  40m Log, Page 146 of 344  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  14601   Fri May 10 13:00:25 2019 ChubUpdateGeneralcrane inspection completeThe 40M jib cranes all passed inspection!  20190510_110245.jpg 
  14606   Mon May 13 18:48:32 2019 gautamUpdateGeneralVent prep
c1auxey and c1aux VME crates were
keyed.
EX and EY NPROs were turned
on.
Y arm was aligned to the IR
 ventPrep_20190514.pngdriftMon_20190514.pnglowPowIMC.pngIMG_7434.JPG 
  14607   Tue May 14 10:35:58 2019 gautamUpdateGeneralVent underway
PSL had stayed on overnight. There
was an EQ (M 4.6 near Costa Rica) which showed
up on the Seis BLRMS, and I noticed that
 vent.pngScreenshot_from_2019-05-14_16-35-16.png 
  14642   Tue May 28 17:41:13 2019 gautamUpdateGeneralIFO status[chub, gautam]

Today, we tried to resuscitate
the c1iscaux2 channels by swapping the existing,
 IMG_7444.JPG 
  14724   Thu Jul 4 10:47:37 2019 MilindUpdateGeneralEarthquake nowThere was a magnitude 6.6 earthquake just
a few minutes ago. I am attaching photographs
of the monitor feeds for reference here.
 after_earthquake2.jpgafter_earthquake.jpg 
  14739   Tue Jul 9 18:17:48 2019 gautamUpdateGeneralProjector lightbulb blown outLast documented
replacement in Nov 2018, so ~7 months, which
I believe is par for the course. I am disconnecting
  
  14743   Wed Jul 10 14:55:32 2019 KojiUpdateGeneralProjector lightbulb blown outIn fact the projector is still working.
The lamp timer showed ~8200hrs. I just reset
the timer, but not sure it was the cause
  
  14752   Thu Jul 11 16:22:54 2019 KruthiUpdateGeneralProjector lightbulb blown outI heard a popping sound in the control
room; the projector lightbulb has blown out.
  
  14756   Fri Jul 12 18:54:47 2019 KojiUpdateGeneralItem loan: optical chopper from Cryo LabOptical chopper borrowed from CryoLab to
40m

https://nodus.ligo.caltech.edu:8081/Cryo_Lab/2458
  
  14777   Fri Jul 19 15:51:55 2019 gautamUpdateGeneralProjector lightbulb blown out[chub, gautam]

Bulb replaced. Projector is back
on.
  
  14778   Fri Jul 19 15:54:47 2019 gautamUpdateGeneralControl room UPS Batteries need replacementThe control room UPS started making a beeping
noise saying batteries need replacement.
I hit the "Test" button and the
  
  14780   Fri Jul 19 17:42:58 2019 gautamUpdateGeneralrossa Xdisp brickedFor some reason, rossa's Xdisplay won't
start up anymore. This happened right after
the UPS reset. Koji and I tried ~1.5 hours
  
  14784   Sat Jul 20 11:24:04 2019 gautamUpdateGeneralrossa brickedSummary:

SnapPy
  
  14794   Sun Jul 21 22:16:34 2019 ranaUpdateGeneralrossa Xdisp bricked"bricked" is to mean that it
has the functionality of a brick and can
be tossed. But rossa seems to have just gotten
  
  14826   Sun Aug 4 14:39:41 2019 gautamUpdateGeneralsome lab activity
Unresponsive c1psl, c1iool0, c1auxey
and c1iscaux VME crates were keyed.
c1psl
channels were burt-restored, did a burtrestore,
 ETMX_OL.pngSeismic_TRXTRYandMC_4Aug2019.pdf 
  14881   Mon Sep 16 12:00:16 2019 aaronHowToGeneralMoved some immovable opticsWhen I put away the lenses we had used
for measuring the RF transfer functions of
the QPD heads, I saw that I'd removed
  
  14919   Tue Oct 1 18:35:12 2019 gautamUpdateGeneralBeam centering campaign
With TRX and TRY maximized using
ASS, I centered the Oplev spots on the respective
QPDs for the four test masses and the BS.
  
  14930   Thu Oct 3 12:08:47 2019 gautamUpdateGeneralMake the Jenne-laser setup fiber-coupledI propose the following re-organization
of the PDFR measurement breadboard. We have
all the parts on hand, just needs ~30mins
 PDFR_tabletop.pdfIMG_8014.JPG 
  14931   Thu Oct 3 14:32:37 2019 ranaUpdateGeneralMake the Jenne-laser setup fiber-coupledI'm
curious to see if we really need the 1611,
or if we can calibrate the diode laser vs.
  
  14932   Thu Oct 3 14:54:33 2019 KojiUpdateGeneralMake the Jenne-laser setup fiber-coupledI'm afraid that the RF modualtion of
the laser is nonlinear and the electrical
and optical resoponse is dependent on the
  
  14934   Thu Oct 3 21:05:04 2019 aaronUpdateGeneralMake the Jenne-laser setup fiber-coupledI measured the RF response of the fiber-coupled
NewFocus 1611, calibrating out the cable
delay. The laser current was set to 20.0
 PD_response.pdf 
  14936   Thu Oct 3 23:15:39 2019 KojiUpdateGeneralMake the Jenne-laser setup fiber-coupledThe 1GHz PD has a bit more flat response,
but the laser and the driving network have
more frequency dependence as you saw.
  
  14937   Fri Oct 4 00:30:31 2019 gautamUpdateGeneralMake the Jenne-laser setup fiber-coupledI think the metric of interest here is
the consistency of the AC transimpedance
of the proposed new "Reference PD"
  
  14940   Fri Oct 4 14:25:59 2019 aaronUpdateGeneralMake the Jenne-laser setup fiber-coupledSummary:

The fiber-coupled
PD seems to have a factor of ~1.5 difference
in responsivity compared to the free-space
 PD_norm.pdfPD_AB.pdfJenneAM_fiberPD_cals.pdf 
  14964   Thu Oct 10 23:36:02 2019 KojiUpdateGeneralWednesday cleaning work[Jon, Yehonathan, Gautam, Aaron,
Shruti, Koji]

We get together on Wednesday afternoon
 P_20191009_165624.jpgP_20191009_164740.jpgP_20191010_233631.jpg 
  14969   Mon Oct 14 17:24:28 2019 gautamUpdateGeneralWorkstation computers taken off UPS (temporarily)The UPS is now incessantly beeping. I cannot
handle this constant sound so I shut down
all the control room workstations and moved
  
  14971   Tue Oct 15 17:19:38 2019 KojiUpdateGeneralWednesday cleaning work[Liz, Gautam, Chub, Jordan, Koji]

We removed a significant
amount of e-waste from the lab.
 P_20191015_161711.jpeg 
  14972   Tue Oct 15 17:22:26 2019 gautamUpdateGeneralWorkstation computers back on UPS Batteries + power cables replaced, and
computers back on UPS from today ~3pm.

  
  14975   Thu Oct 17 12:34:51 2019 gautamUpdateGeneralDaytime wishlistSome ideas that would help increase the
locking duty-cycle in the short term. 


Seismometer investigation
 DriftingTTs.pngFSSweirdness.png 
  15069   Tue Dec 3 22:41:17 2019 shrutiUpdateGeneralPLL for PM measurement I worked on the setup up for the phase
modulation measurement of the X end NPRO
PZT. A previous similar measurement can be
 PM_measurement.jpeg 
  15074   Wed Dec 4 20:32:43 2019 gautamUpdateGeneralPLL for PM measurement Were
some cables from the ALS beat setup modified?
I can't see the beat on the scope, and
  
  15077   Thu Dec 5 14:54:15 2019 gautamUpdateGeneralSymlink to SRmeasure and AGmeasureI symlinked the SRmeasure and AGmeasure
commands to /usr/bin/ on donatella (as it
is done on pianosa) so that these scripts
  
  15088   Mon Dec 9 21:22:46 2019 shrutiUpdateGeneralPLL / PM measurement of Xend NPRO PZTIn short: 

Using the
same setup as before with a LPF changed to
have a cutoff of 5 MHz, the PLL was implemented
  
  15101   Tue Dec 17 20:08:09 2019 shrutiUpdateGeneralPLL / PM measurement of Xend NPRO PZT1. Some calculations

For a
Unity Gain Frequency (UGF) of 1 kHz, assumed
PZT response 
 20191217.png 
  15121   Tue Jan 14 20:17:09 2020 gautamSummaryGeneralIFO recoverySummary:

There was no light entering the
IFO. I worked on a few things to bring the
 DCerrors.png 
  15123   Wed Jan 15 10:04:19 2020 gautamSummaryGeneralPOX / POY locking restoredSingle arm locking using POX and POY has
been restored. After running the dither alignment
servos, the TRX/TRY levels are ~0.7. This
 singleArms.png 
  15128   Wed Jan 15 16:54:51 2020 gautamUpdateGeneralPDA10CF removed from AS tablePer Yehonathan's request, I removed
one PDA10CF from a pickoff of REFL on the
AS table (it was being used for the mode
  
  15129   Thu Jan 16 19:32:23 2020 shrutiUpdateGeneralPLL / PM measurement of Xend NPRO PZTWith Gautam's help today the PLL managed
to be be locked for a few brief moments.
Turns out the signal power of the beat was
  
  15148   Thu Jan 23 20:08:49 2020 shrutiUpdateGeneralPLL / PM measurement of Xend NPRO PZTSetup Update:

-
No more SR 560, upgraded to LB1005
P-I controller.  Because:
 Image-1.jpg 
  15158   Mon Jan 27 14:01:01 2020 JordanConfigurationGeneralRepurposed Sorenson Power Supply The 24 V Sorenson (2nd from bottom) in
the small rack west of 1x2 was repurposed
to 12V 600 mA, and was run to a terminal
  
  15169   Tue Jan 28 19:40:15 2020 shrutiUpdateGeneralPLL / PM measurement of Xend NPRO PZTOver the past few days, I have been trying
to make measurements of the phase modulation
transfer function by modulating the X end
 PMTF.pdfBeatSpectrum.pdf 
  15174   Wed Jan 29 12:29:33 2020 shrutiUpdateGeneraldelay line frequency discriminator for PM Today I began working on a TF measurement
based on the delay line frequency discriminator
setup in elog
 20200128.pngIMG_BB01C068495A-1.jpeg 
  15177   Thu Jan 30 15:24:10 2020 ?UpdateGeneraldelay line frequency discriminator for PMyes, its fine to use this
with a level 3 or level 7 mixer; let's
  
  15180   Thu Jan 30 22:02:42 2020 shrutiUpdateGeneraldelay line frequency discriminator for PMI could not find any level 3 mixers, but
by adjusting the beat frequency the power
in each of the delay line channels rose to
 Figure_2.png 
  15182   Fri Jan 31 16:57:09 2020 gautamUpdateGeneralMetal PMC partsJon brought over a box of parts for constructing
the metal PMCs. I have stored it along the
Y-arm, on top of the green optics cabinet.
  
  15193   Thu Feb 6 16:14:44 2020 ranaUpdateGeneraloffice area temperatureI changed the office area thermostate
near Steve's desk from 68F to 73F
today. Please
  
  15196   Fri Feb 7 02:41:28 2020 KojiUpdateGeneraloffice area temperatureNot sure what's wrong, but the workstation
desk is freezing cold again and the room
temp is 18degC (64degF).
  
  15197   Fri Feb 7 09:45:03 2020 shrutiUpdateGeneralAM at X endI took a few AM TF measurements at the
X end for which I:


Misaligned the ITMX (then
  
  15198   Fri Feb 7 12:58:25 2020 YehonathanUpdateGeneralMetal PMC partsI took the metal PMC box and examined its
content and find the following items:

 18x 
  15201   Mon Feb 10 09:40:54 2020 Larry WallaceSummaryGeneralSolidWorks Computer Upgrade and Printer repairOn February 5, 2020, the Dell engineering
workstation located in the 40M lab, was
replaced with a newer Engineering workstation,
  
ELOG V3.1.3-