40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 140 of 344  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  616   Tue Jul 1 16:48:42 2008 rob, johnConfigurationPSLMZ servo switch problem resolved forever[quote]C1:PSL-MZ_BLANK switch (to turn on/off
the servo) is not working again. The switch
is always off regardless of the epics state.
  
  2018   Tue Sep 29 12:47:08 2009 KojiUpdateMZMZ unlocked12:45 I started the work on MZ. Thus the
MZ was unlocked.
Found the bad connection on the FLKM
  
  1149   Thu Nov 20 09:37:39 2008 steveUpdatePSLMZ vs tempThis 12 days plot shows that it can hold lock
if the daily temp variation is not more than
3/4 of a degree C
 mztemp.jpg 
  2006   Sat Sep 26 13:55:20 2009 JenneUpdateMZMZ was locked in a bad placeI found the MZ locked in a bad place earlier
today.  It was locked in a similarly
bad spot yesterday after we fixed the cable
  
  2020   Tue Sep 29 18:21:41 2009 KojiUpdateMZMZ work doneThe
MZ work completed. I replaced
the bad cross connection terminal. The gain
  
  2038   Thu Oct 1 19:04:05 2009 KojiUpdateMZMZ work done (Re: MZ Work from 13:00-)MZ work has been done. I did not change
anything on the circuit.
Recently we observed that the MZ
 MZ_PZT.pdf 
  2021   Tue Sep 29 21:37:09 2009 ranaUpdateMZMZ work done : some noise checkingSince we used to run with a gain slider
setting of +15 dB on the MZ, I wanted to
check that the new setting of +30dB was OK.
 fsm.pdf 
  2022   Tue Sep 29 21:51:32 2009 KojiUpdateMZMZ work done : some noise checkingThe previous "+15" was Vctrl
= 0.25 [V]. Which was +18 dB.

  
  1244   Thu Jan 22 11:54:09 2009 AlbertoConfigurationPSLMach Zehnder Output Beam QPDI rotated by 180 degrees the 10% beam splitter
that it is used to fold the beam coming from
the Mach Zehnder (directed to the MC) on
  
  1922   Tue Aug 18 01:16:01 2009 JenneUpdatePSLMach Zehnder is realignedThe Mach Zehnder and I got to know each
other today.  The reason for redoing
the alignment was to improve pointing from
 MachZehnderOptics2.pdf 
  618   Tue Jul 1 21:45:48 2008 JohnUpdatePSLMach Zehnder script and screenI've edited C1: PSL_MACH_ZEHNDER.adl and /cvs/cds/caltech/scripts/PSL/MZ/lockMZ
to reflect the changes described in entry
#616.
  
  2406   Sun Dec 13 20:50:45 2009 ranaSummaryIOOMach Zender CalibrationI ramped the MZ PZT (with the loop disabled
on the input switch) to calibrate it. Since
the transmission has been blocked, I used
 Untitled.png 
  1151   Fri Nov 21 16:11:26 2008 rana, alberto, robUpdatePSLMach Zender alignmentThe Mach Zender's dark port DC voltage had
gone up too high (~0.5 V)and was turning
yellow
 PB210051-1.JPG 
  1155   Fri Nov 21 20:29:43 2008 rana, alberto, robUpdatePSLMach Zender alignment[quote] So now the MZ alignment seems good;
Alberto is on the MC periscope alignment
like a cheap suit.[/quote]
  
  1160   Mon Nov 24 17:14:44 2008 ranaUpdatePSLMach Zender trendsIt looks like the MZ has gotten less drifty
after the alignment on Friday.
 Untitled.png 
  293   Fri Feb 1 17:17:05 2008 JohnSummaryPSLMach-Zender tweakingI helped Rob adjust the alignment of the Mach-Zender
to try and reduce any AM on the laser light.
Our goal was to reduce the large offsets
  
  7418   Thu Sep 20 08:50:14 2012 MashaUpdateMachineLearningMachine Learning Update Hi everyone,
I've been working a bit on neural
network code for a controller, and thus far
  
  14164   Wed Aug 15 12:15:24 2018 gautamUpdateCOCMacroscopic SRC length for SR tuningSummary:

It
 SRC_MCMC_shortTerm.pdfSRC_dists_shortTerm.pdf 
  6991   Thu Jul 19 02:14:37 2012 JenneUpdateVIDEOMade a video guiI learned a little bit of python scripting
while looking at the videoswitch script,
and I made a video medm screen. 
  
  1497   Sun Apr 19 11:51:05 2009 josephbUpdateCamerasMafalda may need an updateI tried installing libusb-dev on mafalda
in order to try getting the usb frame grabber
to work on it, but could not as it could
  
  1499   Mon Apr 20 11:57:27 2009 robUpdateCamerasMafalda may need an update


   
        
            
  
  1501   Mon Apr 20 18:36:37 2009 ranaUpdateCamerasMafalda may need an updateSadly, the sensoray crap doesn't seem to build
on CentOS. I too would prefer a homogenous
solution, 
  
  3714   Thu Oct 14 10:29:33 2010 josephbUpdateComputersMafalda ready for NDS2, updated Rosalba, Rossa reposAt John Zweizig's request, I installed
a couple of packages from the lscsoft repository,
along with libtools, automake, autoconf,
  
  345   Thu Feb 28 16:19:37 2008 josephbConfigurationComputersMafalda rewired and multiple cameras running1) Mafalda is now connected via an orange
Cat5E ethernet cord to the gigabit ethernet
switch in rack in the office space.    It
  
  1183   Sun Dec 7 16:02:46 2008 ranaUpdateGeneralMag 5.1 EQ halfway to VegasThere was a [URL=http://earthquake.usgs.gov/eqcenter/recenteqsww/Quakes/ci14408052.php#details]Mag
5.1 EQ[/URL] Friday night at 8:18 PM.
 g.pngUntitled.png 
  1513   Thu Apr 23 21:13:37 2009 YoichiSummaryEnvironmentMag. 4 earthquake in LA tripped the watchdogs of the most optics So far, no damage is noticeable.
restoreWatchdog script was useful :-)
  
  4120   Thu Jan 6 00:06:01 2011 JenneUpdateIOOMagical absorbing PZT mirror[Kiwamu, Jenne]
We have a measely 465mW going into
  
  3100   Wed Jun 23 11:25:14 2010 Katharine and SharmilaUpdateWIKI-40M UpdateMaglevWeekly update

Lab work
  
  3212   Wed Jul 14 01:05:27 2010 Sharmila,KatharineSummaryelogMaglevYesterday we hooked up the Quadrant Maglev
control to the power supply to test the components
in the Input/Output part of the circuit.
 P7120284.JPGP7120278.JPGP7120281.JPGP7140292.JPG 
  3250   Tue Jul 20 11:55:15 2010 Sharmila,KatharineUpdateelogMaglevWe plotted the transfer functions for the
maglev control circuit and compared them
with the plots from the spectrum 
 tf.pngP7140292.JPG 
  3305   Wed Jul 28 12:09:06 2010 Sharmila,KatharineUpdateWIKI-40M UpdateMaglevWe have modeled our maglev setup in simulink
but we have a few corrections to make since
the system goes into undamped oscillations
 Picture_1.png 
  14262   Mon Oct 22 15:19:05 2018 SteveUpdateVACMaglev controller servicedGautam & Steve,

Our controller is back with Osaka
maintenace completed. We swapped it in this
 our_controller_is_back.png 
  9550   Mon Jan 13 16:50:55 2014 SteveUpdateVACMaglev controller needs service

    

       
            
  
  9776   Wed Apr 2 16:34:15 2014 SteveUpdateVACMaglev controller needs service

    

       
            
  
  14189   Wed Aug 29 09:56:00 2018 SteveUpdateVACMaglev controller needs serviceTP-1 Osaka maglev controller  [ 
model TCO10M,  ser V3F04J07 ] 
needs maintenance. Alarm led  on indicating 
  
  9834   Mon Apr 21 10:14:00 2014 SteveUpdateVACMaglev controller serviced

    

       
            
 ourControllerBack560Hz.png 
  9782   Thu Apr 3 17:05:52 2014 SteveUpdateVACMaglev controller swapped

    

       
            
 loanerControllerIn.png 
  3431   Tue Aug 17 23:59:46 2010 KatharineUpdateelogMaglev updateKatharine, Sharmila

Update:  
 repulsiveforce.pngOSEMcalibration.pngOSEMslopes.png 
  2193   Fri Nov 6 12:56:30 2009 HaixingUpdateSUSMagnet has been levitated  

 DSC_0964.JPGblock_diagram.PNG 
  12328   Sun Jul 24 03:43:56 2016 ericqUpdateGeneralMagnet positioningWhen Koji and I were gluing magnets to
ETMY, we decided to position the side magnet
based on the empirically observed offsets
  
  1933   Fri Aug 21 17:28:50 2009 Kevin, ranaSummaryPEMMagnetic Field Measurements Around the Lab


 AC-field.pngDC-field.png 
  2307   Fri Nov 20 11:32:48 2009 HaixingUpdateSUSMagnetic levitationI added an integrator to increase
the gain at low frequencies (below 5 Hz).
In addition, I increased
 IntDiff.PNGS8007340.jpgS8007333.jpg 
  691   Thu Jul 17 16:39:58 2008 Max JonesUpdateDAQMagnetometer InstalledToday I installed the magnetometer near the
beam splitter chamber. It is located on the
BSC chamber at head height on the inner part
  
  2629   Mon Feb 22 21:07:26 2010 JenneUpdateCOCMagnets glued to ITMX[Kiwamu, Jenne]
The magnets + dumbbell standoffs
have been glued to ITMX.  We're waiting
  
  3777   Mon Oct 25 11:39:06 2010 JenneUpdateSUSMagnets glued to PRMThis morning I glued the magnets to the PRM.
 Now we wait, and tomorrow afternoon (at
the earliest), Suresh and I can balance the
 StatusTable.png 
  14628   Tue May 21 00:15:21 2019 gautamUpdateSUSMain objectives of vent achieved (?)Summary:


ETMY now shows four suspension
eigenmodes, with sensible phasing between
 etmy_oplevs_20190520.pdfETMY_cplxTF.pdfETMY_diagComp.pdfScreen_Shot_2019-05-21_at_12.37.08_AM.png 
  15279   Wed Mar 18 21:43:26 2020 gautamUpdateVACMain vol pressure jumpThere was a jump in the main volume pressure
at ~6pm PDT yesterday. The cause is unknown,
but the pressure doesn't seem to be coming
 VacPresJump.png 
  15280   Wed Mar 18 22:10:41 2020 KojiUpdateVACMain vol pressure jumpI was in the lab at the time. But did not
notice anything (like turbo sound etc). I
was around ETMX/Y (1X9, 1Y4) rack and SUS
  
  14436   Tue Feb 5 19:30:14 2019 gautamUpdateVACMain volume at 20 uTorrPumpdown looks healthy, so I'm leaving
the TPs on overnight. At some point, we should
probably get the RGA going again. I don't
 PD83.png 
  11346   Fri Jun 5 11:59:59 2015 ericqBureaucracyGeneralMaintenance Tasks, IFO upgradesAt wednesday's
meeting, Rana, Koji, Steve, and I started
making a list of maintenence tasks that should
  
ELOG V3.1.3-