  9115   Fri Sep 6 09:27:10 2013 SteveUpdateVAC31 days after pumpdown

    

       
            
 day31vac.png 
  9114   Thu Sep 5 21:07:09 2013 JenneUpdateLSCStarted work on logic for triggeringI want something like an "AND"
for the degree of freedom triggers. 
Koji and I talked through an idea, and I
  
  9113   Thu Sep 5 15:18:41 2013 JenneUpdateLSCFree swinging DRMI power buildupsI have the DRMI free swinging right now,
since it's not really locking.  Looking
at these time series in the attached pdf,
 DRMI_free_swing_power_buildups.pdf 
  9112   Thu Sep 5 11:19:33 2013 JenneUpdateSUSPRM side

    

       
            
  
  9111   Thu Sep 5 10:47:58 2013 SteveUpdateVACvertex crane folding issue 
 [Fred Goldbar, Mike Gerfen,
Dennis Coyne and Steve]
 5mmLess.jpg 
  9110   Thu Sep 5 10:28:17 2013 SteveUpdateSUSPRM side I think the crane repair guy accidentally 
stepped on the  BSC support beam.
PRM side is not coming down.
 craneguywashere.png 
  9109   Thu Sep 5 01:55:29 2013 JenneUpdateLSCLSC model upated to have AS110 channels, violin filter triggeringI have
modified the c1lsc model so that I have access
to the AS110 channels in the triggering and
  
  9108   Thu Sep 5 00:40:33 2013 ranaUpdateSUSMC2 tickler turned OFF 
 You're right - down turns it
on. Still, the fact that the same tickle
  
  9107   Wed Sep 4 22:14:35 2013 JenneUpdateSUSMC2 tickler turned OFF

    

       
            
  
  9106   Wed Sep 4 21:44:54 2013 Not JenneUpdateElectronicsRF distribution box: ReinstalledTemporary fix for the switch: give a bit
of oil to the button
Permanent fix: buy better switches.
  
  9105   Wed Sep 4 20:47:15 2013 manasaUpdateLSCCalibrated in-loop MICH noiseTo estimate in-loop MICH noise:
(a) Calibrate MICH_ERR:
1. Lock the arms for IR using POX11
 MICH_noise.pdf 
  9104   Wed Sep 4 20:39:23 2013 ranaUpdateSUSMC2 tickler turned OFF

    

       
            
  
  9103   Wed Sep 4 17:22:09 2013 JenneUpdateLSCDemod phases for RFPDsI checked the demod phases for AS55, POP110,
and all the REFL PDs. 
AS55:  I locked MICH, and shook
  
  9102   Wed Sep 4 16:08:22 2013 manasaUpdateSUSMC2 tickler turned OFF [Jenne, Manasa]
While we were trying to relock the
MC after Jenne put back the RF box, we found
  
  9101   Wed Sep 4 16:06:40 2013 JenneUpdateElectronicsRF distribution box: ReinstalledI have reinstalled the RF distribution
box, as well put in the AS110 demod board. 
I plugged everything back in, and turned
  
  9100   Tue Sep 3 21:10:36 2013 JenneConfigurationElectronicsputting together a 110 MHz LSC demod board for AS

    

       
            
  
  9099   Tue Sep 3 21:08:13 2013 JenneUpdateElectronicsRF distribution box: 110 MHz LO optionsThe RF distribution box is still on the
bench, so again, don't
  
  9098   Tue Sep 3 14:23:21 2013 SteveUpdatePEM earthquakes ~Vancuver, Canada earthquakes: magnitude
6,  5  and more shaking
 
 EQm6&5.png 
  9097   Tue Sep 3 10:54:33 2013 SteveHowToGeneralHow To Coil Cables

    

       
            
  
  9096   Mon Sep 2 18:06:21 2013 JenneUpdateElectronicsRF distribution box: 110 MHz LO optionsAfter scrounging for parts, and opening
up the box, I have modified my proposal to
the following:
 RF_distribution_box_proposed_modifications.pdf0902131751.jpg0902131751a.jpg 
  9095   Mon Sep 2 16:46:32 2013 JenneUpdateElectronicsRF distribution box is on the benchI have pulled the RF distribution box out
of the rack, so I can look at it, and modify
it to have 2 110 MHz spigots. I'm going to
  
  9094   Mon Sep 2 15:22:57 2013 JenneUpdatePSLPMC relocked The PMC was locked on an LG 10 mode
(or something like it), for at least the
last 8 hours.  I relocked it on the
  
  9093   Mon Sep 2 03:51:14 2013 ranaHowToGeneralHow To Coil Cables http://youtu.be/pEd7ru24Vx0   
  9092   Fri Aug 30 14:31:57 2013 SteveUpdateGeneralcleaning upI cleaned up around MC2 and 1Y1 area this
morning.
ETMY NPRO moved from the side to
 MC2areaCP.jpg1Y1areaCleanedUp.jpgETMY_NPROmoved.jpg 
  9091   Fri Aug 30 11:00:46 2013 ManasaUpdateGeneralSeries of earthquakesThere has been a series of earthquakes  Screenshot-Earthquakes_-_Mozilla_Firefox.pngSUSnSEIS.png 
  9090   Fri Aug 30 08:08:29 2013 steveUpdatesafetyfire horns-flashers tested OK 
 We had fire alarm tests
 and evacuation drills at 1:30pm yesterday.
  
  9089   Fri Aug 30 01:01:28 2013 rana, nicSummaryComputer Scripts / ProgramsaLIGO Noise Budget code installed and runningChris Wipf has been developing a new Noise
Budget code that allows us to use our existing
Simulink models to handle all of the noise
 NBplots.pngScreen_Shot_2013-08-30_at_1.00.02_AM.png 
  9088   Thu Aug 29 17:25:50 2013 JamieUpdateSUSSUS medm screen upgradeRana asked me to look at the SUS MEDM screen
upgrade situation, and provide an upgrade
prescription.  Unfortunately there not
  
  9087   Wed Aug 28 23:09:55 2013 jamieConfigurationCDScode to generate host IPC graph   hosts.png40m-ipcs-graph.py 
  9086   Wed Aug 28 19:47:28 2013 jamieConfigurationCDSfront end IPC configuration

    

       
            
  
  9085   Wed Aug 28 15:41:42 2013 SteveUpdateVACRGA scan at day 23 Valve configuration: Vacuum Normal
pd76-m-d23
 
 pd75md23.png 
  9084   Wed Aug 28 11:23:41 2013 SteveUpdateVACcrane repair sheduled

    

       
            
  
  9083   Wed Aug 28 11:15:02 2013 SteveUpdateGreen LockingXend green layout corrections

    

       
            
  
  9082   Wed Aug 28 07:33:51 2013 manasaUpdateLSCMICH lockingI wanted to measure the OLTF of MICH.
What I did:
1. Ran LSC offsets script to zero
 MICH.pdf 
  9081   Wed Aug 28 06:26:28 2013 manasaUpdateComputer Scripts / ProgramsASS req and snap files edited[From yesterday] ASS for X arm was behaving
slightly funny over the last couple of days.
ASS could not correct the BS misalignment.
  
  9080   Wed Aug 28 06:17:15 2013 manasaUpdateComputer Scripts / Programsalias for MATLAB2010Although Matlab 2013 has not been causing
any visible trouble so far, it takes a while
to startup.
  
  9079   Wed Aug 28 05:21:58 2013 manasaUpdateCDSCDS svn commits not happeningI am responsible for missed
svn commits with als and asx. I have committed them.
  
  9078   Wed Aug 28 03:28:00 2013 JenneUpdateLSCPlaying with DRMI, some ASS automation prep[Rana, Jenne]
We did lots of poking around with
the DRMI tonight.  I should elog more
  
  9077   Wed Aug 28 00:41:23 2013 JenneUpdateCDSCDS svn commits not happeningsvn status update. asx, als and ioo
were found not committed. Not sure about who modified
  
  9076   Tue Aug 27 20:43:34 2013 KojiConfigurationCDSfront end IPC configurationThe reason we had the PCIe/RFM system was
to test this mixed configuration in prior
to the actual implementation at the sites.
  
  9075   Tue Aug 27 19:50:06 2013 JamieConfigurationComputer Scripts / Programscdsutils checked out into /opt/rtcdsI have checked out the new cdsutils
repository at:

/opt/rtcds/cdsutils/release

This
  
  9074   Tue Aug 27 19:34:36 2013 JamieConfigurationCDSfront end IPC configurationSo the IPC situation on the front end network
is not so great right now.  For various
no-longer-valid reasons, c1lsc had no RFM
 hosts.png 
  9073   Tue Aug 27 18:58:52 2013 KojiConfigurationElectronics110 MHz LO options- Do we have an appropriate amplifier?
- True challenge could be to find
a feedthrough for the new port. (or to find
  
  9072   Tue Aug 27 18:21:35 2013 JenneConfigurationElectronics110 MHz LO optionsAs I see it, we have a few options for
getting the 110 MHz LO to both the POP110
and AS110 demod boards.  
  
  9071   Tue Aug 27 17:32:52 2013 JenneConfigurationElectronicsputting together a 110 MHz LSC demod board for ASI measured the phase split between the
I and Q signals of my AS110 board. 
To do so, I plugged the board into an empty
  
  9070   Tue Aug 27 15:44:08 2013 manasaUpdateCDSIssues with ALS fixedI figured out the problem with ALS from
yesterday. While the model was just fine,
the medm screens were not checked if they
  
  9069   Tue Aug 27 15:31:48 2013 JenneConfigurationElectronicsputting together a 110 MHz LSC demod board for AS

    

       
            
  
  9068   Tue Aug 27 02:18:28 2013 JenneUpdateLSCPRMI, DRMI sensing matricesI have made a measurement of the PRMI and
the DRMI sensing matrices. 
Keiko pointed out to me in an email
 SensMatMeas_26Aug2013_withErrorBars.pngSensMatMeas_26Aug2013_DRMI_firstEverMeasurement.png 
  9067   Mon Aug 26 20:13:17 2013 ranaConfigurationElectronicsputting together a 110 MHz LSC demod board for AS

    

       
            
  
  9066   Mon Aug 26 19:54:15 2013 manasaUpdateCDSc1als model modifiedI had made changes to the c1als model a
couple of weeks ago. I had removed all the
beat_coarse channels that had existed from
 mistake-cartoon.gif 