enclosure ready for the lab has failed
  
  8374   Fri Mar 29 17:24:43 2013 JamieUpdateComputersFB RAID power supply replacedSteve ordered a replacement power supply
for the FB JetStor power supply that failed
a couple weeks ago.  I just installed
  
  8375   Fri Mar 29 19:23:49 2013 Gabriele, JenneFrogsLSCAnalog whitening filter of REFL55 not switchingWe discovered that the analog whitening
filter of the REFL55_I board is not switching
when we operate the button on the user interface.
  
  8376   Fri Mar 29 19:56:02 2013 GabrieleMetaphysicsLSCLock of PRMI on sidebandsI finally managed to get long stretches
of PRMI lock, up to many minutes. The lock
is not yest very stable, it seems to me that
 lock_prmi5.pdflock_prmi6.pdflock_prmi7.pdfoscillation.pdflock_prmi8.pdf 
  8377   Fri Mar 29 19:58:24 2013 Gabriele, JenneFrogsLSCAnalog whitening filter of REFL55 not switching

    

       
            
  
  8378   Sun Mar 31 17:26:32 2013 ranaUpdateLSCLock of PRMI on sidebands 
 Our first move has to be fixing
the whitening switching for REFL55. That's
  
  8379   Mon Apr 1 09:05:09 2013 Jenne, GabrieleConfigurationLSCPOP22 configurationOn Friday we modified the POP22 set up:
now the PD output goes to a bias tee. The
DC output goes to the ADC board, while the
  
  8380   Mon Apr 1 09:25:35 2013 JenneMetaphysicsLSCLock of PRMI on sidebands[Gabriele, Jenne]
I put a notch in FM10 for both MICH
and PRCL at 628Hz, to try to prevent us from
  
  8381   Mon Apr 1 16:13:50 2013 ChloeUpdate QPDBecause we would like to get started on
testing mount vibrations as soon as possible,
I've been trying to get one of the other
  
  8382   Mon Apr 1 16:16:16 2013 AlbertUpdateoptical tablesOptical Table Toolboxes UpdateA heavy duty plastic box is the likeliest
candidate for the optical table toolbox.
It measures 5 9/16 in. x 11 5/8 in. x 4 5/8
  
  8383   Mon Apr 1 16:24:09 2013 JamieFrogsLSCPD whitening switching fixed (loose connection at break-out box)

    

       
            
 20130401_161858.jpg20130401_161917.jpg 
  8384   Mon Apr 1 16:35:42 2013 AlbertUpdateoptical tablesOptical Table Toolboxes Update

    

       
            
  
  8385   Mon Apr 1 17:59:04 2013 JenneUpdateLockingPRMI videos[Gabriele's work, I'm just spectating]
Annalisa is working on finding the
PSL/AUX laser beatnote, so the PSL temp is
  
  8386   Mon Apr 1 23:22:17 2013 AnnalisaUpdateAuxiliary lockingBeat note between "Alberto" NPRO laser and PSL laserI measured the beat note between the "Alberto"
NPRO laser and the PSL varying the PSL temperature
and find the matching NPRO temperature that
 Beat_Note.jpg 
  8387   Tue Apr 2 10:22:37 2013 Rana, Gabriele, JenneUpdateLSCPRMI lockWe locked the PRMI, this time really on
the sidebands, using the two REFL55 signals.
Here are the parameters: triggering
 lock_prmi_sb.pdf 
  8388   Tue Apr 2 11:08:16 2013 KojiUpdateLSCPRMI lock> The two REFL55 signals
Wow! It's a good news.
I think this is our first ever lock
  
  8389   Tue Apr 2 15:58:40 2013 JenneUpdateSUSoplev calibration for ITMX, BS[Jenne, Gabriele]
Optical lever calibrations:
ITMX pit calibration = -9.07 cts/mrad
 opl_itmx.pngopl_bs.png 
  8390   Tue Apr 2 16:13:10 2013 ranaUpdateSUSoplev calibration for ITMX, BS    
  8391   Tue Apr 2 16:55:34 2013 JenneUpdateSUSoplev calibration online for ITMs, BS, PRM[Jenne, Gabriele]
We have put in a new EPICS input
into the SUS library part, just before the
 comparison_opl.pdf 
  8392   Tue Apr 2 17:23:23 2013 SteveUpdate40m Upgradingnew ETMY optical table & enclosure in place Enclosure is at the east end. It
has it's bottom o-ring in place. It will
be ready for optics tomorrow around 5pm
 EEopt1d.jpg 
  8393   Tue Apr 2 18:19:30 2013 JenneUpdateSUSBS, PRM oplev servos improved 
[Gabriele, Jenne]
We have implemented 4Hz resonant
 PRM_servo_matches_BS.pdfprm_bs_optical_levers_comparison.pdf 
  8394   Tue Apr 2 20:52:35 2013 ranaUpdateComputersiMac bashed I changed the default   
  8395   Tue Apr 2 21:11:42 2013 RanaUpdateoptical tablesOptical Table Toolboxes Update

    

       
            
  
  8396   Tue Apr 2 22:39:17 2013 AnnalisaUpdateAuxiliary lockingBeat note between "Alberto" NPRO laser and PSL laser 
 The beat note between the PSL
laser and the "Alberto" NPRO laser
 Beat_note_3col.jpg 
  8397   Tue Apr 2 23:14:02 2013 ranaUpdateLSC22/110MHz path for POP

    

       
            
  
  8398   Wed Apr 3 01:32:04 2013 JenneUpdateComputersupdated EPICS database (channels selected for saving)I modified /opt/rtcds/caltech/c1/chans/daq/C0EDCU.ini
to include the C1:LSC-DegreeOfFreedom_TRIG_MON
channels.  These are the same channel
  
  8399   Wed Apr 3 03:18:23 2013 JenneUpdateLockingPRMI locked with REFL55 I&Q for more than 1 minute[Rana, Gabriele, Jenne]
We have