9129
|
Mon Sep 16 10:57:11 2013 |
Steve | Update | VAC | RGA scan at day 41 |
|
 |
9139
|
Wed Sep 18 14:57:12 2013 |
Steve | Update | VAC | vertex crane folding arm removed | The folding beam removed as shown.
Two man supporting it while I hammering it
out. Pin was dry and it gulled into supporting |
   |
9140
|
Thu Sep 19 10:24:58 2013 |
Steve | Update | PEM | PRM damping restored after earth quake | Local m3.8
eq shakes PRM lose. |
|
9144
|
Fri Sep 20 08:15:30 2013 |
Steve | Update | Computer Scripts / Programs | Ottavia, Rossa and Pianosa | Ottavia, Rossa and Pianosa are running
out of storage space. |
  |
9145
|
Fri Sep 20 09:49:06 2013 |
Steve | Update | SUS | Optical Lever Trend for 180 days: bad ETMY & PRM | I'm working on it. |
|
9146
|
Fri Sep 20 16:37:30 2013 |
Steve | Update | VAC | vertex crane folding arm is back on |
|
    |
9164
|
Thu Sep 26 10:55:29 2013 |
Steve | Update | General | Y-arm floor space for test | Liyuon will set up a ~5 mW He/Ne
laser for waist measurement |
|
9165
|
Thu Sep 26 11:00:51 2013 |
Steve | Update | SUS | Problems with ETMY Optical Lever | We are out of JDSU-Uniphase 1103P heads.
I'm ordering some right now. I'm planning
to make some corrections on Rana's list tomorrow |
|
9173
|
Mon Sep 30 08:53:22 2013 |
Steve | Update | VAC | vertex crane repair schedule has changed |
|
|
9180
|
Tue Oct 1 10:06:27 2013 |
Steve | Update | PEM | particle counts | How can we improve the |
 |
9185
|
Wed Oct 2 14:25:39 2013 |
Steve | Update | VAC | vertex crane is still out of order |
The smoke alarms were turned off
and surrounding areas were covered with plastic. |
  |
9196
|
Thu Oct 3 09:49:49 2013 |
Steve | Update | SUS | ETMY oplev laser is sick |
|
|
9212
|
Mon Oct 7 10:51:18 2013 |
Steve | Update | SUS | Replaced the laser for Optical Lever of ETMY | Just plot.
RA: I'm not |
 |
9220
|
Tue Oct 8 08:58:16 2013 |
Steve | Update | SUS | Oplev power spectrums |
|
  |
9221
|
Tue Oct 8 11:29:30 2013 |
Steve | Update | PEM | no Janitor day today | This was the second week without wet mopping
the floor and wet wipe down of the vacuum
envelope. |
|
9223
|
Wed Oct 9 11:48:10 2013 |
Steve | Update | VAC | RGA scan at day 65 |
Valve configuration: Vacuum
Normal |
 |
9224
|
Wed Oct 9 15:00:48 2013 |
Steve | Update | PEM | freshmen tour | [Alan, Koji, Manasa]
Record number of 50 freshmen were
given tour of the 40m this afternoon. |
|
9229
|
Thu Oct 10 08:25:07 2013 |
Steve | Update | safety | Chris received safety training | Chris Couste, our new undergrad help received
40m specific, basic safety training yesterday. |
|
9230
|
Thu Oct 10 11:30:15 2013 |
Steve | Update | SUS | Oplev power spectrums: PIT-YAW |
Power spetrum of ETMX and ETMY in
the view of oplev pitch and yaw. |
|
9241
|
Tue Oct 15 15:25:13 2013 |
Steve | Update | SUS | Oplev power spectrums bandwidths | Atm1 bandwidth 0.01 Hz ETMY plot
is different from |
 |
9246
|
Wed Oct 16 10:32:40 2013 |
Steve | Update | SUS | Flowbench effect on oplev error signals | ETMX _OPLEV_...ERROR signals are
effected by turning ON the |
|
9253
|
Fri Oct 18 08:12:08 2013 |
Steve | Update | PEM | 1000 days trends | |
|
9254
|
Fri Oct 18 15:18:49 2013 |
Steve | Update | PEM | particle count peak or ... | Sunday evening fireworks. Manasa heard
it. |
 |
9255
|
Mon Oct 21 09:46:12 2013 |
Steve | Update | PSL | Laser just turned on | I have just turned on the PSL Innolight
laser. The laser shut down with unknown
reason a day ago. |
|
9257
|
Tue Oct 22 10:12:33 2013 |
Steve | Update | PEM | south arm AC intake duct checked | The 4th week of no wet mopping
of the floor and no wet wiping
the vacuum envelope. |
  |
9262
|
Wed Oct 23 09:17:33 2013 |
Steve | Update | SUS | ETMY sensors compared to ETMX | ETMY sensors are glitching or getting
kicked up.
Atm3, There is no seismic activity |
   |
9275
|
Thu Oct 24 08:04:54 2013 |
Steve | Update | LSC | PRMI + 2 ALS arms |
Nice work. Congratulation |
|
9277
|
Thu Oct 24 10:31:25 2013 |
Steve | Update | SUS | ETMY sensors compared to ETMX | Atm1, The strong glitches are back.
Atm2, SUS-ETMX & Y_SENSOR_LL
Damping OFF at (ref0 & ref1). damping |
 |
9281
|
Thu Oct 24 17:18:44 2013 |
Steve | Update | SUS | ETMY oplev error signals are still bad |
|
|
9291
|
Fri Oct 25 10:45:16 2013 |
Steve | Update | PSL | laser drift monitor set up |
|
  |
9319
|
Wed Oct 30 14:58:44 2013 |
Steve | HowTo | General | shutting down a computer |
We have tried to ssh into c1iscey
yesterday morning. It just did not work. |
|
9325
|
Fri Nov 1 09:45:32 2013 |
Steve | Update | IOO | beam dumps to be find |
|
|
9333
|
Mon Nov 4 09:03:21 2013 |
Steve | Update | PSL | PMC auto locker |
|
|
9334
|
Mon Nov 4 11:37:12 2013 |
Steve | Update | IOO | PSL output shutter installed |
The PSL shutter is reinstalled.The
base plate is delrin for isolation and the |
|
9343
|
Tue Nov 5 08:44:21 2013 |
Steve | Update | IOO | after last steering mirror mount swap | The IOO Angle and IOO Position qpds
were recentered after this entry.
Suggested corrections in elog |
 |
9347
|
Tue Nov 5 17:12:34 2013 |
Steve | Update | LSC | centered qpds | Full list tomorrow: IP-Ang &
Pos, ETMY-T, ETMY-Oplev, ETMX-T, IOO-Ang
& Pos |
|
9352
|
Wed Nov 6 08:33:53 2013 |
Steve | Update | IOO | Poiting changes of PSL |
|
 |
9353
|
Wed Nov 6 14:47:41 2013 |
Steve | Frogs | LSC | Din connectors added at 1Y2 | The north side of the LSC rack is
full. I installed more DIN connectors with
fuses on the south side of the rack 1Y2 |
|
9358
|
Thu Nov 7 08:57:20 2013 |
Steve | Update | IOO | PSL pointing monitoring | The qpd sees the power drop as position
change.
The laser monitoring screen |
 |
9359
|
Thu Nov 7 11:19:04 2013 |
Steve | Update | VAC | crane work POSTPONED to Monday |
|
|
9372
|
Wed Nov 13 08:46:03 2013 |
Steve | Update | VAC | vertex crane repair completed |
|
|
9374
|
Wed Nov 13 11:30:07 2013 |
Steve | Update | PEM | particle counter MOVED | Particle counter moved from the top of IOOC
to the east wall |
|
9384
|
Thu Nov 14 11:41:19 2013 |
Steve | Update | SUS | PRM sensors effected by IR | IR off for 11 minutes. The PRM
face sensors are effected. The PRM side and
the rest of the SUS OSEMS are not effected. |
|
9386
|
Thu Nov 14 14:35:12 2013 |
Steve | Update | SUS | IR effect on MC and PRM sensors | Sorry to say but MC1, MC2, MC3 and
PRM face OSEMS are having the same problem
of leaking IR into the sensors |
|
9388
|
Fri Nov 15 08:01:20 2013 |
Steve | Update | SUS | ETMY damping restored | ETMY sus damping restored |
|
9389
|
Fri Nov 15 09:24:41 2013 |
Steve | Update | IOO | WFS with beam dumps | This is a proposal to move WFSs such way
that their reflected beam can be trapped.
Later ps: Nic will take care of the |
|
9392
|
Fri Nov 15 10:31:45 2013 |
Steve | Update | ISS | SR560 ISS loop connection |
|
|
9398
|
Mon Nov 18 16:39:38 2013 |
Steve | Update | SUS | PRM pictures | PRM is aligned. IFO is not locked. It is
just flashing, including arms. Olympus SP570UZ
camera used without IR blocker. Note: PRM |
  |
9408
|
Tue Nov 19 11:33:39 2013 |
Steve | Update | SUS | PRM- OSEM side ccd camera is in place |
|
 |
9421
|
Thu Nov 21 16:32:20 2013 |
Steve | Update | IOO | PMC needs a touch of love |
The PMC power degrading on
this 3 days plot. MC2 -T = 14,200 counts. |
|