Entry  Wed Jun 24 10:53:34 2009, Chris Zimmerman, Update, General, Week 1/2 Update 
Entry  Tue Jun 23 10:06:03 2009, steve, Update, VAC, new maglev RGA scan at day6 newmagscand6.jpgnmagpresd10.jpg
    Reply  Tue Jun 23 15:19:42 2009, steve, Configuration, VAC, V1 is open V1_opennmag.jpg
       Reply  Wed Jun 24 09:21:19 2009, steve, Configuration, VAC, IFO RGA scan with Maglev & Cryo nmagd1ifo.jpgnmagCryopres.jpg
Entry  Tue Jun 23 23:14:36 2009, Clara, Configuration, PEM, Accelerometers relocated 
Entry  Fri Jun 19 13:38:42 2009, Alberto, Configuration, Computers, elog rebooted 
    Reply  Fri Jun 19 14:30:47 2009, Alberto, Configuration, Computers, elog rebooted 
       Reply  Sun Jun 21 00:08:26 2009, rana, Configuration, Computers, elog rebooted 
Entry  Fri Jun 19 13:39:29 2009, Aidan, Update, General, Upper limit measurement of the scatter from the eLIGO beam dumps. D0900095_ELIGO_35_WATT_AIR_COOLED_BEAM_DUMP_3INCH_P.POL-3.PDFbeam_dump_expt.pngscatter_measurement1.pdfBRDF1.pdfIMG_0308.JPG
Entry  Thu Jun 18 23:20:40 2009, rob, Summary, LSC, I-Q ratio with RF detected DARM IQratio.jpg
Entry  Thu Jun 18 23:08:46 2009, rob, Update, Locking, spectrum DARMnoise_929352240.pngDARMnoise_929352240.pdf
Entry  Wed Jun 17 01:09:47 2009, rob, Update, Computers, /cvs/cds 91% full 
Entry  Wed Jun 17 01:07:50 2009, rob, Configuration, Computers, matapps on /cvs/cds 
Entry  Tue Jun 16 20:03:41 2009, Alberto, Update, Electronics, Requirements on Wenzel Multiplier SummaryOfResult.pdf
Entry  Tue Jun 16 17:38:35 2009, rob, Update, Locking, DeWhites ON 
Entry  Tue Jun 16 16:10:01 2009, pete, Update, Locking, input matrix experiments 
Entry  Tue Jun 16 14:02:16 2009, rob, Update, Locking, locked 
Entry  Tue Jun 16 09:02:30 2009, steve, Configuration, VAC, new maglev RGA scan nmagd4scan.jpgnmagd4.jpg
Entry  Tue Jun 16 03:43:04 2009, rob, Update, Locking, same troubles 
Entry  Tue Jun 16 02:09:31 2009, rob, Update, Locking, DD handoff finally working 
Entry  Fri Jun 12 09:56:38 2009, steve, Configuration, VAC, new maglev installed m390pd.jpg
    Reply  Fri Jun 12 15:34:49 2009, steve, Configuration, VAC, maglev is running 
       Reply  Mon Jun 15 16:31:36 2009, steve, Configuration, VAC, RGA is scanning new Maglev 
Entry  Mon Jun 15 15:17:33 2009, josephb, Steve, Configuration, VAC, Vacuum control and monitor screens 
Entry  Fri Jun 12 02:01:03 2009, rob, Update, Computer Scripts / Programs, DRM matrix diagonalization 
Entry  Thu Jun 11 22:14:10 2009, Alberto, Update, LSC, DD Handoff for the Short DOFs completed 
Entry  Thu Jun 11 14:54:18 2009, josephb, alberto, Update, Computers, Wireless network 
Entry  Thu Jun 11 03:15:15 2009, Alberto, Update, LSC, DD Handoff attempts 
Entry  Wed Jun 10 09:28:14 2009, steve, Update, PSL, PMC pmctemphv.jpg
Entry  Wed Jun 10 09:06:12 2009, steve, Update, PEM, particle counts and turbulance parturbulnc.jpg
Entry  Wed Jun 10 01:52:34 2009, Alberto, Update, Electronics, MC length and Marconis' frequencies 
Entry  Sat Jun 6 01:44:53 2009, rob , Update, Locking, ? 
    Reply  Sun Jun 7 04:57:39 2009, Yoichi, Update, Locking, ? 
       Reply  Tue Jun 9 23:25:24 2009, rob, Update, Locking, ? 
Entry  Tue Jun 9 11:29:07 2009, Jenne, Update, oplevs, Measured ETMY oplev beam size...put everything back 
Entry  Mon Jun 8 18:22:27 2009, Alberto, DAQ, LSC, Added PD11 I amd Q slow channels 
Entry  Fri Jun 5 17:22:55 2009, pete, Update, Locking, daytime locking 
Entry  Fri Jun 5 02:59:03 2009, pete, alberto, Update, Locking, tdsavg failure in cm_step script 
    Reply  Fri Jun 5 13:51:49 2009, rob, Update, Locking, tdsavg failure in cm_step script 
       Reply  Fri Jun 5 16:45:28 2009, rob, pete, HowTo, Computers, tdsavg failure in cm_step script 
Entry  Fri Jun 5 01:10:13 2009, rob, pete, Update, Locking, undermined 
Entry  Thu Jun 4 23:39:23 2009, pete, Update, PEM, 5 days, 20 days of accelerometers acc_5day.pngacc_20days.png
Entry  Thu Jun 4 16:54:19 2009, pete, Update, Locking, daytime DD handoff 
Entry  Thu Jun 4 15:53:15 2009, steve, Update, PSL, NPRO cooling flowrate adjusted needlevalve.jpg
Entry  Thu Jun 4 01:32:20 2009, rob, Configuration, LSC, AS port mode scan modes.png
Entry  Wed Jun 3 18:55:27 2009, rana, Update, COC, snapshot of upgrade layout layout.png
Entry  Wed Jun 3 12:31:13 2009, caryn, Update, PEM, plugged in guralp channels 
Entry  Wed Jun 3 11:28:01 2009, caryn, Update, PEM, Unplugged Guralp channels  
Entry  Wed Jun 3 03:30:52 2009, rana, Update, MOPA, NPRO current adjust Untitled.png
Entry  Wed Jun 3 03:22:16 2009, pete, Update, Locking, DD handoff 
Entry  Tue Jun 2 23:55:45 2009, Alberto, Update, oplevs, oplevs centerd 
Entry  Tue Jun 2 23:53:12 2009, pete, DAQ, Computers, reset c1susvme1 
Entry  Tue Jun 2 23:12:08 2009, rob, Configuration, Computers, ntp on op440m 
Entry  Tue Jun 2 02:28:58 2009, pete, Update, Locking, DD handoff work mich_dd.pdf
Entry  Mon Jun 1 13:56:52 2009, Alberto, Update, PSL, Laser Power after fixing the laser chiller MOPAtrend.jpg
    Reply  Mon Jun 1 15:01:31 2009, rana, Update, PSL, Laser Power after fixing the laser chiller: more traces Picture_7.png
       Reply  Mon Jun 1 19:19:26 2009, rana, Update, PSL, 1000 days of hour-trend u.png
Entry  Mon Jun 1 14:49:07 2009, rob, Summary, PSL, psl thoughts 
Entry  Mon Jun 1 14:33:42 2009, rob, Configuration, Computer Scripts / Programs, op540m Monitor added to web status 
Entry  Sat May 30 12:36:52 2009, rob, Update, Computers, c1susvme2, c1iscex running late srmsync.jpgetmxsync.jpg
    Reply  Mon Jun 1 13:25:00 2009, rob, Update, Computers, c1susvme2, c1iscex running late doublesync.jpg
Entry  Sat May 30 12:03:34 2009, rob, Update, PSL, MC locked 
Entry  Sat May 30 11:24:56 2009, rob, Configuration, PSL, NPRO slow scan slowSCAN.png