  8711   Mon Jun 17 16:34:15 2013 JenneUpdateLSCSensing Matrix vs. Schnupp AsymmetryI have made some plots of the sensing matrix
(PRCL / MICH amplitude ratio, and relative
angle) versus Schnupp asymmetry for all the
 10x 
  8710   Fri Jun 14 17:54:11 2013 JenneUpdateASCNew POP path - cabling work

    

       
            
  
  8709   Fri Jun 14 17:15:45 2013 ManasaUpdateGreen Lockingc1als model editedI have edited the daq channels in c1als
model.
Added: DQ channels for the error
  
  8708   Fri Jun 14 07:06:19 2013 KojiSummaryGreen LockingX arm ALSIt's nice that we are now able to scan
the cavity again. We got close to PRMI+one
arm one step further.
  
  8707   Fri Jun 14 03:10:40 2013 JenneUpdateASCNew POP path - PDs in place, need cablingI have placed the lenses and the PDs in
their new positions on the POP path. 
As Koji had pointed out to me in reply to
  
  8706   Fri Jun 14 02:38:07 2013 ranaUpdateLSCNew modeled sensing matrix This is nice - how about figuring
out how to plot the measurement and model
on the same plot? I guess we need to figure
  
  8705   Fri Jun 14 00:32:43 2013 JenneUpdateLSCNew modeled sensing matrixI put in a new version of the modelled
plot.  I figured out a different way
to keep things generic so the same script
 SensMatModel_13June2013_currentPRMIfreq.pngSensMatModel_13June2013_idealPRMIfreq.png 
  8704   Thu Jun 13 23:28:40 2013 AnnalisaUpdateGreen LockingY arm locked with green but bad mode matching

    

       
            
  
  8703   Thu Jun 13 22:31:12 2013 ManasaSummaryGreen LockingX arm ALSStabilized ALS
and beat frequency sweep realized.
 IMG_0659.JPGALS_stabilized_13June2013.png 
  8702   Thu Jun 13 16:13:08 2013 nicolasUpdateLSCNew modeled sensing matrixI'd repeat the measurement for REFL11.
The PRC arrow has some big error bar on it,
and maybe the true error is even bigger.
  
  8701   Thu Jun 13 16:01:48 2013 nicolasUpdateGreen LockingY arm locked with green but bad mode matching


   
        
            
  
  8700   Thu Jun 13 15:04:16 2013 JenneUpdateLSCNew modeled sensing matrixUsing all of the latest parameters that
I can find, I have re-modeled the 40m sensing
matrix.  Also, I have it output the
 SensMatMeas_23May2013.pngSensMatModel_13June2013.png 
  8699   Thu Jun 13 10:57:36 2013 AnnalisaUpdateGreen LockingY arm locked with green but bad mode matching> > Hmmm.  You seem to be saying that more
light is reflected than is injected. Is this
a units problem? Or was some IR on the power
  
  8698   Thu Jun 13 00:35:23 2013 ManasaUpdateGreen LockingY arm locked with green but bad mode matching> Hmmm.  You seem to be saying that more light
is reflected than is injected. Is this a
units problem? Or was some IR on the power
  
  8697   Wed Jun 12 23:06:33 2013 JenneUpdateGreen LockingY arm locked with green but bad mode matchingHmmm.  You seem to be saying that more light
is reflected than is injected. Is this a
units problem? Or was some IR on the power
  
  8696   Wed Jun 12 22:48:10 2013 AnnalisaUpdateGreen LockingY arm locked with green but bad mode matchingAfter restoring alignment I could see again
strong 00 flashes (about 250-300 counts on
ALS-TRY). So I locked the arm with IR and
  
  8695   Wed Jun 12 01:56:58 2013 AnnalisaUpdateGreen LockingY arm locked with green but bad mode matching 
 For the mode matching calculation
I was using the ETMY focal length that I
 waistVaryingLensPos.pdfgreen.JPGModeMatchingY.pdf 
  8694   Tue Jun 11 22:16:56 2013 ManasaSummaryGreen LockingALS for X armI discussed with Yuta about the ALS servo
and phase tracker and found that there was
a lot of information lying around from last
  
  8693   Tue Jun 11 10:00:54 2013 nicolasUpdateGreen LockingY arm locked with green but bad mode matching

    

       
            
  
  8692   Mon Jun 10 21:39:26 2013 AnnalisaUpdateGreen LockingY arm locked with green but bad mode matching 
Still no good locking! 
  
  8691   Sat Jun 8 00:24:11 2013 AnnalisaUpdateGreen LockingY arm locked with green but bad mode matching[Annalisa, Nic]
After connecting the PD with the
reflection from the arm  to the PDH
  
  8690   Fri Jun 7 23:44:54 2013 KojiUpdateGeneralProjector - lightbulb replacedhttp://nodus.ligo.caltech.edu:8080/40m/7885   
  8689   Fri Jun 7 21:33:39 2013 ManasaUpdatePSLPSL green to Y- BEAT PD blockedTo allow Annalisa to work on the Y-green
alignment as I work with the X-green, the
part of the PSL green beam that goes to the
  
  8688   Fri Jun 7 17:12:46 2013 gautamUpdateGeneralProjector - lightbulb replaced

    

       
            
  
  8687   Thu Jun 6 16:33:19 2013 steveUpdatesafetyupdated laser inventory Updated laser inventory and operator
list. They are posted in the 40m wiki and
entry doors of the 40m IFO room.
 ELSOconnected.jpg 
  8686   Thu Jun 6 15:46:10 2013 Max HortonSummaryGeneral Smart UPS 2200 Batteries ReplacedReplaced the batteries successfully in
the control room.  We just had to switch
the clips from the old batteries to the new
  
  8685   Thu Jun 6 09:58:13 2013 SteveUpdateendtable upgradeenclosure to chamber connection 
 Thin
wall connector from McMCarr#55275K25
 thinwallconnector.jpg06061301.PDF 
  8684   Wed Jun 5 20:45:19 2013 gautamUpdateGeneralITMx Oplev Fixed

    

       
            
 ITMx_overview.JPGITMx_clipping_.JPG 
  8683   Wed Jun 5 17:37:10 2013 ranaUpdateGeneralfast 2004 qpd

    

       
            
  
  8682   Wed Jun 5 15:55:16 2013 SteveUpdateGeneralProjector - lightbulb ordered

    

       
            
  
  8681   Wed Jun 5 15:48:02 2013 SteveUpdateGeneralfast 2004 qpdThank you Ben Abbott forwarding this information:
 QPD Amplifier
 D990272qpd.jpginterfaceD990692.jpg 
  8680   Wed Jun 5 15:03:42 2013 AnnalisaUpdateLSCC1:ALS-TRY_OUT filter and green progress

    

       
            
 faraday_rejected_beam.JPG 
  8679   Wed Jun 5 14:43:42 2013 AnnalisaUpdateLSCALS-TRY_OUT DQ channels

    

       
            
  
  8678   Wed Jun 5 14:39:41 2013 Max HortonUpdate Importing New CodeMost dependencies are met.  The next
issue is that matplotlib.basemap is not installed,
because it is not available for our version
  
  8677   Wed Jun 5 14:01:37 2013 ranaUpdateLSCC1:ALS-TRY_OUT filter and green progressThe rejected beam from this Faraday comes
out at a tiny, tiny angle and so its tough
to pick it off without clipping the main
  
  8676   Wed Jun 5 10:46:43 2013 GautamUpdateGeneralCable re-routing at 1Y4 There were 4 cables running over
the front side of rack 1Y4 such that the
front door could not be closed. I re-routed
 before.JPGafter.JPG 
  8675   Wed Jun 5 10:22:12 2013 ManasaUpdateGeneralProjector - viewsonicUpdate: We don't have our BIG screen    
  8674   Tue Jun 4 21:50:23 2013 AnnalisaUpdateLSCC1:ALS-TRY_OUT filter and green progress 
 [Annalisa, Gautam]
 The green beam alignment has
  
  8673   Tue Jun 4 20:19:07 2013 ranaConfigurationIOOChanged threshold for FSS SLOW loopThe FSS SLOW actuator often   
  8672   Tue Jun 4 17:28:09 2013 AnnalisaUpdateLSCC1:ALS-TRY_OUT filter and green progress [Annalisa, Gautam, Rana]
I made the anti-whitening filter
for the C1:ALS-TRY_OUT channel.
 green.JPGQUAD1_1054358327.mp4 
  8671   Tue Jun 4 16:04:34 2013 AnnalisaUpdateLSCALS-TRY_OUT needs anti-whitening

    

       
            
  
  8670   Tue Jun 4 10:47:57 2013 SteveUpdatesafetysafety trainingOur early bird surf student Gautem has
received 40m specific basic safety training
today.
  
  8669   Tue Jun 4 10:44:13 2013 SteveUpdateendtable upgradePI pzt holders are readyThe PI pzt holders are back from the shop.
They are numbered 1, 2 & 3 and machined
to match.
 PIpztholders.jpg 
  8668   Tue Jun 4 10:33:09 2013 ranaUpdateSUSETMY oplev path redone We also redid
the oplev path.
Someone
had used the illegal tactic of using aluminum
  
  8667   Mon Jun 3 22:36:07 2013 ranaUpdateLSCALS-TRY_OUT needs anti-whitening After
working some more on the EY table, we are
 try.pdf 
  8666   Mon Jun 3 21:09:55 2013 ManasaUpdateGreen LockingX green beatnote through beatboxI connected the X green beat PD output
back to the beatbox, did the usual PSL alignment
for green and searched for the beat note
 IMG_0608.JPG 
  8665   Mon Jun 3 18:49:44 2013 GautamUpdateGeneralITMx Oplev Fixed  (Manasa)
The ITMx Oplev was misaligned. Switched
the ITMx Oplev back on and fixed the alignment.
  
  8664   Mon Jun 3 09:46:40 2013 SteveUpdateVACRGA scan at day 100 Vacuum normal condition at pumdown
day 100
 
 d100Mpd75.pngd100Mpd75p.pngbadguys.png 
  8663   Sat Jun 1 14:14:56 2013 JenneUpdateASCNew POP pathI have a lens solution for the new POP
QPD, plotted below.  To get the beam
size, I started with the waist at the ITM,
 POX_table_30May2013progress.pdfPOP_QPD_lensSolution.png 
  8662   Fri May 31 11:15:01 2013 AnnalisaUpdateendtable upgradeETMY - Mode Matching for green - new calculation Since the beam waist after the Faraday