40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 15 of 357  Not logged in ELOG logo
ID Date Authordown Type Category Subject Text Attachments
  487   Mon May 19 11:49:57 2008 steveUpdateSUSetmy oplev laser replacedThe 9 years old Uniphase HeNe was replaced
by a new JDSU 1103P
Power output ~3.5 mW, reflected light back
  
  488   Tue May 20 09:28:42 2008 steveBureaucracySAFETYsafety traning for 40mTara Chalernsongsak, new gradstudent for K.
Libbrecht was introduced to the basics of
the 40m operations.
  
  491   Thu May 22 11:21:45 2008 steveBureaucracySAFETYearly surf sudentCaltech under grad Eric Mintun received the
40m safety training.
Now he has to read and sign SOP of laser
  
  502   Wed May 28 14:19:47 2008 steveUpdatePSLkaleidoscope of pslatm 1: scattering psl table optics from the
top of the output periscope f4, 60s @MOPA
3 W
 pslscat.pngpslscat2.png2GigEs.pngperwash.pngetmydisarray.png 
  504   Thu May 29 16:32:09 2008 steveUpdateSUSetmy oplev is backI relayed the optics for ETMY-oplev as shown
in pictures below.
The reflected beam goes directly to the qpd
 P1020417.pngP1020420.png 
  505   Thu May 29 16:49:49 2008 steveBureaucracyPhotosYoichi has arrivedYoichi had his first 40m meeting. We welcomed
him and Tobin, who is visiting, by sugar
napoleons that 
 yoichi.pngbobsn.png 
  516   Wed Jun 4 10:18:52 2008 steveUpdatePSLwedged SS beam trapI moved the SS trap over to the psl table.
Texas super # 8 was used from the large shipment.
TXs#8 scattering measured as before, meaning
 trap1.pngtrap2.png 
  523   Fri Jun 6 15:56:00 2008 steveBureaucracySAFETYYoichi received safety trainingYoichi Aso received 40m specific safety training.   
  524   Fri Jun 6 16:10:51 2008 steveUpdatePSLHEPA filters are running at 100%The psl HEPA filters were turned up to run
at 100% to accommodate beam trap work on
Tuesday, June 3, 2008
  
  528   Tue Jun 10 08:37:18 2008 steveUpdatePSLbeam trap is being testedHigh power beam trap is being tested just
west of FSS area on psl enclosure.
 trapss3w.png 
  529   Wed Jun 11 11:45:25 2008 steveUpdatePSLss trap worksThe trap works well at 3 W level.  No back
reflected beam coming out of the trap on
low power
 P1020534.pngP1020533.png 
  550   Fri Jun 20 17:42:48 2008 steveUpdatePSLSS trap scattering compared to black glass trapCircular SS304 trap was compared to wedged
black glass trap.
 cSSt_1.pngcSSt_2.pngscatset_61908.pngcSSt&wBGt.pngcSStbeam.png 
  581   Fri Jun 27 09:20:15 2008 steveFrogsPEMdust particle count is up & alarm handler is onThis 3 years plot show the trend of seasons.
When outside air quality goes bad ( 0.5 micron
> 1 million ) the lab follows.
 dust3y.jpg 
  600   Mon Jun 30 08:59:23 2008 steveUpdateIOOIOO-MC_DEMOD_LO is lowThe alarm handler is beeping relentlessly:
asking for help in high partical count and
low demod signal
 demlo.jpg_____ 
  608   Tue Jul 1 09:26:33 2008 steveUpdateComputersRFM network is down    
  609   Tue Jul 1 10:15:22 2008 steveUpdatePSLeventfull two daysThe laser recovered from a short temp rise.
The MZ was aligned and realigned. The suspentions
were kicked up accidentally. 
 2d.jpg 
  624   Wed Jul 2 15:14:42 2008 steveUpdateGeneraladded beam trapsI placed baked razor beam trap after INJ_SM1
and flipper in the injection path on the
AP table
  
  642   Mon Jul 7 16:30:08 2008 steveUpdatePSLPSL-PEM 16 days trendThis morning the laser head temp was up to
20.3C  because the laser chiller was overflowing.
I removed 700 cc water. 
 pempsl16d.jpg 
  645   Tue Jul 8 08:16:56 2008 steveUpdatePSLPMC problemThe PMC is unhappy. PMC auto locker is not
working.
DC output slider adjust has to be moved from
 pmc.jpg 
  646   Tue Jul 8 10:20:10 2008 steveUpdatePEMHEPA turned onIt is specially important to run the PSL-HEPA
filters when inside counts is peaking at
30,000 counts
 hepa.jpg 
  652   Wed Jul 9 15:04:22 2008 steveMetaphysicsPhotosSURFs helping handsSurf students are helping out with baffle
cleaning.
 surfjob.png 
  659   Fri Jul 11 09:29:02 2008 steveUpdatePSLthe PMC still hangs upMorning alarms:

PMC high voltage is railing, it's auto locker
 pmc4d.jpg 
  670   Tue Jul 15 09:47:09 2008 steveUpdatePEMlab temps and particlesAll air condtion units were serviced last
Friday.
AC filters are trying to control our particle
 temps24d.jpg 
  672   Tue Jul 15 10:24:57 2008 steveUpdatePSLPMC temp & pzt voltageThe PMC pzt HV was happy with no HEPA temp
stability.
Can we thermally insulate the pmc ?
 pmctemp.jpg 
  677   Wed Jul 16 09:27:17 2008 steveUpdateALARMPSL-FSS_RMTEMP alarm is falseMorning alarm sound is good for people who
does not drink coffee.
Our 40m alarm is on every morning.
 frmtemp2y.jpg 
  688   Thu Jul 17 08:30:15 2008 steveUpdatePSLPMC relocked manuallyThe PMC pzt HV and the servo gain adj. are
railing at max this morning
 pmc4d.jpg 
  705   Mon Jul 21 10:00:42 2008 steveUpdatePEMifo room tempFive years of temp trend with 5 C fluctuation.
The campus chilled water supply was upgraded
~ 1 year ago.
 temp5y.jpg 
  708   Mon Jul 21 15:52:22 2008 steveBureaucracySAFETYfire alarms testThe fire alarm test and evacuation drill was
successfully completed at 13:45 Wednesday,
July 16, 2008
  
  712   Tue Jul 22 09:24:17 2008 steveUpdatePSLlaser powerLaser power reality of 120 days  power120d.jpg 
  716   Tue Jul 22 16:50:09 2008 steveMetaphysicsEnvironmentprofessorial clean up of work benchAtm1: is showing the spiritual satisfaction
after work bench clean up by the professor
himself.
 ranaclup.pngcleanup2.png 
  790   Mon Aug 4 12:12:20 2008 steveConfigurationVACthe ifo is at atmThe 40m vac envelope was vented this morning.
P1 is at 760 Torr
 vent3h.jpgUntitled.png 
  797   Tue Aug 5 10:23:00 2008 steveUpdateSUSearthquake and venting effectsatm 1, EQ
atm 2, vent 7 days later: venting kicks optic
into place to be free,
 eq4h.jpgvent4hr.jpg 
  831   Wed Aug 13 17:00:59 2008 steveConfigurationSUSBS sat amp removedThe PRM sat amp is broken. Ben is working
on it.
The BS sat amp was removed from the BS sus
  
  833   Thu Aug 14 10:26:45 2008 steveHowToSUSsus cable pin cheater for out of vac dampingThe 40m D25 vacuum feed troughs give you a
mirror image pin count.
 suscabmin.png 
  834   Thu Aug 14 11:39:06 2008 steveUpdatePEMparticle counter is out of orderThe 40m ifo paricle counter sensor failed
last night.
  
  840   Fri Aug 15 14:12:31 2008 steveBureaucracySAFETYsafety glasses required The MOPA shutter is opened,
the PSL enclosure is switched to bypass mode,
manual block removed from PMC,
  
  843   Fri Aug 15 19:32:49 2008 steveConfigurationVACpumpdown completeI have just reached vacuum normal. The maglev
peaked at 49.8C body temp with aux fan on
at 3.2 Torr
 pdprm.jpg 
  845   Mon Aug 18 09:19:55 2008 steveSummaryVAC11 days at atmIt took 11 days to fix earth quake triggered
sus problems of ITMX, SRM and PRM
Only ITMX north and BSC north vac doors were
 ventprm.jpg 
  865   Thu Aug 21 10:24:20 2008 steveConfigurationSAFETYlaser safe mode conditionThe MOPA and PSL shutters are closed.
Manual beam blocks are in place.
Enclosure interlock is enabled.
  
  866   Thu Aug 21 16:28:59 2008 steveConfigurationSAFETYsafety glasses required I just opened the MOPA shutter so PA is warming
up.
  
  871   Fri Aug 22 16:06:29 2008 steveUpdatePEMparticle counter replaced, flowbenches & HEPAs checkedMetOne #2 counter was swapped in (on the top
of IOC, facing SW direction, at ~75 deg upwards)
with channel one size 0.3 micron and channel
  
  875   Mon Aug 25 10:23:53 2008 steveHowToGeneralcable killerRack 1Y7 double violation:

BNC cables left to be jammed by door
 cablkill.pngcablkll2.png 
  876   Mon Aug 25 10:51:06 2008 steveUpdatePSLpsl headtemp is coming downThe laser water cooler was overflowing this
morning.
I removed 500 cc water from the chiller.
 ht4dw.jpg 
  885   Tue Aug 26 09:58:59 2008 steveOmnistructureCOCETMX is #03This is the picture of ETMX from the upper
south west viewport
 etmx-d40posg_012.jpgetmx03.jpg 
  887   Tue Aug 26 15:06:16 2008 steveConfigurationVACrga scanPumpdown 66 PRM-maglev vac normal -day 11
short form: pd66PRM-m-d11
 RGA-0808260125.png 
  901   Fri Aug 29 15:01:45 2008 steveUpdatePSLMOPA_HTEMP in increasingThe laser chiller temp is 21.9C ( it should
be 20.0C )
Control room temp 73F ok, no obvious block
 htcl.jpg 
  911   Tue Sep 2 10:09:03 2008 steveUpdatePSLhead temp is cooling downThe chiller was over flowing this morning.
800 cc of water was removed.
PSL-126MOPA_HTEMP peaked at 20.7 C (normal
  
  931   Fri Sep 5 08:34:03 2008 steveUpdatePSLMZ lockedThe MC is happy.
The MZ can be locked if you move the slider
by hand.
 mzhv.jpg 
  933   Fri Sep 5 10:36:34 2008 steveUpdatePEMthermostate setting changedSome one changed the thermostat (old control
room ) setting behind 1Y6 from 73 to 79F
It should be in the elog.
  
  935   Mon Sep 8 10:57:49 2008 steveUpdateIOOthe psl and mc are back to normalThe alarm handler is silent this morning.
This is almost unbelievably pleasant after
two mount of harassment.
 fss.pngpmcbrick.pngbrick.jpg 
ELOG V3.1.3-