Thu May 21 12:58:32 2009, rob, Configuration, ALARM, PEM count-half disabled
| +
Wed May 20 16:03:52 2009, steve, Omnistructure, Environment, using OSEMs to look at seismic activity
|
Wed May 20 09:55:18 2009, steve, Update, PEM, oplev servos turned off
|
Wed May 20 01:53:48 2009, rob, pete, Update, Locking, violin mode filters in drstep_bang
|
Wed May 20 01:41:19 2009, pete, Update, VAC, cryopump probably not it
| +
Tue May 19 16:18:45 2009, steve, Configuration, VAC, IFO pressure is 4.2e-7 Torr with CRYO pump
| +
Tue May 19 16:08:03 2009, rana, Summary, SEI, EUCLID
|
Tue May 19 15:57:07 2009, steve, Update, IOO, MC2 damping restored after EQ
|
Tue May 19 15:54:29 2009, Jenne, Update, PEM, More Plots for the S5 H1:DARM Wiener Filtering.... 6x
| +
Tue May 19 12:30:41 2009, rob, Configuration, SUS, ETMY f2pRatio script run
| +
Mon May 18 15:31:11 2009, rana, Update, PEM, Temp sensor
|
Sun May 17 21:45:40 2009, rob, Update, ASC, ITMX oplev centered
|
Sun May 17 14:35:52 2009, Yoichi, Update, VAC, VC1 opened
| +
Sat May 16 16:20:33 2009, rob, Update, LSC, arms, coils, locks, #2  
|
Fri May 15 16:47:44 2009, josephb, Update, Cameras, Improved camera code
|
Fri May 15 14:05:14 2009, Dmass, HowTo, Computers, How To: Crash the Elog
| +
Thu May 14 16:07:20 2009, pete, Summary, SUS, Channel Hopping: That ancient enemy (MC problems)
|
Thu May 14 02:36:05 2009, pete, Update, Locking, unstable IFO
|
Wed May 13 12:41:14 2009, josephb, Update, Cameras, Timing and stability tests of GigE Camera code 
| +
Wed May 13 03:05:13 2009, pete, Update, oplevs, etmy oplev quad was bad
| +
Tue May 12 15:22:09 2009, Yoichi, Update, LSC, Arm Finesse
|
Tue May 12 01:22:51 2009, Yoichi, Update, LSC, Arm loss
|
Mon May 11 12:25:03 2009, josephb,Alex, Update, Computers, fb40m down for patching
|
Sun May 10 13:41:17 2009, steve, Update, VAC, ETMY damping restored, VC1 opened
| +
Fri May 8 16:29:53 2009, rana, Update, Computer Scripts / Programs, elog and NDS
|
Fri May 8 16:03:31 2009, Jenne, Update, PEM, Update on Jenne's Filtering Stuff 
|
Fri May 8 15:40:44 2009, pete, Update, Locking, progressively weaker locks
|
Fri May 8 10:05:40 2009, Alan, Omnistructure, Computers, Restarted backup since fb40m was rebooted
|
Fri May 8 04:46:01 2009, rana, yoichi, Summary, oplevs, BS/PRM/SRM table bad!
|
Fri May 8 02:39:02 2009, pete, rana, Update, Locking, crossover 
|
Fri May 8 02:08:59 2009, pete, Update, Locking, lock stretches
|
Thu May 7 23:34:59 2009, rob, Update, SEI, seisBLRMS already lost
| +
Thu May 7 23:21:04 2009, pete, Update, Locking, arm power curve
|
Thu May 7 17:59:23 2009, Alberto, Configuration, , MC WFS
| +
Thu May 7 15:22:19 2009, josephb, alberto, Configuration, Computers, fb40m
| +
Thu May 7 10:28:20 2009, steve, Update, VAC, retrofitted maglev's needs
| +
Wed May 6 19:04:11 2009, rana, Summary, VAC, vac images
|
Wed May 6 16:56:35 2009, rana, alex, joe, Configuration, Computers, daqd log, cront, etc.
|
Wed May 6 02:39:20 2009, Yoichi, HowTo, Locking, How to go to DC readout
|
Tue May 5 14:02:16 2009, rob, Update, LSC, DARM DC response varies with DARM offset   
| +
Tue May 5 11:44:33 2009, rob, Update, Locking, DARM response 
| +
Tue May 5 10:42:18 2009, steve, Update, MOPA, laser power is back
|
Tue May 5 09:22:46 2009, caryn, Update, PEM, zeros 
|
Sun May 3 22:48:12 2009, Yoichi, Update, Locking, Some measurements at the lock point  
|
Sat May 2 16:34:31 2009, caryn, DAQ, PEM, Guralp channels plugged back in
|
Fri May 1 18:51:34 2009, Alberto, Summary, Environment, earthquake
|
Fri May 1 18:24:36 2009, Alberto, Summary, General, jitter of REFL beam ?
| +
Fri May 1 10:04:10 2009, rob, Update, Locking, 166MHz LO phase adjustment
| +
Thu Apr 30 15:10:54 2009, rob, Update, Locking, CARM RF changed to REFL_2I
|
Thu Apr 30 05:49:06 2009, Yoichi, Update, Locking, 166MHz LO phase changed
|
|