Tue Apr 28 09:27:32 2009, steve, Configuration, VAC, cryopump deserves some credit 
|
Tue Apr 28 04:30:16 2009, Yoichi, Update, Locking, RF full lock
|
Tue Apr 28 01:48:45 2009, pete, Configuration, VAC, VC1 open
|
Mon Apr 27 18:31:44 2009, steve, Configuration, VAC, VC1 closed
|
Sun Apr 26 02:13:18 2009, Yoichi, Update, Locking, Two more successes of RF CARM handoff
|
Sat Apr 25 03:27:34 2009, Yoichi, Update, Locking, Locking status
|
Sat Apr 25 00:45:31 2009, Yoichi, Configuration, VAC, Reflector for the cryopump temperature monitor changed
|
Sat Apr 25 02:54:25 2009, Yoichi, Configuration, VAC, Reflector for the cryopump temperature monitor changed
|
Fri Apr 24 03:57:30 2009, Yoichi, Update, Locking, DARM demod phase
|
Fri Apr 24 04:38:49 2009, Yoichi, Update, Locking, DARM demod phase
|
Fri Apr 24 11:34:32 2009, rob, Update, Locking, DARM demod phase
|
Fri Apr 24 17:26:57 2009, Yoichi, Update, Locking, DARM demod phase
|
Fri Apr 24 16:24:25 2009, rob, Omnistructure, VAC, Paschen 
|
Thu Apr 23 21:13:37 2009, Yoichi, Summary, Environment, Mag. 4 earthquake in LA tripped the watchdogs of the most optics
|
Thu Apr 23 18:09:11 2009, Yoichi, Update, Environment, Effect of cryopump
|
Thu Apr 23 16:38:33 2009, steve, Update, VAC, vac valve relay box is shorting
|
Thu Apr 23 16:35:23 2009, Yoichi, Summary, Computer Scripts / Programs, restoreWatchdog script
|
Thu Apr 23 16:27:24 2009, Yoichi, Update, Locking, Locking with the cryo-pump
|
Thu Apr 23 13:55:43 2009, josephb, peter, Update, Computers, RCG example
|
Wed Apr 22 11:16:26 2009, steve, Configuration, VAC, Cryo pump is ON and the Maglev is dead
|
Mon Apr 20 20:45:25 2009, rana, Configuration, General, SVN: project area added
|
Mon Apr 20 20:00:44 2009, rana, Configuration, IOO, McWFS gains re-allocated
|
Sun Apr 19 11:51:05 2009, josephb, Update, Cameras, Mafalda may need an update
|
Mon Apr 20 11:57:27 2009, rob, Update, Cameras, Mafalda may need an update
|
Mon Apr 20 18:36:37 2009, rana, Update, Cameras, Mafalda may need an update
|
Mon Apr 20 18:17:44 2009, rob, Summary, Locking, CARM offset/Power rubric
|
Mon Apr 20 05:18:42 2009, Yoichi, Configuration, Locking, FM6 and FM10 of LSC-MC were restored
|
Sun Apr 19 11:34:33 2009, josephb, HowTo, Cameras, USB Frame Grabber - How to
|
Sun Apr 19 03:34:05 2009, Yoichi, Update, Locking, Saturday night lock
|
Thu Apr 16 17:48:00 2009, Yoichi, Configuration, Computer Scripts / Programs, AutoDTT
|
Fri Apr 17 11:37:32 2009, Yoichi, Configuration, Computer Scripts / Programs, AutoDTT
|
Fri Apr 17 11:05:22 2009, Yoichi, Update, Locking, Thursday night locking status
|
Thu Apr 16 16:37:42 2009, Alberto, Update, Auxiliary locking, the zipper
|
Thu Apr 16 17:19:44 2009, Alberto, Update, Auxiliary locking, the zipper 
|
Thu Apr 16 16:26:57 2009, pete, Update, Locking, Wed. night locking
|
Wed Apr 15 17:11:37 2009, Jenne, Update, PSL, Edited c1psl.db to calibrate PMC's LO mon
|
Thu Apr 16 11:17:56 2009, Jenne, Update, PSL, Edited c1psl.db to calibrate PMC's LO mon
|
Wed Apr 8 09:36:20 2009, steve, Configuration, VAC, valve condition changed to BG to calibrate the RGA
|
Wed Apr 15 11:25:21 2009, steve, Configuration, VAC, RGA cal completed
|
Wed Apr 15 03:52:27 2009, rana, Update, DMF, NDS client32 updated for DMF
|
Wed Apr 15 02:20:46 2009, rana, yoichi, Update, DMF, DMF now working copy
|
Wed Apr 15 02:18:42 2009, rana, Configuration, Computers, nodus vfstab changed for rigel
|
Tue Apr 14 17:20:36 2009, Yoichi, Update, Computer Scripts / Programs, Parallel Optickle
|
Mon Apr 13 18:57:03 2009, Alberto, Frogs, Computers, GPIB/ETH Interface Troubles 
|
Tue Apr 14 12:10:11 2009, Alberto, Frogs, Computers, GPIB/ETH Interface Troubles
|
Tue Apr 14 02:59:02 2009, Yoichi, Update, Locking, Power up until 26
|
Mon Apr 13 17:55:37 2009, Jenne, Update, PSL, PMC LO Mon Calibration
|
Fri Apr 10 19:09:48 2009, Jenne, Update, PSL, PMC LO Calibration 
|
Sat Apr 11 00:45:41 2009, Yoichi, Update, PSL, PMC LO Calibration
|
Sun Apr 12 19:27:20 2009, rana, Update, PSL, PMC LO Calibration
|
Mon Apr 13 08:59:57 2009, steve, Update, PSL, mixers on order
|
Sun Apr 12 19:31:43 2009, rana, Summary, Electronics, Amphony 2500 Headphones
|
Sun Apr 12 01:19:30 2009, Yoichi, Configuration, Computers, New FE codes for suspensions not successful
|
Fri Apr 10 19:10:53 2009, Jenne, Update, General, Xarm locked?
|
Fri Apr 10 18:11:18 2009, Jenne, Update, PSL, ISS has a bad cable?
|
Fri Apr 10 04:54:24 2009, Yoichi, Update, Locking, REFL_DC for CARM
|
Thu Apr 9 23:11:27 2009, rob, Summary, Locking, Laser PM to PO-DC transfer functions at multiple CARM offsets  
|
Thu Apr 9 23:20:35 2009, rob, Summary, Locking, Laser PM to REFL-DC transfer functions at multiple CARM offsets  
|
Fri Apr 10 03:10:08 2009, rana, Summary, Locking, Laser PM to REFL-DC transfer functions at multiple CARM offsets
|
Fri Apr 10 01:24:08 2009, rana, Update, Computers, allegra update (sort of)
|
Thu Apr 9 20:56:12 2009, Yoichi, HowTo, General, Restore the alignment. Write elog entries.
|
Thu Apr 9 12:23:49 2009, pete, Update, Locking, tuning ETM common mode
|
Thu Apr 9 11:27:19 2009, steve, Update, VAC, vac gauge reading problem 
|
Wed Apr 8 18:46:50 2009, rana, Configuration, General, DMF, SVN, x2mc, and matlab
|
Tue Apr 7 21:39:57 2009, Yoichi, Configuration, Computers, LSC code recompiled with a fix for denormalization problem
|
Wed Apr 8 18:18:33 2009, rana, Configuration, Computers, LSC code recompiled with a fix for denormalization problem
|
Wed Apr 8 02:47:42 2009, Yoichi, Update, Locking, Locking status  
|
|