16295
|
Tue Aug 24 22:37:40 2021 |
Anchal | Update | General | Time synchronization not really working | I attempted to install chrony and run it
on one of the FE machines. It didn't
work and in doing so, I lost the working |
|
16322
|
Mon Sep 13 15:14:36 2021 |
Anchal | Update | LSC | Xend Green laser injection mirrors M1 and M2 not responsive | I was showing some green laser locking
to Tega, I noticed that changing the PZT
sliders of M1/M2 angular position on Xend |
|
16330
|
Tue Sep 14 17:22:21 2021 |
Anchal | Update | CDS | Added temp sensor channels to DAQ list | [Tega, Paco, Anchal]
We attempted to reboot fb1 daqd
today to get the new temperature sensor channels |
|
16337
|
Thu Sep 16 10:07:25 2021 |
Anchal | Update | General | Melting 2 | Put outside.
|
|
16340
|
Thu Sep 16 20:18:13 2021 |
Anchal | Update | General | Reset | Fridge brought back inside.
|
|
16351
|
Tue Sep 21 11:09:34 2021 |
Anchal | Summary | CDS | XARM YARM UGF Servo and Oscillators added | I've updated the c1LSC simulink model
to add the so-called UGF servos in the XARM
and YARM single arm loops as well. These |
|
16354
|
Wed Sep 22 12:40:04 2021 |
Anchal | Summary | CDS | XARM YARM UGF Servo and Oscillators shifted to OAF | To reduce burden on c1lsc, I've shifted
the added UGF block to to c1oaf model. c1lsc
had to be modified to allow addition of an |
|
16365
|
Wed Sep 29 17:10:09 2021 |
Anchal | Summary | CDS | c1teststand problems summary | [anchal, ian]
We went and collected some information
for the overlords to fix the c1teststand |
|
16367
|
Thu Sep 30 14:09:37 2021 |
Anchal | Summary | CDS | New way to ssh into c1teststand | Late elog, original time
Wed Sep 29 14:09:59 2021
We opened a new port (22220) in |
|
16368
|
Thu Sep 30 14:13:18 2021 |
Anchal | Update | LSC | HV supply to Xend Green laser injection mirrors M1 and M2 PZT restored | Late elog, original date Sep 15th
We found that the power switch
of HV supply that powers the PZT drivers |
|
16372
|
Mon Oct 4 11:05:44 2021 |
Anchal | Summary | CDS | c1teststand problems summary | [Anchal, Paco]
We tried to fix the ntp synchronization
in c1teststand today by repeating the steps |
|
16381
|
Tue Oct 5 17:58:52 2021 |
Anchal | Summary | CDS | c1teststand problems summary | open-mx service is running successfully
on the fb1(clone), c1bhd and c1sus.
|
|
16382
|
Tue Oct 5 18:00:53 2021 |
Anchal | Summary | CDS | c1teststand time synchronization working now | Today I got a new router that I used to
connect the c1teststand, fb1 and chiara.
I was able to see internet access in c1teststand |
|
16385
|
Wed Oct 6 15:39:29 2021 |
Anchal | Summary | SUS | PRM and BS Angular Actuation transfer function magnitude measurements | Note that your tests were done with the
output matrix for BS and PRM in the compensated
state as done in 40m/16374. |
|
16391
|
Mon Oct 11 17:31:25 2021 |
Anchal | Summary | CDS | Fixed mounting of mx devices in fb. daqd_dc is running now. |
|
|
16392
|
Mon Oct 11 18:29:35 2021 |
Anchal | Summary | CDS | Moving forward? | The teststand has some non-trivial issue
with Myrinet card (either software or hardware)
which even teh experts are saying they don't |
|
16395
|
Tue Oct 12 17:10:56 2021 |
Anchal | Summary | CDS | Some more information | Chris pointed out some information displaying
scripts, that show if the DAQ network is
working or not. I thought it would be nice |
|
16396
|
Tue Oct 12 17:20:12 2021 |
Anchal | Summary | CDS | Connected c1sus2 to martian network | I connected c1sus2 to the martian network
by splitting the c1sim connection with a
5-way switch. I also ran another ethernet |
|
16398
|
Wed Oct 13 11:25:14 2021 |
Anchal | Summary | CDS | Ran c1sus2 models in martian CDS. All good! | Three extra steps (when adding
new models, new FE):
Chris
pointed out that the sudo command in c1sus2 |
|
16407
|
Fri Oct 15 16:46:27 2021 |
Anchal | Summary | Optical Levers | Vent Prep | I centered all the optical levers on ITMX,
ITMY, ETMX, ETMY, and BS to a position where
the single arm lock on both were best aligned. |
   |
16416
|
Wed Oct 20 11:16:21 2021 |
Anchal | Summary | PEM | Particle counter setup near BS Chamber | I have placed a GT321 particle counter
on top of the MC1/MC3 chamber next to the
BS chamber. The serial cable is connected |
|
16417
|
Wed Oct 20 11:48:27 2021 |
Anchal | Summary | CDS | Power supple configured correctly. | This was horrible! That's my bad, I
should have checked the configuration before
assuming that it is right. |
|
16420
|
Thu Oct 21 11:41:31 2021 |
Anchal | Summary | PEM | Particle counter setup near BS Chamber | The particle count channel names were changes
yesterday to follow naming conventions used
at the sites. Following are the new names: |
|
16424
|
Mon Oct 25 13:23:45 2021 |
Anchal | Summary | BHD | Before photos of BSC | [Yehonathan, Anchal]
On thursday Oct 21 2021, Yehonathan
and I opened the door to BSC and took some |
|
16425
|
Mon Oct 25 17:37:42 2021 |
Anchal | Summary | BHD | Part I of BHR upgrade - Removed optics from BSC | [Anchal, Paco, Ian]
Clean room etiquettes
Two
people in coverall suits, head covers, masks |
 |
16431
|
Wed Oct 27 16:27:16 2021 |
Anchal | Summary | BHD | Part II of BHR upgrade - Prep | [Anchal, Paco, Ian]
Before we could start working on
Part II, which is to relocate TT2 to new |
 |
16432
|
Wed Oct 27 16:31:35 2021 |
Anchal | Summary | BHD | Part III of BHR upgrade - Removal of PR2 Small Suspension | I went inside the ITMX Chamber to read
off specs from PR2 edge. This was required
to confirm our calculations of LO power for |
|
16433
|
Wed Oct 27 16:38:02 2021 |
Anchal | Summary | BHD | Part II of BHR upgrade - Relocation of TT2 and MMT1/2 alignment | [Anchal, Paco]
We opened BSC and Injection Chamber
doors. We removed two stacked counterweights |
|
16438
|
Thu Oct 28 17:01:54 2021 |
Anchal | Summary | BHD | Part III of BHR upgrade - Adding temp fixed flat mirror for PR2 | [Anchal, Paco, Ian]
We added a Y1-2037-0 mirror
(former IPPOS SM2 mirror) on a fixed mount |
|
16440
|
Fri Oct 29 14:39:37 2021 |
Anchal | Summary | BHD | 1Y1 cleared. IY3 ready for C1SUS2 I/O and FE. | [Anchal, Paco]
We cleared 1Y1 rack today removing
the following items. This stuff is sitting |
  |
16450
|
Fri Nov 5 12:21:16 2021 |
Anchal | Summary | BHD | Part VI of BHR upgrade - Removal of ITMYC optics | Today I opened the ITMY chamber and removed
the following optics and placed them in Xend
flow bench (See attachment 1-3 for updated |
  |
16463
|
Tue Nov 9 19:02:47 2021 |
Anchal | Summary | BHD | 1Y0 Populated and 1Y1,1Y0 powered | [Anchal, Paco]
Today we populated 4 Sat Amp boxes
for LO1, Lo2, AS1, and AS4, 2 BO boxes for |
|
16474
|
Wed Nov 17 17:37:53 2021 |
Anchal | Update | General | Placed Nodus and fb1 on UPS power | Today I placed nodus and fb1 on UPS battery
backed supply. Now power glitches should
not hurt our cds system. |
|
16476
|
Thu Nov 18 15:16:10 2021 |
Anchal | Update | General | Moved Chiara to 1X7 above nodus powered with same UPS | [Anchal, Paco]
We moved chiara to 1X7 above nodus
and powered with same UPS from a battery |
|
16479
|
Mon Nov 22 17:42:19 2021 |
Anchal | Update | General | Connected Megatron to battery backed ports of another UPS | [Anchal, Paco]
I used the UPS that was providing
battery backup for chiara earlier (a APS |
|
16480
|
Tue Nov 23 18:02:05 2021 |
Anchal | Update | IMC | MC autolocker shifted to python3 script running in docker | I finished copying over the current autolocker
bash script functionality into a python script |
|
16509
|
Wed Dec 15 16:11:38 2021 |
Anchal | Summary | BHD | Part VIII of BHR upgrade - Placed LO1 | [Anchal, Yehonathan, Paco]
Today we opened ITMX chamber
and removed the following optics and placed |
|
16512
|
Thu Dec 16 12:21:16 2021 |
Anchal | Update | BHD | Coil driver test failed for S2100619-v1 | Today I found one of the coil driver boards,
S2100619
failed the test on CH2. There appears to |
|
16514
|
Thu Dec 16 15:32:59 2021 |
Anchal | Update | BHD | Finished Coil driver (odd serial number) units tests | We have completed modifications and testing
of the HAM Coil driver D1100687 units with
serial numbers listed below. The DCC |
|
16517
|
Thu Dec 16 17:57:17 2021 |
Anchal | Update | BHD | Finished Coil driver (odd serial number) units tests | S2100619 was fixed
by Koji and it passed the test after
that. |
|
16525
|
Sun Dec 19 07:52:51 2021 |
Anchal | Update | SUS | Remaining task for 2021 | The I/O chassis reassigns the ADC and DAC
indices on every power cycle. When we moved
it, it must have changed it from the order |
|
16527
|
Mon Dec 20 14:10:56 2021 |
Anchal | Update | BHD | All coil drivers ready to be used, modified and tested | Koji found some 68nF caps from Downs and
I finished modifying the last remaining coil
driver box and tested it. |
|
16530
|
Tue Dec 21 16:52:39 2021 |
Anchal | Summary | Electronics | In-air Sat Amp to Vacuum Flange cables laid for 7 new SOS | [Anchal, Yehonathan, Chub]
We today laid down 14 70 ft long
DB25 cables from 1Y1 (6), 1Y0 (8) to ITMY |
|
16533
|
Wed Dec 22 17:40:22 2021 |
Anchal | Summary | CDS | c1su2 model updated with SUS damping blocks for 7 SOSs | [Anchal, Koji]
I've updated the c1su2 model
today with model suspension blocks for the |
|
16541
|
Tue Jan 4 18:26:59 2022 |
Anchal | Update | BHD | Tested 2" PR2 candidates transmission | I used the rejected light from the PBS
after the motorized half-wave plate between
PMC and IMC injection path (used for input |
|
16543
|
Wed Jan 5 17:46:04 2022 |
Anchal | Update | BHD | Tested 2" PR2 candidates transmission | I tested 2 more optics today, the old PR2
that we took out and another optic I found
in QIL. Both these optics are also not good |
|
16545
|
Thu Jan 6 11:54:20 2022 |
Anchal | Summary | BHD | Part IX of BHR upgrade - Placed AS1 and AS4 | [Paco (Vacuum Work), Anchal]
Today we opened the ITMY Chamber
and installed suspended AS1 and AS4 in their |
|
16546
|
Thu Jan 6 12:52:49 2022 |
Anchal | Update | CDS | Yearly DAQD fix 2022! | Just as predicted, all realtime models
reported "0x4000" error. Read the
parent post for more details. I fixed this |
|
16552
|
Thu Jan 6 21:04:41 2022 |
Anchal | Summary | BHD | Part VIII of BHR upgrade - LO1 OSEMs inserted | [Anchal, Koji] Part of elog:
40m/16549.
The magnets on the mirror face |
|
16554
|
Fri Jan 7 16:17:42 2022 |
Anchal | Summary | BHD | Part IX of BHR upgrade - Placed AS1 and AS4 filters | [paco]
Added input filters, input matrix,
damping filters, output matrix, coil filters, |
|