40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 13 of 168  Not logged in ELOG logo
Entry  Mon Dec 9 19:19:04 2019, Yehonathan, Update, PSL, AOM first order beam alignment 20191209_193112.jpg20191209_193203_HDR.jpgimageedit_2_7551928142.gifimageedit_3_5863650538.gif
    Reply  Tue Dec 10 01:24:17 2019, Yehonathan, Update, PSL, AOM first order beam alignment 
       Reply  Tue Dec 10 13:26:46 2019, Yehonathan, Update, PSL, AOM first order beam alignment 
    Reply  Fri Jan 17 21:56:22 2020, Yehonathan, Update, PSL, AOM first order beam alignment 20200117_174841.jpg
       Reply  Wed Jan 22 11:00:21 2020, gautam, Update, PSL, PMC REFL ghost beam 
Entry  Mon Jan 20 15:11:20 2020, gautam, Update, PSL, PMCT photodiode grounding issue PMCT_anomaly.pdf
Entry  Mon Jan 20 12:16:50 2020, gautam, Update, PSL, PMC input reverted to AOM zeroth order beam IMG_8362.JPG
Entry  Wed Jan 15 16:54:51 2020, gautam, Update, General, PDA10CF removed from AS table 
Entry  Mon Jan 6 15:36:55 2020, Jon, Update, PSL, Assembly underway for c1psl upgrade 
    Reply  Mon Jan 6 16:07:12 2020, gautam, Update, PSL, Assembly underway for c1psl upgrade 
       Reply  Mon Jan 6 19:05:09 2020, not gautam, Update, PSL, Assembly underway for c1psl upgrade 
    Reply  Fri Jan 10 19:48:46 2020, yehonathan, Update, PSL, Assembly underway for c1psl upgrade 20200110_194429.jpg20200110_194516_HDR.jpg
       Reply  Mon Jan 13 16:05:18 2020, yehonathan, Update, PSL, Assembly underway for c1psl upgrade 
          Reply  Tue Jan 14 17:16:43 2020, yehonathan, Update, PSL, Assembly underway for c1psl upgrade 
             Reply  Wed Jan 15 10:12:46 2020, gautam, Update, PSL, Assembly underway for c1psl upgrade 
                Reply  Wed Jan 15 16:08:40 2020, not gautam, Update, PSL, Assembly underway for c1psl upgrade 
Entry  Wed Jan 15 14:10:28 2020, Jon, Configuration, PSL, New EPICS database for C1PSL + C1IOO 
Entry  Mon Jan 13 23:30:53 2020, Yehonathan, Summary, PSL, Changes made since Gautam left 
    Reply  Tue Jan 14 20:17:09 2020, gautam, Summary, General, IFO recovery DCerrors.png
       Reply  Wed Jan 15 10:04:19 2020, gautam, Summary, General, POX / POY locking restored singleArms.png
Entry  Mon Jan 13 15:47:37 2020, shruti, Configuration, Computer Scripts / Programs, c1psl burt restore 
Entry  Fri Jan 10 14:21:19 2020, Yehonathan, Update, PSL, c1psl reboot 
Entry  Tue Jan 7 18:51:51 2020, Jon, Update, PSL, New c1psl server assembled 
Entry  Mon Nov 4 19:02:25 2019, Yehonathan, Update, PSL, Mapping the PSL electronics PSL_Wirings_-_Sheet1_(1).pdf
    Reply  Tue Dec 17 00:23:28 2019, Yehonathan, Update, PSL, Mapping the PSL electronics PSL_Wirings_-_Sheet1_(2).pdf
       Reply  Tue Dec 17 18:05:06 2019, Yehonathan, Update, PSL, Mapping the PSL electronics PSL_Wirings_-_Sheet1_(3).pdf
          Reply  Fri Dec 20 18:33:21 2019, Yehonathan, Update, PSL, Mapping the PSL electronics PSL_Wirings_-_Channel_List.pdf
             Reply  Mon Dec 23 19:30:20 2019, Yehonathan, Update, PSL, Mapping the PSL electronics 
                Reply  Wed Jan 1 04:53:11 2020, gautam, Update, PSL, Mapping the PSL electronics 
                   Reply  Wed Jan 1 16:04:37 2020, Yehonathan, Update, PSL, Mapping the PSL electronics 
Entry  Wed Dec 11 15:01:57 2019, Jon, Summary, PSL, PMC cavity ringdown measurement IMG_0101.jpg
    Reply  Thu Dec 12 19:20:43 2019, Yehonathan, Update, PSL, PMC cavity ringdown measurement IMG_0105.jpegTEK00001.PNG20191212_151642.jpg
       Reply  Fri Dec 13 12:28:43 2019, Yehonathan, Update, PSL, PMC cavity ringdown measurement Ringdown_InitialProcess.pdf
          Reply  Tue Dec 17 20:45:30 2019, rana, Update, PSL, PMC cavity ringdown measurement 
          Reply  Fri Dec 27 15:01:02 2019, Yehonathan, Update, PSL, PMC cavity ringdown measurement PDAOMResponse.pdfPMCTransmission.pdfRingdownsAndRefs.pdfTwoExponentialFitAOM0.3V.pdf
             Reply  Tue Dec 31 03:03:02 2019, gautam, Update, PSL, PMC cavity ringdown measurement 
       Reply  Mon Dec 16 18:19:42 2019, shruti, Update, PSL, PMC cavity ringdown measurement : beat-note disruption IMG_0040.jpg
Entry  Tue Dec 10 15:17:17 2019, Yehonathan, Update, PSL, PMC is locked 
    Reply  Tue Dec 10 18:27:22 2019, Yehonathan, Update, PSL, PMC is locked 
       Reply  Wed Dec 11 15:29:17 2019, Yehonathan, Update, PSL, PMC is locked 
Entry  Fri Dec 6 17:49:46 2019, rana, Summary, PEM, Jump test of seismometers: EX needs recentering Seismometers.pdfsrc.tgz
    Reply  Sun Dec 8 20:15:41 2019, rana, Summary, PEM, Jump test of seismometers: EX needs recentering seis_all_191208.pdf
       Reply  Mon Dec 9 13:08:24 2019, Yehonathan, Summary, PEM, Jump test of seismometers: EX needs recentering seis_191208.pdf
Entry  Sun Dec 8 20:27:11 2019, rana, Update, Computers, Viviana upgrade to Ubuntu 16 
Entry  Fri Dec 6 15:22:01 2019, gautam, Frogs, LSC, DAFI system revived 
Entry  Tue Oct 8 18:35:09 2019, gautam, Update, LSC, Locking prep 
    Reply  Wed Oct 9 18:15:26 2019, gautam, Update, LSC, PRMI 3f locking PRMI_1f.png
       Reply  Wed Oct 9 22:02:58 2019, gautam, Update, LSC, REFL55 whitening issue 
          Reply  Thu Oct 10 01:12:56 2019, gautam, Update, LSC, Locking studies PRFPMIstudies.png
             Reply  Wed Oct 16 11:42:17 2019, gautam, Update, LSC, Poor separation of PRCL/MICH in 3f signals sensMat.pdf
                Reply  Thu Oct 17 11:19:28 2019, gautam, Update, LSC, Locking activity last night MICH2PRCLnulling.pdfconsolidatedSensingMatrices.pdf.zip
                   Reply  Tue Oct 22 00:52:27 2019, gautam, Update, LSC, Locking updates PRMI3f_ALS_Oct21sensMat.pdf
                      Reply  Tue Oct 29 01:24:45 2019, gautam, Update, LSC, More locking updates POP22_feature.pngPRMI3f_ALS_Oct21sensMat.pdf
                         Reply  Tue Oct 29 15:13:19 2019, gautam, Update, LSC, More locking updates PRMI_lockloss.png
                            Reply  Wed Oct 30 01:27:00 2019, gautam, Update, LSC, More locking updates POP_ASS.png
                               Reply  Wed Oct 30 11:53:41 2019, gautam, Update, LSC, MICH loop shape tuning MICH_ELP.pdfMICH_ELP_TFs.pdf
                               Reply  Wed Oct 30 17:08:40 2019, gautam, Update, LSC, POP22 investigation POP22anomaly.pdf
                                  Reply  Mon Nov 4 15:29:47 2019, gautam, Update, LSC, POP signal path POPchain.pdf
                                     Reply  Mon Nov 4 16:06:58 2019, gautam, Update, LSC, POP optical path IMG_8027.JPGlensRealignment.jpgPOPrealigned.pngPOPdither.pngPRMfixed.png
                                        Reply  Tue Nov 5 11:52:27 2019, gautam, Update, LSC, Locking notes PRMI3f_ALS_Nov4sensMat.pdf
                                           Reply  Wed Nov 6 02:08:48 2019, gautam, Update, LSC, Locking updates 
                                              Reply  Wed Nov 6 17:05:45 2019, gautam, Update, LSC, CARM calibration CARMscan.pdfCARMcalib.pdfscan.hdf5.zip
                                              Reply  Wed Nov 6 17:45:34 2019, gautam, Update, LSC, ~ 
                                                 Reply  Mon Nov 18 21:04:38 2019, gautam, Update, LSC, Locking - some ideas 
                                                    Reply  Wed Nov 20 01:07:18 2019, gautam, Update, LSC, Locking - progress PRFPMI.png
                                                       Reply  Wed Nov 20 12:14:17 2019, gautam, Update, LSC, Locking - progress TRX_TRY_comparison.pdf
                                                          Reply  Wed Nov 20 17:20:24 2019, Yehonathan, Update, LSC, QPD Investigation 
                                                             Reply  Wed Nov 20 17:52:00 2019, gautam, Update, LSC, QPD MEDM screen update newLookQPD.pngTRX_TRY_comparison.pdfIMG_8186.JPG
                                                                Reply  Wed Nov 20 21:29:28 2019, gautam, Update, LSC, PRG ~13 PRG13.pdf
                                                                   Reply  Fri Nov 22 00:54:14 2019, gautam, Update, LSC, locking notes ALSnoiseIncrease.pdf
                                                                      Reply  Mon Nov 25 19:11:22 2019, gautam, Update, LSC, ALS noise re-look ALSnoise.pdf
                                                                         Reply  Wed Nov 27 23:24:01 2019, gautam, Update, LSC, No shaking but no inspiration either 
                                                                            Reply  Sun Dec 1 13:38:48 2019, rana, Update, LSC, No shaking but no inspiration either 
                                                                               Reply  Tue Dec 3 00:03:57 2019, gautam, Update, LSC, Green ALS also shows elevated noise with high arm buildup ALSnoiseIncrease_greenBeat.pdf
                                                                                  Reply  Wed Dec 4 19:54:27 2019, gautam, Update, LSC, A look to the past DRFPMI_2016March.pdf
                                                                                     Reply  Thu Dec 5 01:54:39 2019, gautam, Update, LSC, Partial CM board path engaged AOengaged.pdf
                                                                                        Reply  Fri Dec 6 00:02:48 2019, gautam, Update, LSC, What is the correct way to set the 3f offsets? 
                                     Reply  Fri Nov 15 12:08:04 2019, gautam, Update, LSC, POPDC whitening board 
                         Reply  Tue Oct 29 17:40:48 2019, gautam, Update, LSC, More locking updates broadSweep.pdfzoomSweep.pdf
Entry  Thu Dec 5 18:15:01 2019, gautam, Update, Optical Levers, ITM, PRM and BS Oplevs re-centered 
Entry  Thu Dec 5 15:09:50 2019, gautam, Update, CDS, c1oaf crashed c1lsc SCYerrors.pngCDSnormal.png
Entry  Thu Dec 5 14:54:15 2019, gautam, Update, General, Symlink to SRmeasure and AGmeasure 
Entry  Thu Dec 5 08:44:44 2019, Gavin, Update, Loss Measurement, Q Measurements of Test Masses 20191205_132158.jpg
Entry  Fri Jun 8 14:40:55 2018, c1lsc, Update, CDS, i am dead 31.png
    Reply  Fri Jun 8 20:15:08 2018, gautam, Update, CDS, Reboot script 31.png
       Reply  Mon Jun 11 18:49:06 2018, gautam, Update, CDS, c1lsc dead again 36.png
       Reply  Wed Dec 4 09:11:42 2019, Yehonathan, Update, CDS, Reboot script medmScreen11.ps
          Reply  Wed Dec 4 12:13:10 2019, gautam, Update, CDS, Reboot script 
Entry  Wed Dec 4 08:54:07 2019, Yehonathan, Update, IMC, Mirror analog shaking 
Entry  Mon Dec 2 00:27:20 2019, gautam, Update, ALS, Green ALS resurrection ALSnoiseComparison.pdfALS_TR_RIN.pdfGreemAM.pdf
    Reply  Mon Dec 2 18:20:29 2019, gautam, Update, ALS, EY uPDH post mixer LPF EY_uPDH_LPF.pdfEY_uPDH_OLTF.pdf
       Reply  Mon Dec 2 20:18:18 2019, rana, Update, ALS, EY uPDH post mixer LPF 
          Reply  Tue Dec 3 18:15:42 2019, gautam, Update, ALS, EY uPDH post mixer LPF 
             Reply  Tue Dec 3 21:28:24 2019, gautam, Update, ALS, EY uPDH post mixer LPF uPDH.pdf
       Reply  Tue Dec 3 00:10:15 2019, Koji, Update, ALS, EY uPDH post mixer LPF 
          Reply  Tue Dec 3 00:51:25 2019, gautam, Update, ALS, EY uPDH post mixer LPF 
Entry  Tue Dec 3 20:32:37 2019, rana, Omnistructure, DAQ, NDS2 situation getData.pychanlist.txt
Entry  Wed Nov 27 18:51:22 2019, Gavin Wallace, Update, IMC, Q Measurement of Test Masses 
    Reply  Tue Dec 3 14:52:13 2019, rana, Update, IMC, Q Measurement of Test Masses 
Entry  Mon Dec 2 23:01:47 2019, gautam, Update, CDS, Frequent DTT crashes on pianosa DTTerrorLog.tgz
Entry  Wed Nov 27 17:51:52 2019, gautam, Update, Wiener, MCL FF status MCL_FF.pdfPRC_FF.pdf
Entry  Tue Nov 26 17:07:41 2019, gautam, Update, LSC, POX / POY calibration POX_POY_sensorNoise.pdfALSnoise_20191125.pdf
    Reply  Tue Nov 26 18:16:08 2019, rana, Update, LSC, POX / POY calibration 
       Reply  Wed Nov 27 12:16:52 2019, gautam, Update, LSC, ITMX and ITMY OSEMs with low and high circulating power ITMXshadowSensors.pdfITMYshadowSensors.pdf
          Reply  Wed Nov 27 13:14:02 2019, rana, Update, LSC, ITMX and ITMY OSEMs with low and high circulating power 
             Reply  Wed Nov 27 16:10:29 2019, gautam, Update, LSC, AOM reconnected 
Entry  Tue Nov 26 13:33:33 2019, Yehonathan, Update, Cameras, MC2 Camera rotated by 90 degrees MC2AnalogCameraAfter.jpgMC2AnalogCameraBefore.jpg
Entry  Mon Nov 25 22:10:26 2019, shruti, Update, NoiseBudget, Diagnostics  LSC.pdfITMY.pdfITMX_L.pdf
Entry  Thu Nov 21 12:46:22 2019, gautam, Update, LSC, CM board study YARM_CMslow.pdf
    Reply  Thu Nov 21 13:14:33 2019, Koji, Update, LSC, CM board study 
       Reply  Thu Nov 21 19:08:58 2019, gautam, Update, LSC, High BW lock of Y arm length to PSL frequency highBW_POY.pdfCM_UGF.pdfIN2_ACcoupling.pdf
Entry  Tue Oct 8 08:08:18 2019, gautam, Update, PEM, PEM BLRMS anomaly PEManomaly.png
    Reply  Wed Oct 23 11:49:21 2019, gautam, Update, PEM, PEM BLRMS anomaly seisAll_20191021.pdfspecGrams.zip
       Reply  Thu Oct 24 18:37:15 2019, gautam, Update, PEM, T240 checkout 
          Reply  Tue Nov 5 12:37:50 2019, gautam, Update, PEM, T240 interface unit pulled out T240_recenter.pdfffPotential.pdf
             Reply  Wed Nov 13 19:34:45 2019, gautam, Update, PEM, Follow-up on seismometer discussion seisAll_20191111.pdfffPotential.pdf
                Reply  Wed Nov 13 20:15:56 2019, rana, Update, PEM, Follow-up on seismometer discussion 
                   Reply  Wed Nov 13 23:40:15 2019, gautam, Update, PEM, Follow-up on seismometer discussion seisAll_20191111_1Hz.pdf
                      Reply  Thu Nov 14 12:11:04 2019, rana, Update, PEM, Follow-up on seismometer discussion 
                      Reply  Fri Nov 15 00:18:41 2019, rana, Update, PEM, Follow-up on seismometer discussion MCshake.pdf
                         Reply  Fri Nov 15 12:16:48 2019, gautam, Update, PEM, Follow-up on seismometer discussion BS_ZspecGram.pdf.zip
                            Reply  Mon Nov 18 14:32:53 2019, gautam, Update, PEM, Follow-up on seismometer discussion 
                               Reply  Tue Nov 19 21:53:57 2019, gautam, Update, PEM, Follow-up on seismometer discussion seisxSpec.pdf
Entry  Tue Nov 19 15:08:48 2019, gautam, Update, CDS, Vertex models rebooted armSat.png
Entry  Fri Nov 15 18:59:08 2019, rana, Update, Computers, ZITA: started upgrade from Ubuntu 14 LTS to 18 LTS 
    Reply  Mon Nov 18 16:32:15 2019, gautam, Update, Computers, ZITA: started upgrade from Ubuntu 14 LTS to 18 LTS 
Entry  Mon Nov 4 11:41:28 2019, shruti, Update, Computer Scripts / Programs, Epics installed on donatella 
    Reply  Thu Nov 7 17:55:37 2019, shruti, Update, Computer Scripts / Programs, Python packages on donatella 
Entry  Fri Oct 18 20:21:33 2019, shruti, Update, ALS, AM measurement attempt at X end 
    Reply  Thu Nov 7 17:46:10 2019, shruti, Update, ALS, AM measurement at X end AMTF20191107.png
Entry  Mon Sep 12 23:54:10 2011, kiwamu, Update, IOO, EOM resonant box installed EOM.pngbefore.pngafter.png
    Reply  Wed Nov 6 20:34:28 2019, Koji, Update, IOO, Power combiner loss (EOM resonant box installed) power_combiner.pdf
Entry  Wed Nov 6 19:26:57 2019, gautam, Update, PSL, Some PSL cable admin PSLcableAdmin.jpg
Entry  Sat Nov 2 16:36:55 2019, Yehonathan, Update, PSL, Up to date sketch of the 1x1 and 1x2 Eurocrates 1x1_1X2_Eurocrates_with_links.pdf
    Reply  Sat Nov 2 17:08:34 2019, Yehonathan, Update, PSL, Up to date sketch of the 1x1 and 1x2 Eurocrates 
       Reply  Mon Nov 4 13:26:04 2019, Yehonathan, Update, PSL, Up to date sketch of the 1x1 and 1x2 Eurocrates 
Entry  Thu Oct 31 10:44:40 2019, gautam, Update, PSL, PMC re-locked 
Entry  Wed Oct 30 19:20:27 2019, gautam, Update, SUS, PRM suspension issues PRMUL.pdfPRMnormal.pdfPRM-Sensors_noise.pdfPRMsuspensionWonky.png
    Reply  Wed Oct 30 23:12:27 2019, Koji, Update, SUS, PRM suspension issues 
Entry  Mon Oct 21 12:25:46 2019, gautam, Update, ALS, DFD electronics checkout ALSnoiseAnomaly.pdfDFDcalib.pdfspectra.pdfPTgains.pdf
    Reply  Tue Oct 22 15:32:15 2019, gautam, Update, ALS, EX uPDH electronics checkout uPDH_X_OLTFs.pdf
       Reply  Wed Oct 23 10:23:26 2019, rana, Update, ALS, EX uPDH electronics checkout 
          Reply  Wed Oct 23 11:11:01 2019, gautam, Update, ALS, EX uPDH electronics checkout 
    Reply  Fri Oct 25 01:04:49 2019, gautam, Update, ALS, ALS electronics chain was saturating 
       Reply  Mon Oct 28 23:20:11 2019, gautam, Update, ALS, ALS power budget 
Entry  Thu Oct 24 11:58:16 2019, gautam, Update, ASC, PRC angular feedforward ffPotential.pdf
Entry  Wed Oct 23 18:40:58 2019, gautam, Update, CDS, another round of vertex FE reboots 
Entry  Thu Oct 17 16:49:53 2019, gautam, Update, ASC, PRMI ASC - first pass PRMI_ASC.pdf
    Reply  Tue Oct 22 17:35:30 2019, gautam, Update, ASC, PRMI ASC - first pass originalPOP_QPD.pngPOP_QPD_modified.png
       Reply  Wed Oct 23 11:14:21 2019, gautam, Update, ASC, PRMI ASC with QPD signals normalized. PRMI_ASC_normalization.pdfPRMI_ASC_Oct22.pdf
Entry  Fri Oct 18 17:35:07 2019, gautam, Update, SUS, ETMX sat box disconnected 
    Reply  Mon Oct 21 16:02:21 2019, gautam, Update, SUS, ETMX over the weekend filteredData.pdf
Entry  Fri Oct 18 18:13:55 2019, Koji, Update, safety, Laser interlock looks OK 
    Reply  Mon Oct 21 11:44:19 2019, gautam, Update, safety, Interlock reconnected to Innolight controller 
Entry  Thu Oct 17 12:34:51 2019, gautam, Update, General, Daytime wishlist DriftingTTs.pngFSSweirdness.png
Entry  Mon Oct 14 17:24:28 2019, gautam, Update, General, Workstation computers taken off UPS (temporarily) 
    Reply  Tue Oct 15 17:22:26 2019, gautam, Update, General, Workstation computers back on UPS  
ELOG V3.1.3-