  10569   Mon Oct 6 10:28:18 2014 manasaUpdateGeneralUnexpected power shutdown

    

       
            
  
  10568   Mon Oct 6 10:23:43 2014 SteveUpdateVACUnexpected power shutdown

    

       
            
  
  10567   Mon Oct 6 10:04:58 2014 manasaUpdateGeneralUnexpected power shutdownWe had a unexpected    
  10566   Sun Oct 5 23:43:08 2014 KojiUpdateIOOIMC WFS measurementsThere are several non scientific reasons.   
  10565   Sun Oct 5 10:09:49 2014 ranaUpdateIOOIMC WFS measurementsIt seems clever, but I wonder
why use DTT and command line perl, instead
of using the FE lockins or just demod the
  
  10564   Fri Oct 3 13:03:05 2014 ericqUpdateIOOIMC WFS measurementsYesterday, Koji and I measured the transfer
function of pitch and yaw excitations of
each MC mirror, directly to each quadrant
 WFS1PIT.pdfWFS2PIT.pdfWFS1YAW.pdfWFS2YAW.pdfanalyzeWfs.zip 
  10563   Fri Oct 3 10:10:37 2014 SteveUpdateVACcold cathode gauge reading switched 
We have two cold cathode gauges at
the pump spool and one  signal cable
 CC1switched.png 
  10562   Fri Oct 3 03:02:17 2014 ericqUpdateLSCNo luck locking DRMII haven't been able to lock the DRMI tonight,
neither with 1F and no arms nor 3F and arms
held off with ALS... I tried previous recipes,
  
  10561   Thu Oct 2 20:54:45 2014 KojiUpdateIOOIMC WFS measurements[Eric Koji]
We made sensing matrix measurements
for the IMC WFS and the MC2 QPD.
 IMC_RIN_141002.pdfIMC_WFS_141002.pdf 
  10560   Thu Oct 2 14:36:52 2014 steveUpdatePEMoil drops on vertex crane

    

       
            
 VertexOilDrops.jpg 
  10559   Thu Oct 2 09:23:23 2014 SteveUpdateVACvent 77

    

       
            
 vent77SRMmoved.png 
  10558   Wed Oct 1 19:40:46 2014 ericqUpdateLSCArms IR alignedSummary:

    Beamsplitter
was put into MC refl path.
    HWP
was rotated to maximize power into PMC. 
  
  10557   Wed Oct 1 16:26:53 2014 SteveUpdateVACpump down #78 completed 
 Pump down reached "vacuum
normal" state. IFO _P1 pressure 1e-4
 pd78completedin25hrs.png 
  10556   Wed Oct 1 10:21:19 2014 SteveUpdateVACpump down #78 stops at 3.5 Torr

    

       
            
 pd78secondStop.png 
  10555   Tue Sep 30 18:02:53 2014 SteveUpdateVACpump down #78 stops at 320 Torr 
We  stopped pumping just short
of 3 hours at 320 Torr.  Pumping speed
 3h.png 
  10554   Tue Sep 30 17:26:18 2014 ericqUpdateLSCNew AO cable in placeI've installed a new 2pin lemo cable going
from the CM servo out to in2 of the MC servo
board, and removed the temporary BNC. I used
  
  10553   Tue Sep 30 16:18:57 2014 SteveUpdateVACpump down #78 has started 
Q checked the earth quake stops of
SRM and we put the ITMY & BS doors on. 
 pd78hastarted.png 
  10552   Tue Sep 30 11:53:29 2014 ericqUpdateGeneralVent update 
Photos have been taken of the ITMY
chamber, and uploaded to picasa. Here's a
  
  10551   Mon Sep 29 18:12:24 2014 ericqUpdateGeneralVent updateI closed the PSL shutter as we didn't want
to burn the mirror surface when we are not
working.
  
  10550   Mon Sep 29 17:10:51 2014 ericqUpdateGeneralVent updateEverything is aligned, AS and POY make
it out of vacuum unclipped, OSEM readings
look good.
  
  10549   Mon Sep 29 12:47:51 2014 ericqUpdateGeneralVent update

    

       
            
  
  10548   Mon Sep 29 10:29:25 2014 SteveUpdateVACRGA is not running 
 The RGA time stamp was correct
last at 20140527
 rgascanTimeStamp.png 
  10547   Mon Sep 29 09:11:25 2014 SteveUpdateVACvent day 5 RGA scan 
 
 v77_bg-mag-d5.png 
  10546   Fri Sep 26 17:13:39 2014 ericqUpdateGeneralVent update

    

       
            
  
  10545   Fri Sep 26 16:10:14 2014 ericqUpdateGeneralVent updateToday so far:

    I moved SRM forward by
3mm
    Then I leveled the ITMY
  
  10544   Fri Sep 26 12:25:34 2014 ericqUpdateGeneralVent progressI figured out that didn't change the initial
guess for the fit routine in Gabriele's code.
I also changed the fminsearch criteria to
  
  10543   Fri Sep 26 11:44:55 2014 nicolasFrogsComputer Scripts / ProgramsLoaded larry's fake filter into C1:ALS-OFFSETTER2 Larry and Nicolas
Larry's transfer function measurements
suddenly started returning 0dB 0degrees when
  
  10542   Fri Sep 26 09:13:17 2014 SteveUpdateSUSvent day 2 ITMY in vac table needs leveling.  ventDay2.pngITMY.png 
  10541   Thu Sep 25 19:42:12 2014 ericqUpdateGeneralVent progress[q, Jenne, Manasa]
ELOG Outline

    Aligned arms
  
  
  10540   Thu Sep 25 15:41:15 2014 ericqUpdateComputer Scripts / ProgramsRossa having a better day 
I think I found out why rossa was
mad. 
  
  10539   Thu Sep 25 11:38:47 2014 JenneUpdatePEMSeismometers in place[Zach, Jenne, Steve]
This work happened on Tuesday. 
Bad Jenne for forgetting to elog it!
  
  10538   Thu Sep 25 11:33:41 2014 JenneUpdateLSCPOY alignment laser

    

       
            
  
  10537   Thu Sep 25 10:53:32 2014 SteveUpdateSUSHeNe laser test  
 
 centeredDay6.png 
  10536   Thu Sep 25 08:21:15 2014 SteveUpdateVACvent day 1

    

       
            
 ventDay1.png 
  10535   Wed Sep 24 18:56:45 2014 ericqUpdateGeneralOttavia slownessOttavia was having some severe interaction
latency today. Xorg was taking up >90%
of the CPU, just sitting around. The machine
  
  10534   Wed Sep 24 18:17:46 2014 ericqUpdateGeneralAlignment RestoredInterferometer
alignment is restored
ASS has been run on each arm, recycling
  
  10533   Wed Sep 24 16:02:58 2014 JenneUpdateVACvent is completed[Steve, EricQ, Jenne]
ITMY and BS heavy doors are off,
light doors are on.  Q is aligning the
  
  10532   Wed Sep 24 13:28:48 2014 SteveUpdateVACvent is completed The vent is completed. ITMX was kicked
up accidentally. Valve configuration: chamber
open, RGA is pumped through VM2  Maglev
 ventiscompleted.pngatAtm.png 
  10531   Wed Sep 24 11:02:38 2014 manasaUpdateLSCMoving SRMI looked at the CAD layout and it seems
like we will clearly
  
  10530   Wed Sep 24 08:40:29 2014 SteveUpdateVACVent has started 
 Jam nuts checked. Oplev servos
turned off. Particle count checked. Vertex
 vent77.pngbvent77.png 
  10529   Wed Sep 24 08:39:32 2014 Jenne, EricQUpdateGeneralVent prep for SRC length change

    

       
            
  
  10528   Tue Sep 23 17:56:13 2014 Jenne, EricQUpdateGeneralVent prep for SRC length changeAs Q mentioned in elog
10527, (prompted by Koji's email this
afternoon) we are prepping the IFO for vent.
  
  10527   Tue Sep 23 17:37:10 2014 ericqUpdateLSCDRMI lockingRather than using a CAD drawing, I used
Gabriele's code from ELOG
 9590 to try and judge if we could
 SRCcorrection.pdf 
  10526   Tue Sep 23 09:37:12 2014 SteveUpdateSUSIOO and temp changes   IOO.png 
  10525   Tue Sep 23 08:34:14 2014 SteveUpdateSUSHeNe laser test  
 The room temp drops 1 degree
C on the 4th day. The weather has changed.
 tempDrop.png 
  10524   Mon Sep 22 15:20:32 2014 SteveUpdateVACRGA scan at day 229 
 
 RGA@229day.pngRGAscan229d.png 
  10523   Mon Sep 22 10:18:58 2014 steveUpdatePEMlab temperatures 
 
 summerheat.png 
  10522   Mon Sep 22 10:14:07 2014 SteveUpdateSUSHeNe laser test

    

       
            
 1103Pmon3d.png 
  10521   Fri Sep 19 13:12:07 2014 JenneUpdateLSCAO path glitches

    

       
            
  
  10520   Fri Sep 19 04:05:05 2014 ericqUpdateLSCAO path partly engagedMore AO efforts. No huge news. 
Came at AO from each side. For each
sign, I lost lock just a few dB from the
 TFSR785_19-09-2014_020555.pdfTFSR785_19-09-2014_033920.pdf 