  6077   Tue Dec 6 21:37:08 2011 JenneUpdateRF SystemNew EOM mount in placeEOM
is remounted on the fancy-pants new mount
that I crafted.  EOM is also aligned. 
  
  15125   Wed Jan 15 14:10:28 2020 JonConfigurationPSLNew EPICS database for C1PSL + C1IOOSummary

I have completed the
new EPICS channel database for the c1psl
and c1ioo channels
  
  7449   Thu Sep 27 19:03:06 2012 ManasaUpdate40m UpgradingNew ETMX layout - Version 1.0 I am working towards redesigning
the endtables. I've attached the first version
of the layout. As per Steve's comment I've
 ETMX_OldNew.png 
  7450   Thu Sep 27 20:05:57 2012 KojiUpdate40m UpgradingNew ETMX layout - Version 1.01. I wonder how the mode profiling/matching
was considered in the new layout.

I can see the distances between the
  
  7451   Fri Sep 28 07:49:30 2012 SteveUpdate40m UpgradingNew ETMX layout - Version 1.0  Where is IP-ANG ? It is good
practice to use two mirrors at launching
and detecting the beam, so you can walk it
  
  1263   Mon Feb 2 12:35:22 2009 AlbertoConfigurationGeneralNew Elog 2.7.5 in Service on NodusI moved the 40m, the Adhikari Lab and the
SUS elogs from Dziban (located in Millikan's
6th floor) to our gateway server Nodus. In
  
  1266   Mon Feb 2 18:51:02 2009 AlbertoConfigurationGeneralNew Elog 2.7.5 in Service on Nodus


   
        
            
  
  1474   Sun Apr 12 01:19:30 2009 YoichiConfigurationComputersNew FE codes for suspensions not successfulAlex recompiled the suspension FE codes for
c1susvme1 and c1susvme2 to fix the denormalization
problem.
  
  1988   Wed Sep 16 11:58:11 2009 JenneUpdateAdaptive FilteringNew Filters for Adaptive FilteringWhen Sanjit and I were looking at the adaptive
filtering system on Monday and Friday, we
noticed that turning on the Accelerometers
  
  3002   Thu May 27 23:59:54 2010 ranaUpdatePEMNew Foam Box installedValera
and I put the 2 Guralps and the Ranger onto
the big granite slab and then put the new
 Untitled.png 
  3006   Fri May 28 11:26:35 2010 JenneUpdatePEMNew Foam Box installed


   
        
            
  
  2906   Mon May 10 19:29:33 2010 AlbertoHowToElectronicsNew Focus 1811 PD calibrated against New Focus 1611 PDI measured the output impedance of the
New Focus 1611 PD (the 1GHz one) and it is
50 Ohm for both the DC and the AC output.
  
  377   Thu Mar 13 18:20:29 2008 JohnUpdateGeneralNew Focus 4003 EOM 29.489MHzI measured the modulation index as a function
of drive power using an OSA. Agrees well
with spec of 0.2 rad/V.
 4003.jpg 
  8160   Mon Feb 25 20:25:33 2013 BrettUpdateSUSNew Global Damping MEDM ScreensGlobal damping screens are in progress
for the new global damping infrastructure
Jamie discussed in log #8159. The main overview
  
  4506   Sun Apr 10 19:14:08 2011 KojiUpdateGreen LockingNew Green PD test1I started to modify another green PD set.
It so far has the transimpedance
of 240 Ohm on CLC409 for the RF output.
 SGD444A_240.pngSGD444A_240_test.png 
  4507   Mon Apr 11 09:49:53 2011 ranaUpdateElectronicsNew Green PD test1 Ooh. Can you explain the purpose
of the resistors which are connected to the
(+) inputs? It looks like some real electronics
  
  4508   Mon Apr 11 11:34:05 2011 KojiUpdateElectronicsNew Green PD test1

    

       
            
 SGD444A_240_test.png 
  4513   Mon Apr 11 21:13:15 2011 KojiUpdateElectronicsNew Green PD test1Correction:
The (-) input has been decoupled
by the capacitor. So the series resistance
  
  16069   Wed Apr 21 19:43:20 2021 KojiUpdatePSLNew HEPA speed controlThe new HEPA speed controllers are attached
at the middle of the HEPA unit (not at the
edge of the unit)... (Attachment
 P_20210421_193637.jpgP_20210421_193627.jpg 
  16074   Thu Apr 22 14:41:55 2021 ChubUpdatePSLNew HEPA speed controlWhen adjusting the blower speed, give the
blower at least 30 seconds to speed up or
slow down to the set speed.  The flywheel
 40M_PSL_HEPA.jpg 
  13272   Wed Aug 30 06:45:32 2017 KevinSummaryPEMNew Heater CircuitI changed the heater circuit described
in this
elog to a current sink. The new and old
 circuit.pdf 
  5119   Thu Aug 4 20:05:23 2011 NicoleUpdateSUSNew Horizontal Sliding Base Mount for TT suspension testingIn order to more-securely mount the TT
supsion to the horizontal sliding base, I
have made a sub-mounting plate (upon Koji's
 topplateview.jpgplatform.jpglasersetup.jpg 
  6530   Thu Apr 12 22:04:17 2012 Mike J.UpdateComputersNew Hysteresis Model & PlotsThe new hysteresis model uses a triangle
wave with offset zero points as the position
function and a sinusoidal force function,
 hyst_combo.pngferro_hyst.png 
  16133   Wed May 12 11:45:13 2021 Anchal, PacoSummarySUSNew IMC Settings are miserableWe picked a few parameters from 40m summary
page and plotted them to see the effect of
new settings. On April 4th, old settings
 MC_F_Comparison.pdfMC_TRANS_QPD_Comparison.pdfIMC_REFL_DC_Comparison.pdf 
  16120   Wed May 5 09:04:47 2021 AnchalUpdateSUSNew IMC Suspension Damping Gains uploaded for long term testingWe have uploaded the new damping gains
on all the suspensions of IMC. This completes
changing all the configuration to as mentioned
  
  2640   Thu Feb 25 15:49:05 2010 AlbertoAoGCDSNew IO Chassis for the new CDSYesterday Kiwamu and I went to Downs
to take all the available parts of the IO
chassis that Gary and I had put together
  
  2614   Fri Feb 19 00:31:17 2010 JenneUpdateCOCNew ITMX guiderods glued[Jenne, Kiwamu, with moral support from
Koji, and loads of advice from Steve and
Bob]
  
  5419   Thu Sep 15 17:00:10 2011 Paul and SteveUpdateSUSNew ITMY and SRM oplev plan We have made a new plan for the ITMY
and SRM oplev optical path which uses as
few optics as possible. This should help
 oplev_plan1.png 
  2435   Sun Dec 20 23:42:44 2009 JenneUpdateIOONew Input Mode Matching TelescopeI've got most of the new Mode Matching
Telescope figured out.  The scripts
and an example result are at: MMT09
  
  4805   Fri Jun 10 14:50:37 2011 KojiUpdateLSCNew LSC code installed[Koji Jamie]
The new c1lsc code has been installed.
The LSC screens have also been updated (except
  
  11007   Wed Feb 11 22:13:44 2015 JenneUpdateLSCNew Locking Paradigm - LSC model changesIn order to try out the new locking scheme
tonight, I have modified the LSC model. 
Screens have not yet been made.
  
  11009   Thu Feb 12 01:43:09 2015 ranaUpdateLSCNew Locking Paradigm - LSC model changesWith the  TF.gif 
  11017   Thu Feb 12 22:28:16 2015 JenneUpdateLSCNew Locking Paradigm - LSC model changes, screens modifiedI have modified the LSC trigger matrix
screen, as well as the LSC overview screen,
to reflect the modifications to the model
  
  11011   Thu Feb 12 11:14:29 2015 JenneUpdateLSCNew Locking Paradigm - Loop-gebraI have calculated the response of this
new 2.5 loop system.

The first attachment is my block
 ALS_REFL_comboLockingCartoon_11Feb2015.PDFALS_REFL_comboLocking_11Feb2015.zip 
  11012   Thu Feb 12 11:59:58 2015 KojiUpdateLSCNew Locking Paradigm - Loop-gebraThe goals are:

- When the REFL path is
dead (e.g. S_REFL = 0), the system goes back
  
  11016   Thu Feb 12 19:18:49 2015 JenneUpdateLSCNew Locking Paradigm - Loop-gebraEDIT, JCD, 17Feb2015:  Updated loop
diagram and calculation: http://131.215.115.52:8080/40m/11043


Okay, Koji and I talked
  
  11020   Fri Feb 13 03:28:34 2015 ranaUpdateLSCNew Locking Paradigm - Loop-gebraNot
so fast!

In the drawing,
the FF path should actually be summed in
  
  11001   Wed Feb 11 04:08:53 2015 JenneUpdateLSCNew Locking Paradigm?[Rana, Jenne]

While meditating over what to do
about the fact that we can't seem to
  
  14412   Tue Jan 22 20:45:21 2019 gautamUpdateVACNew N2 setupThe N2 ran out this weekend (again no reminder
email, but I haven't found the time to
setup the Python mailer yet). So all the
  
  14026   Wed Jun 27 19:37:16 2018 KojiConfigurationComputersNew NAT router installed[Larry, Koji]

We replaced the NAT router between
martian and the campus net. We have the administrative
 P_20180627_193357.jpg 
  3781   Tue Oct 26 00:45:08 2010 ranaUpdatePSLNew NPRO Diagnostic Wiring   Untitled.png 
  3679   Fri Oct 8 12:29:21 2010 KevinUpdateComputersNew Netgear SwitchI removed some old equipment from the rack
outside the control room and stacked them
next to the filing cabinets in the control
  
  3724   Thu Oct 14 22:26:38 2010 KojiUpdateComputersNew Netgear SwitchThe network cables for the Martian network were
moved to the new Netgear switch
  
  1033   Wed Oct 8 12:35:56 2008 josephbConfigurationComputersNew Network diagram for the 40mAttached is a pdf of the new network diagram
for the 40m after having removed all of the
old hubs.
 40m_network_10-07-08.pdf 
  10410   Tue Aug 19 21:40:44 2014 AndresUpdateIMCNew Optical Setup for the IMCIMC
Calculation and Setup
I have been working in the calculation
 11x 
  5330   Wed Aug 31 16:18:25 2011 JenneUpdateGeneralNew Optics Drawers[Kiwamu, Manuel, Jenne]
The new optics storage drawers have
been populated with optics.  Each drawer
  
  14202   Thu Sep 20 11:29:04 2018 gautamUpdateCDSNew PCIe fiber housed[steve,
yuki, gautam]
 PCIeFiberSwap.pngPCIeFiberSwap_FBrebooted.png 
  14203   Thu Sep 20 16:19:04 2018 gautamUpdateCDSNew PCIe fiber install postponed to tomorrow[steve,
gautam]
  
  14206   Fri Sep 21 16:46:38 2018 gautamUpdateCDSNew PCIe fiber installed and routed[steve,
koji, gautam]
 PCIeFiber.pngIMG_5878.JPG 
  1705   Fri Jun 26 18:00:36 2009 JenneUpdatePEMNew PEM channels for the fancy-pants new microphones[ Jenne, Clara ]
We made new channels for the microphones
which came in this week, by editing C1ADCU_PEM.ini
  