  9012   Thu Aug 15 01:51:50 2013 KojiSummaryGeneralRFM<->Dolphin bridge distributed to c1rfm and c1mcsSince the RFM-Dolphin bridges for the ASX
model was added to the c1rfm model, c1rfm
kept timing-out from the single sample time
  
  9011   Wed Aug 14 08:24:20 2013 SteveUpdateVACpumpdown at day 8 
 
 pd76md8.png 
  9010   Tue Aug 13 22:21:12 2013 KojiSummaryGeneralMinicircuit Filter TFs (AG4395A test)As a part of the network analyzer test
in the previous entry, the transfer functions
of Mini-Circuits filters we have at the 40m
 Minicircuit_LPF.pdfMinicircuit_BPF.pdfMinicircuit_HPF.pdf130813.zip 
  9009   Tue Aug 13 21:49:32 2013 KojiSummaryGeneralTesting new AG4395A network analyzerNew AG4395, sn MY41101114  for West
Bridge Labs was delivered. For the test purpose
it is at the 40m now.
 AG4395A_noise.pdf 
  9008   Tue Aug 13 21:09:03 2013 manasaUpdateGreen LockingArms ready for ALSI aligned
both the X and Y end green to the arms.
The transmitted green were aligned
  
  9007   Tue Aug 13 17:20:54 2013 KojiUpdateCDS[Fixed] c1iscex needs helpc1x01 timing issue was solved. Now all
of the models on c1iscex are nicely running.
Symptons
  
  9006   Tue Aug 13 13:30:41 2013 Alex ColeConfigurationElectronicsCable Routing I routed cables (RG405 SMA-SMA) from
several demodulator boards in rack 1Y2 to
the RF Switch in rack 1Y1 using the overhead
 photo_(6).JPG 
  9005   Tue Aug 13 11:54:40 2013 Alex ColeHowToElectronicsRF PD Fiber-Coupled Laser OperationThis post pertains to the fiber-coupled
diode laser mounted in rack 1Y1.
To turn the laser on, first turn
 photo_(4).pdf 
  9004   Tue Aug 13 11:40:19 2013 Alex ColeSummaryElectronicsRFPD Demod Filter Frequency Response Measurement For the RF PD Frequency Response
Measurement project, we get each PD signal
from the "PD RF Mon" output of
 photo_(3).JPGtest.jpg 
  9003   Tue Aug 13 11:04:44 2013 SteveUpdatePEMfluorecent lightsOur fluorecent
lights became obsolete.  We'll have
change fixtures over to some more energy
  
  9002   Tue Aug 13 07:40:53 2013 SteveUpdateCDSc1iscex needs help 
 Sorrensen ps ouput of +15V
at rack 1X9 was current limited to 10.3V
 c1iscexSick.png 
  9001   Mon Aug 12 23:13:14 2013 JenneUpdateASCPRCL ASS software in place

    

       
            
  
  9000   Mon Aug 12 21:27:03 2013 manasaUpdateCDSc1iscex needs helpI started to modify the c1asx model to
reduce the RFM model from hitting its max
time.
  
  8999   Mon Aug 12 17:30:03 2013 KojiUpdateASCPRCL ASS software in placeWhy POPDC???   
  8998   Mon Aug 12 15:39:40 2013 JenneUpdateASCPRCL ASS screens in placeI have added the PRCL ASS to the main ASS
screen, and created the servo and lockin
screens.  The filters loaded are the
  
  8997   Mon Aug 12 14:05:34 2013 JenneUpdateASCPRCL ASS software in place

    

       
            
  
  8996   Mon Aug 12 13:30:33 2013 JamieUpdateCDSX-End Green ASS - Roundup

    

       
            
  
  8995   Mon Aug 12 12:57:59 2013 JenneUpdateCDSX-End Green ASS - Roundup

    

       
            
  
  8994   Mon Aug 12 10:44:22 2013 ranaUpdateLSCPRMI(sb) lock recovered  In the past, we used to use
Stefan's 'ezcademod' or Matt's 'ezlockin'
to do auto phase adjustment.
  
  8993   Sat Aug 10 05:53:51 2013 gautamUpdateCDSX-End Green ASS - RoundupOver
the last three days, I've had the interferometer
to test and optimize the ASX Servo. Based
 New_ASX_MEDM_MAIN.pdf 
  8992   Fri Aug 9 22:51:37 2013 KojiUpdateLSCPRMI(sb) lock recoveredPRMI(sb) lock
was recovered
  
  8991   Fri Aug 9 21:05:28 2013 KojiUpdateSUSfixed: SRM coils fine - problem with slow bias sliderNow the SRM Yaw bias in yaw is functional
without any strage behavior.
  
  8990   Fri Aug 9 16:49:35 2013 Jenne, manasaUpdateElectronicsPost-vent alignment cont'd - RFPDsNotes to the fiber team:
I am aligning beam onto the RFPDs
(I have finished all 4 REFL diodes, and AS55),
  
  8989   Thu Aug 8 21:25:36 2013 KojiUpdateGeneralPost-vent alignment cont'd- IPANG aligned on the QPD. The beam seems
to be partially clipped in the chamber.
- Oplev of the IFO mirrors are aligned.
  
  8988   Thu Aug 8 18:47:41 2013 SujanSummaryPEMUsing weiner filters for subtracting signals MC_L and GUR2_XI used MC_L signal from the Mode Cleaner
as the desired signal with  GUR2_X as witness
signals. I observed good subtraction where
 Results.zip 
  8987   Thu Aug 8 18:43:12 2013 SujanSummaryPEMOptimally subtracting signals from two seismometers.An exercise of optimally subtracting one
seismometer signal by  another using weiner
filters was done. Results have been summarized
 Results.pdf 
  8986   Thu Aug 8 11:18:46 2013 manasaUpdateComputer Scripts / ProgramsUnused scripts in ASS movedI was receiving missing path error when
I was trying to measure the MC spot positions.
Jenne pointed out that Koji had moved all
  
  8985   Thu Aug 8 10:31:28 2013 SteveUpdateVACfew reminders of this vent 1, Vacuum envelope grounds must be
connected all times!  After door removal
reconnect both cables immediately.
 GROUND!.jpgbad_Folding.jpgtoomuchred.jpgBETTERholder.jpg 
  8984   Thu Aug 8 07:57:23 2013 SteveUpdateVACpumpdown at 48 hrs

    

       
            
 48hrsPd76.png 
  8983   Wed Aug 7 23:40:49 2013 gautamUpdateCDSX-End Green ASS - A first update I
have done some preliminary testing of the
X-End Green ASS Servo. I will write a more
 time-series.pdf 
  8982   Wed Aug 7 22:18:43 2013 KojiUpdateASCASS updateWhile Gautam is working on the Xarm green
ASS...
The EPICS monitor points for the
 Screenshot-Untitled_Window.png 
  8981   Wed Aug 7 21:52:11 2013 JenneUpdateSUSSRM coils fine - problem with slow bias slider[Koji, Jenne]
We have looked a little more at the
SRM situation.  We aligned the SRM,
  
  8980   Wed Aug 7 19:16:20 2013 JenneUpdateASCASS setting up accelerated moreI have furthered Koji's work, and moved
the filter on/off state for all the filter
banks also to the burt snapshot.  
  
  8979   Wed Aug 7 15:51:53 2013 Alex ColeConfigurationElectronicsRF Switch ChangeFor the photodetector frequency response
project, our new RF Switch Chassis (NI pxie-1071)
arrived today. I took the switches out of
 photo_(2).JPG 
  8978   Wed Aug 7 15:36:29 2013 SteveUpdateVACTP2 drypump replaced 
 TP2's fore line - dry pump
replaced at performance level 600 mTorr after
 forelinesPs.jpg 
  8977   Wed Aug 7 15:32:37 2013 KojiUpdateASCASS setting up accelerated (slightly)I moved bunch of ezcawrite from the ASS
Dither On script to a snapshot file.
This accelerated a half of the "up"
  
  8976   Wed Aug 7 10:51:49 2013 SteveUpdateVACPumpdown at 26hrs Cold cathode gauge CC1 -h (horizontal)
just coming on 9.2e-5 Torr
P2 is the fore line pressure of the
 26hr.png14datm.png 
  8975   Wed Aug 7 10:09:30 2013 KojiUpdateLSCArms locked in IR, aligned. IFO at nominal powerI have a concern about the SRM suspension.
The yaw alignment bias produces huge pitch
coupling.
  
  8974   Tue Aug 6 19:53:15 2013 JenneUpdateLSCArms locked in IR, aligned. IFO at nominal power[Koji, Manasa, Jenne]
The Y arm was locked in IR, and we
saw flashing in the Xarm (Gautam had the
  
  8973   Tue Aug 6 16:45:31 2013 SteveUpdateVACPumpdown is completed IFO  P1=1mT PSL shutter is opened
 
 8hrPd76.png1mT.png 
  8972   Tue Aug 6 16:36:51 2013 gautamUpdateCDSChoosing LO Amplitudes and Frequencies-revisedI redid
the power spectrum measurement for the X-arm
green transmission after aligning the arm
 powerSpec0806.pdf 
  8971   Tue Aug 6 12:43:23 2013 Alex ColeConfigurationElectronicsAS Table and Rack 1Y1 AdditionsFor the photodetector frequency response
project, I finished the construction of our
baluns chassis and mounted it in rack 1Y1
 photo_1_(5).JPGphoto_2_(5).JPG 
  8970   Tue Aug 6 10:06:29 2013 SteveUpdateVACPumpdown is at 500Torr The pumpdown has started at 8:38am
Manasa was here to confirm good alignment
of the IFO
 befPd.png 
  8969   Tue Aug 6 07:52:58 2013 manasaUpdateGeneralReady to pump downI did an alignment check of the IFO before
we start pumping down.
Arms were locked. PRM and SRM were
 MCspot_0806.pngOSEM_0806.pngOL_0806.pngQPD_0806.png 
  8968   Mon Aug 5 19:10:01 2013 KojiUpdateCDSChoosing LO Amplitudes and Frequencies - I suppose the green transmission paths
were thoroughly inspected and aligned in
prior to the measurement
  
  8967   Mon Aug 5 18:48:44 2013 gautamConfigurationendtable upgradeFull range calibration of PZT mounted mirrors for Y-endtable I
had prepared two more PZT mounted mirrors
for the Y-end some time back. These are:
 2-inch-CVI-Yawcalib.pdf2-inch-CVI-Pitchcalib.pdf1-inch-Laseroptik-Yawcalib.pdf1-inch-Laseroptik-Pitchcalib.pdf 
  8966   Mon Aug 5 18:18:32 2013 gautamUpdateCDSChoosing LO Amplitudes and Frequencies In
order to decide what frequencies to dither
the 4 degrees of freedom (M1-pitch&yaw,
 GTR_Power_Spectrum.pdf 
  8965   Mon Aug 5 18:02:34 2013 manasaUpdateGeneralClose up list checked

    
    Center
  
  8964   Mon Aug 5 11:53:45 2013 EvanUpdateISSCTN Servo - Explicit Requirement and Proposed ServoI goofed on the transfer function requirement
by not giving you the plant transfer function,
which looks to be about 0.014 V/V,  independent
  
  8963   Mon Aug 5 10:50:48 2013 SteveUpdateVACRGA background RGA background at day 12 of this
vent . The maglev is pumping on the rga through
VM2
 v75bgMd12.png 