   +  Reply  Fri Aug 28 13:49:07 2009, rob, Update, Locking, RF CARM hand off problem 
Entry  Thu Aug 27 16:14:28 2009, steve, Summary, OMC, burned photodiode 20090827_173252.jpg20090827_170802.jpg
   +  Reply  Thu Aug 27 13:42:08 2009, rana, Summary, PSL, Reference Cavity Temperature Control: psl.db changes 
Entry  Thu Aug 27 12:34:48 2009, Yoichi, Update, Locking, up to arm power 70 
   +  Reply  Wed Aug 26 16:31:34 2009, steve, Update, PSL, reference cavity temp box temporarly out of order 
Entry  Wed Aug 26 14:45:14 2009, steve, Update, PSL, PSL-FSS_RCTEMP of 4 years refcavtemp.jpg
Entry  Tue Aug 25 23:16:09 2009, Alberto, rana, Configuration, Computers, elog moved in to the cvs path 
Entry  Tue Aug 25 21:26:12 2009, Alberto, Update, Computers, elog restarted 
Entry  Tue Aug 25 03:30:23 2009, Yoichi, Summary, WIKI-40M Update, Green lock and phase noise PhaseNoise.png
Entry  Tue Aug 25 02:37:53 2009, rana, Configuration, Computer Scripts / Programs, Firefox 3.5 installed for 64 bit linux in apps/ DSC_0620.JPG
   +  Reply  Tue Aug 25 00:35:04 2009, rana, Update, General, Transfer function of Mode Cleaner Stacks Untitled.png
   +  Reply  Mon Aug 24 16:48:57 2009, steve, HowTo, VAC, new UPS installed 
Entry  Mon Aug 24 10:43:27 2009, Alberto, Omnistructure, Computers, RFM Network Failure 
Entry  Fri Aug 21 17:49:47 2009, Yoichi, Summary, Computers, Upgrade FE conceptual plan Picture_2.png
Entry  Fri Aug 21 17:28:50 2009, Kevin, rana, Summary, PEM, Magnetic Field Measurements Around the Lab AC-field.pngDC-field.png
Entry  Fri Aug 21 17:05:04 2009, Jenne, Update, General, restarted the elog 
   +  Reply  Thu Aug 20 09:16:32 2009, steve, HowTo, Photos, Control Room Workstation desks lowered to human height P1040788.pngP1040782.pngP1040786.pngP1040789.pngP1040785.png
Entry  Wed Aug 19 23:57:35 2009, rob, Update, Locking, report 
Entry  Wed Aug 19 18:02:22 2009, Jenne, Update, LSC, RF PDs aligned 
   +  Reply  Wed Aug 19 17:11:33 2009, Jenne, Update, IOO, QPDs aligned 
Entry  Tue Aug 18 15:16:15 2009, rob, Update, IOO, MC WFS working again 
Entry  Tue Aug 18 14:24:43 2009, Yoichi, Summary, PSL, Reference Cavity Inspection 
Entry  Tue Aug 18 01:16:01 2009, Jenne, Update, PSL, Mach Zehnder is realigned MachZehnderOptics2.pdf
   +  Reply  Mon Aug 17 17:48:49 2009, rob, Summary, General, conlogger restarted 
Entry  Mon Aug 17 07:01:09 2009, Clara, Update, PEM, ADC noiseness 
   +  Reply  Mon Aug 17 04:16:13 2009, Yoichi, Update, PSL, Reference cavity reflection looks bad 
Entry  Mon Aug 17 02:12:53 2009, Yoichi, Summary, Computers, FE bootfest 
   +  Reply  Sun Aug 16 04:33:11 2009, Clara, Update, Locking, Mode Cleaner is out of lock again 
Entry  Sat Aug 15 18:35:14 2009, Clara, Frogs, Computers, How far back is complete data really saved? (or, is the cake a lie?) 
   +  Reply  Sat Aug 15 10:36:02 2009, Alan, HowTo, Computers, nodus boot procedure 
Entry  Sat Aug 15 05:08:55 2009, Yoichi, Update, Locking, Friday night locking 
Entry  Fri Aug 14 23:45:14 2009, Chris, Update, General, Long Range Readout Table_Setup.pngEllipse.jpgCircle.jpg
Entry  Fri Aug 14 18:33:02 2009, Clara, Update, , Record of Accelerometer and Seismometer Movements 
Entry  Fri Aug 14 15:29:43 2009, Jenne, Update, Computers, c1susvme2 was unmounted from /cvs/cds 
Entry  Fri Aug 14 02:57:46 2009, Clara, Update, PEM, Redo of the Huddle Test 
Entry  Thu Aug 13 22:53:48 2009, Yoichi, Configuration, PSL, FSS nominal common gain changed, MC WFS centered 
Entry  Thu Aug 13 11:20:43 2009, janosch, HowTo, PEM, three-channel self-noise estimation 
   +  Reply  Thu Aug 13 09:22:06 2009, rana, Update, PEM, ranger 
Entry  Thu Aug 13 02:17:56 2009, Jenne, Update, IOO, Mode Cleaner Alignment 
Entry  Wed Aug 12 23:45:03 2009, Chris, Update, General, Long range michelson Actual_Sensor.png
Entry  Wed Aug 12 15:02:33 2009, Alberto, Configuration, Computers, elog restarted 
Entry  Wed Aug 12 13:35:03 2009, josephb, Alex, Configuration, Computers, Tested old Framebuilder 1.5 TB raid array on Linux1 
Entry  Wed Aug 12 12:08:16 2009, Stephanie, Update, General, Multiply Resonant EOM Update Modulation.pngLinearity.pngLinearity_V.png
   +  Reply  Wed Aug 12 10:35:17 2009, jenne, Summary, Computers, Nodus rebooted / SVN down 
Entry  Wed Aug 12 02:00:32 2009, rob, Update, Locking, report 
Entry  Tue Aug 11 23:55:04 2009, rana, rich, Summary, OMC, Quantum Efficiency and Dark Current measurements of eLIGO Photodiodes IMG_0135.png
Entry  Tue Aug 11 14:15:28 2009, Stephanie, Update, General, Multiply Resonant EOM Update 
Entry  Tue Aug 11 02:15:20 2009, Clara, Update, PEM, Guralp breakout box circuit diagram Guralp_circuit_whole.pngGuralp_circuit_broken.png
Entry  Tue Aug 11 01:21:55 2009, rob, Update, PSL, MZ needs some attention badMZservo.png
Entry  Mon Aug 10 20:49:13 2009, Alberto, Rana, Update, PSL, PMC Mode Matching Lenses Tuning 