40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 140 of 171  Not logged in ELOG logo
Entry  Wed Sep 30 17:49:21 2009, Jenne, Update, Adaptive Filtering, New UP/DOWN scripts for OAF 
Entry  Wed Sep 30 12:21:08 2009, Jenne, Update, Computers, restarted the elog 
Entry  Wed Sep 30 01:04:56 2009, rob, Update, Computers, grief C1LSC_XYCOM.jpg
Entry  Tue Sep 29 23:43:49 2009, rana, AoG, all down cond., Cosmic Actel1.jpg
Entry  Tue Sep 29 23:43:46 2009, rob, Update, SUS, ITMY UL OSEM ITMYosemBAD.pdf
Entry  Tue Sep 29 12:47:08 2009, Koji, Update, MZ, MZ unlocked 
    Reply  Tue Sep 29 18:21:41 2009, Koji, Update, MZ, MZ work done 
       Reply  Tue Sep 29 21:37:09 2009, rana, Update, MZ, MZ work done : some noise checking fsm.pdf
          Reply  Tue Sep 29 21:51:32 2009, Koji, Update, MZ, MZ work done : some noise checking 
       Reply  Tue Sep 29 22:51:20 2009, Koji, Update, MZ, Possible gain mis-calibration at other places (Re: MZ work done) 
Entry  Mon Sep 28 23:13:14 2009, Jenne, Configuration, Electronics, Rob is breaking stuff.... 
    Reply  Tue Sep 29 16:14:44 2009, rob, Configuration, Electronics, Rob is breaking stuff.... 
Entry  Tue Sep 29 10:44:29 2009, Koji, Update, MZ, MZ investigation 
Entry  Tue Sep 29 01:50:10 2009, rob, Configuration, LSC, new modulation frequencies 
Entry  Mon Sep 28 23:44:18 2009, Koji, Omnistructure, SAFETY, Crappy power outlet 
Entry  Mon Sep 28 17:39:34 2009, rob, Update, PSL, problems problems.pngproblems2.png
Entry  Mon Sep 28 11:52:23 2009, Jenne, Update, Treasure, OAF screen added to the screenshots webpage 
Entry  Fri Sep 25 19:55:59 2009, Jenne, Update, Adaptive Filtering, Subtraction of the microseism using Adaptive Filtering! OAF_running_WORKING_25Sept2009.png
    Reply  Mon Sep 28 02:24:05 2009, rana, Update, Locking, MC1/3 Dewhitening found OFF: Turned back ON C1SUS_SRM_XYCOM1.pngUntitled.png
Entry  Sun Sep 27 14:45:45 2009, Koji, Update, PSL, SLOWscan result SLOWscan_090927.pngPages_from_miser_126_manual.png
    Reply  Sun Sep 27 15:25:58 2009, Koji, Update, PSL, SLOWscan result power_dependence.png
    Reply  Sun Sep 27 23:21:14 2009, rana, Update, PSL, SLOWscan result 
Entry  Thu Sep 24 21:04:15 2009, Jenne, Update, MOPA, Increasing the power from the MOPA 
    Reply  Sun Sep 27 12:52:56 2009, rana, Update, MOPA, Increasing the power from the MOPA Picture_3.png
Entry  Sat Sep 26 13:55:20 2009, Jenne, Update, MZ, MZ was locked in a bad place 
Entry  Fri Sep 25 16:45:29 2009, Jenne, Update, MOPA, Total MOPA power is constant, but the NPRO's power has decreased after last night's activities? AMPMONconstant_126MONdown.jpg
    Reply  Fri Sep 25 17:51:51 2009, Koji, Update, MOPA, Solved (Re: Total MOPA power is constant, but the NPRO's power has decreased after last night's activities?) 
Entry  Fri Sep 25 16:10:17 2009, Jenne, Update, Adaptive Filtering, Some progress on OAF, but more still to be done OAF_Running_25Sept2009.jpg
Entry  Thu Sep 24 20:17:05 2009, rana, Summary, LSC, Comparison of Material Properties for the new RFPD Mounts 
Entry  Thu Sep 24 19:35:20 2009, rana, HowTo, Photos, 40m Google account 
Entry  Thu Sep 24 15:45:27 2009, rob, Update, IOO, MC OLG 
Entry  Wed Sep 23 17:32:37 2009, rob, AoG, Computers, Gremlins in the RFM 
    Reply  Wed Sep 23 20:02:11 2009, Jenne, AoG, Computers, Gremlins in the RFM 
Entry  Fri Sep 18 16:26:02 2009, steve, Summary, PSL, Neslab chiller is OK 
Entry  Fri Sep 18 14:25:00 2009, rob, Omnistructure, PSL, water under the laser chiller 
    Reply  Fri Sep 18 16:05:08 2009, Jenne, Omnistructure, PSL, water under the laser chiller 
Entry  Thu Sep 17 14:17:04 2009, rob, Update, Computers, awgtpman on c1omc failing to start 
    Reply  Thu Sep 17 15:05:47 2009, rob, Update, Computers, awgtpman on c1omc failing to start 
Entry  Wed Sep 16 11:58:11 2009, Jenne, Update, Adaptive Filtering, New Filters for Adaptive Filtering 
Entry  Tue Sep 15 15:46:05 2009, steve, Update, PEM, PEM and VAC 120dpem.jpg16dpem.jpg
Entry  Tue Sep 8 19:30:33 2009, rana, Update, PSL, c1psl rebooted for new RCPID database settings c1psl-term-dump.txt.gzC1PSL_FSS_RCPID.pngPicture_1.png
    Reply  Thu Sep 10 18:25:15 2009, rana, Update, PSL, c1psl rebooted for new RCPID database settings 
    Reply  Sat Sep 12 15:40:15 2009, rana, Update, PSL, RC response v. can temperature Picture_2.pngUntitled.pdf
Entry  Fri Sep 11 17:11:15 2009, Sanjit, Update, ASS, OAF: progress made 
Entry  Fri Sep 11 17:07:45 2009, Jenne, Update, Adaptive Filtering, Minor changes to ASS_TOP_PEM screen. 
Entry  Thu Sep 10 17:47:25 2009, Jenne, Update, Computers, changes to the startass scripts 
Entry  Thu Sep 10 15:55:44 2009, Jenne, Update, Computers, c1ass rebooted 
Entry  Tue Sep 8 20:15:33 2009, rana, jenne, Summary, PSL, RC temperature servo: Heater Voltage noise 09080901.PDFTEK00074.PNG
    Reply  Wed Sep 9 10:13:31 2009, steve, Bureaucracy, General, the use of FAX machine, scanner & toaster 
Entry  Tue Sep 8 19:36:52 2009, Jenne, Omnistructure, DMF, DMF restarted 
    Reply  Tue Sep 8 20:25:03 2009, Jenne, Omnistructure, DMF, DMF restarted 
Entry  Tue Sep 8 17:57:30 2009, Jenne, Update, PEM, All the Acc/Seis working again 
Entry  Tue Sep 8 16:01:52 2009, steve, Configuration, VAC, RGA was separeted from IFO vm1closed.jpg
Entry  Fri Aug 14 10:39:50 2009, josephb, Configuration, Computers, Raid update to Framebuilder (specs) 
    Reply  Tue Aug 25 01:27:09 2009, rana, Configuration, Computers, Raid update to Framebuilder (not quite) 
       Reply  Tue Sep 8 15:14:26 2009, rana, alex, Configuration, DAQ, RAID update to Framebuilder: directories added + lookback increased 
Entry  Tue Sep 8 12:26:16 2009, Alberto, Update, PSL, Connection of the RC heater's power supply replaced 
Entry  Mon Sep 7 23:51:48 2009, rana, Configuration, Computers, matlab installed: 64-bit linux 
Entry  Thu Aug 27 14:00:33 2009, rana, Update, PSL, RC thermal servo impulse response Untitled.png
    Reply  Mon Sep 7 20:05:18 2009, rana, Update, PSL, RCTEMP v. RMTEMP rct2.pngrct.png
    Reply  Mon Sep 7 23:35:03 2009, rana, Update, PSL, RC thermal servo: PID script modified, database + screen added Untitled.png
Entry  Mon Sep 7 23:18:01 2009, Alberto, Update, Locking, Some locking attempts 
Entry  Thu Sep 3 23:41:32 2009, Alberto, Configuration, LSC, POX (PD3) aligned 
Entry  Tue Sep 1 11:23:36 2009, steve, Update, General, electrical ground ground.JPG
    Reply  Thu Sep 3 11:20:26 2009, steve, Update, General, electrical ground in place Gs-n.JPGnewground.JPG
Entry  Thu Sep 3 10:19:35 2009, steve, alberto, Update, PEM, particle counts and burning hillsides fire6d.jpg40mgarden.JPG40mgarden2.JPGRBLOG-FIRE-SKY.JPG
Entry  Fri Aug 28 15:30:15 2009, steve, Configuration, General, POX rfpd removed 
    Reply  Tue Sep 1 13:52:06 2009, steve, Configuration, General, POX rfpd is back & needs alignment 
Entry  Fri Aug 28 12:56:17 2009, Yoichi, Update, Locking, RF CARM hand off problem 
    Reply  Fri Aug 28 13:49:07 2009, rob, Update, Locking, RF CARM hand off problem 
Entry  Thu Aug 27 16:14:28 2009, steve, Summary, OMC, burned photodiode 20090827_173252.jpg20090827_170802.jpg
Entry  Wed Aug 26 19:58:14 2009, Rana, Alberto, Update, PSL, Reference Cavity Temperature Control: MINCO PID removed rc.png
    Reply  Thu Aug 27 13:42:08 2009, rana, Summary, PSL, Reference Cavity Temperature Control: psl.db changes 
Entry  Thu Aug 27 12:34:48 2009, Yoichi, Update, Locking, up to arm power 70 
Entry  Tue Aug 25 11:02:39 2009, rana, Summary, PSL, Temperature Box D980400-B.pdf
    Reply  Tue Aug 25 18:42:42 2009, steve, Update, PSL, reference cavity temp box temporarly out of order 
       Reply  Tue Aug 25 21:36:28 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 2009-08-25_PSLtrend.png
       Reply  Tue Aug 25 21:55:11 2009, rana, Update, PSL, reference cavity temp box temporarly out of order Untitled.pngrc-heater.jpg
          Reply  Wed Aug 26 15:42:17 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 
             Reply  Wed Aug 26 16:11:41 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 
                Reply  Wed Aug 26 16:31:34 2009, steve, Update, PSL, reference cavity temp box temporarly out of order 
ELOG V3.1.3-