Entry  Tue Sep 8 19:36:52 2009, Jenne, Omnistructure, DMF, DMF restarted 
I (think I) restarted DMF.  It's on Mafalda, running in matlab (not the complied version which Rana was having trouble with back in the day). 
To start Matlab, I did "nohup matlab", ran mdv_config, then started seisBLRMS.m running.  Since I used nohup, I then closed the terminal
window, and am crossing my fingers in hopes that it continues to work.  I would have used Screen, but that doesn't seem to work on Mafalda.
    Reply  Tue Sep 8 20:25:03 2009, Jenne, Omnistructure, DMF, DMF restarted 


    
        
            Quote:
        
        
            
            I (think I) restarted DMF.  It's on Mafalda, running in matlab (not the complied version which Rana was having
Entry  Tue Sep 8 17:57:30 2009, Jenne, Update, PEM, All the Acc/Seis working again 
All of the accelerometers and seismometers are plugged in and functional again.  The cables to the back of the accelerometer preamp board (sitting
under the BS oplev table) had been unplugged, which was unexpected.  I finally figured out that that's what the problem was with half of the accelerometers,
plugged them back in, and now all of the sensors are up and running.
Entry  Tue Sep 8 16:01:52 2009, steve, Configuration, VAC, RGA was separeted from IFO vm1closed.jpg
The RGA isolation valve VM1 was closed since Aug 24, 2009  I installed the new UPS that time.
The last RGA scan in the log is from Aug 7, 2009   The vacuum rack UPS failed on Aug 15, 2009
I opened VM1 today so we can have ifo rga scan tomorrow.
Entry  Fri Aug 14 10:39:50 2009, josephb, Configuration, Computers, Raid update to Framebuilder (specs) 
The RAID array servicing the Frame builder was finally switched over to JetStor Sata 16 Bay raid array. Each bay contains a 1 TB drive.  The raid
is configured such that 13 TB is available, and the rest is used for fault protection.
The old Fibrenetix FX-606-U4, a 5 bay raid array which only had 1.5 TB space, has been moved over to linux1 and will be used to store /cvs/cds/.
    Reply  Tue Aug 25 01:27:09 2009, rana, Configuration, Computers, Raid update to Framebuilder (not quite) 


    
        
            Quote:
        
        
            
            The RAID array servicing the Frame builder was finally switched over to JetStor Sata 16 Bay raid array. Each bay contains
       Reply  Tue Sep 8 15:14:26 2009, rana, alex, Configuration, DAQ, RAID update to Framebuilder: directories added + lookback increased 
 Alex logged in around 10:30 this morning and, at our request,
adjusted the configuration of fb40m to have 20 days of lookback. 
I wasn't able to get him to elog, but he did email the procedure to us:
Entry  Tue Sep 8 12:26:16 2009, Alberto, Update, PSL, Connection of the RC heater's power supply replaced 
I have replaced the temporary clamps that were connecting the RC heater to its power supply with a new permanent
connection.
In the IY1 rack, I connected the control signal of the RC PID temperature servo - C1:PSL-FSS_TIDALSET - to the input of the RC heater's power supply.
Entry  Mon Sep 7 23:51:48 2009, rana, Configuration, Computers, matlab installed: 64-bit linux 
I have wiped out the 2008a install of 64-bit linux matlab and installed 2009a in its place. Enjoy.
Entry  Thu Aug 27 14:00:33 2009, rana, Update, PSL, RC thermal servo impulse response Untitled.png
I stepped the TIDALSET and looked at what happened. Loop was closed with the very low gain.
The RED guy tells us the step/impulse response of the RC can to a step in the heater voltage.
The GREY SLOWDC tells us how much the actual glass spacer of the reference cavity lags the outside can temperature.
    Reply  Mon Sep 7 20:05:18 2009, rana, Update, PSL, RCTEMP v. RMTEMP rct2.pngrct.png
Since ~Aug. 27, the reference cavity has been running with no thermal control. This is not really a problem at the 40m; a 1 deg change of the glass cavity
will produce a 5 x 10-7 strain in the arm cavity. That's around 20 microns of length change.
This open loop time gave us the opportunity to see how good our cavity's vacuum can insulation is.
    Reply  Mon Sep 7 23:35:03 2009, rana, Update, PSL, RC thermal servo: PID script modified, database + screen added Untitled.png
I have added the records for the RC thermal PID servo into the psl/slowpid.db file which also holds the records for the SLOW servo that uses the NPRO-SLOW
to minimize the NPRO-FAST. This new database will take effect upon the next PSL boot.
The perl script which runs the servo is scripts/PSL/FSS/RCthermalPID.pl. Right now it is using hard-coded PID parameters - I will modify
Entry  Mon Sep 7 23:18:01 2009, Alberto, Update, Locking, Some locking attempts 
Tried to lock the interferometer but arm power didn't get over 65.
Tonight, after the weekend, I resumed the work on locking.
When I started the Mode Cleaner was unlocked because the MZ was also unlocked.
Entry  Thu Sep 3 23:41:32 2009, Alberto, Configuration, LSC, POX (PD3) aligned 
Today I aligned the beam to PD3 (POX) since Steve had moved it.
The DC power read 1.3mV when the beam was on the PD.
Entry  Tue Sep 1 11:23:36 2009, steve, Update, General, electrical ground ground.JPG
I was told yesterday, that on Friday the construction people accidentally ripped out one of the 40m soil ground.....AND HOW MANY MORE ARE THERE? nobody
knows.
It was ~8 ft long and 0.5" diameter buried in the ground. There is no drawing found to identify this exact building ground. They promised
    Reply  Thu Sep 3 11:20:26 2009, steve, Update, General, electrical ground in place Gs-n.JPGnewground.JPG


    
        
            Quote:
        
        
            
            I was told yesterday, that on Friday the construction people accidentally ripped out one of the 40m soil ground.....AND
Entry  Thu Sep 3 10:19:35 2009, steve, alberto, Update, PEM, particle counts and burning hillsides fire6d.jpg40mgarden.JPG40mgarden2.JPGRBLOG-FIRE-SKY.JPG
The San Gabriel mountain has been on fire for  6 days. 144,000 acres of beautiful hillsides burned down and it's still burning.  Where
the fires are.
Entry  Fri Aug 28 15:30:15 2009, steve, Configuration, General, POX rfpd removed 
I removed POX rfpd to see how it is mounted on its base. It is here on the work bench just in case someone wants to use it the IFO over the week end.
    Reply  Tue Sep 1 13:52:06 2009, steve, Configuration, General, POX rfpd is back & needs alignment 


    
        
            Quote:
        
        
            
            I removed POX rfpd to see how it is mounted on its base. It is here on the work bench just in case someone wants to
Entry  Fri Aug 28 12:56:17 2009, Yoichi, Update, Locking, RF CARM hand off problem 
Last night,  the lock script proceeded to the RF CARM hand-off about half of the time.
However, the hand off was still unsuccessful.
    Reply  Fri Aug 28 13:49:07 2009, rob, Update, Locking, RF CARM hand off problem 
[quote]Last night,  the lock script proceeded to the RF CARM hand-off about half of the time.
However, the hand off was still unsuccessful.
Entry  Thu Aug 27 16:14:28 2009, steve, Summary, OMC, burned photodiode 20090827_173252.jpg20090827_170802.jpg
Old -pre 6/2009  LLO DCPD 3 mm od GTRAN photodiode
Entry  Wed Aug 26 19:58:14 2009, Rana, Alberto, Update, PSL, Reference Cavity Temperature Control: MINCO PID removed rc.png
Summary: This afternoon we managed to get the temperature control of the reference cavity working again.
We bypassed the MINCO PID by connecting the temperature box error signal directly into EPICS.
We couldn't configure the PID so that it worked with the modified temperature box so we decided to just avoid using it.
    Reply  Thu Aug 27 13:42:08 2009, rana, Summary, PSL, Reference Cavity Temperature Control: psl.db changes 
I made the changes to the psl.db to handle the new Temperature box hardware. The
calibrations (EGUF/EGUL) are just copied directly from the LHO .db file (I have rsync'd their entire target area to here).
allegra:c1psl>diff psl.db~ psl.db
Entry  Thu Aug 27 12:34:48 2009, Yoichi, Update, Locking, up to arm power 70 
Last night, I tried to run locking scripts.
The power went up to 70 a couple of times .
Then it failed to switch to RF CARM.
Entry  Tue Aug 25 11:02:39 2009, rana, Summary, PSL, Temperature Box D980400-B.pdf
The PSL Temperature Box (D980400-B-C, what kind of numbering scheme is that?) modified at LHO/LLO ~8 years ago to have better resolution on the in-loop
temperature sensors.
I haven't been able to find a DCN / ECN on this, but there's an elog entry from Hugh Radkins here. 
    Reply  Tue Aug 25 18:42:42 2009, steve, Update, PSL, reference cavity temp box temporarly out of order 


    
        
            Quote:
        
        
            
            The PSL Temperature Box (D980400-B-C, what kind of numbering scheme is that?) modified at LHO/LLO ~8 years ago to have
       Reply  Tue Aug 25 21:36:28 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 2009-08-25_PSLtrend.png
 
 Is that the reason of the PSL craziness tonight? See attachment.
       Reply  Tue Aug 25 21:55:11 2009, rana, Update, PSL, reference cavity temp box temporarly out of order Untitled.pngrc-heater.jpg
There's no elog entry about what work has gone on today, but it looks like Peter took apart the reference cavity temperature control around 2PM.
I touched the reference cavity by putting my finger up underneath its sweater and it was nearly too hot to keep my finger in there. I looked at
the heater power supply front panel and it seems that it was railed at 30 V and 3 A. The nominal value according to the sticker on the front is 11.5 V
          Reply  Wed Aug 26 15:42:17 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 


    
        
            Quote:
        
        
            
            There's no elog entry about what work has gone on today, but it looks like Peter took apart the reference cavity temperature
             Reply  Wed Aug 26 16:11:41 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 
It turned out that half an hour was too long. In less than that the reference cavity temperature passed the critical point when the temperature controller
(located just below the ref cav power supply in the same rack) disables the input power to the reference cavity power supply.
The controller's display in the front shows two numbers. The first goes with the temperature of the reference cavity; the second is a threshold
                Reply  Wed Aug 26 16:31:34 2009, steve, Update, PSL, reference cavity temp box temporarly out of order 


    
        
            Quote:
        
        
            
            It turned out that half an hour was too long. In less than that the reference cavity temperature passed the critical
Entry  Wed Aug 26 14:45:14 2009, steve, Update, PSL, PSL-FSS_RCTEMP of 4 years refcavtemp.jpg
The reference cavity vacuum chamber temp is plotted starting Feb 22 of 2005
This plot suggest that the MINCO temp controller is not working properly.
Entry  Tue Aug 25 23:16:09 2009, Alberto, rana, Configuration, Computers, elog moved in to the cvs path 
In nodus, I moved the elog from /export to /cvs/cds/caltech. So now it is in the cvs path instead of a local directory on nodus.
For a while, I'll leave a copy of the old directory containing the logbook subdirectory where it was. If everything works fine, I'll delete that.
I also updated the reboot instructions in the wiki. some of it also is now in the SVN.
Entry  Tue Aug 25 21:26:12 2009, Alberto, Update, Computers, elog restarted 
I just found the elog down and I restarted it.
Entry  Tue Aug 25 03:30:23 2009, Yoichi, Summary, WIKI-40M Update, Green lock and phase noise PhaseNoise.png
While Koji and I were discussing about the green laser lock, we wondered if the common motion of the cavity mirrors,
which won't be suppressed by the green laser servo, will cause any problem to the locking.
Entry  Tue Aug 25 02:37:53 2009, rana, Configuration, Computer Scripts / Programs, Firefox 3.5 installed for 64 bit linux in apps/ DSC_0620.JPG
 
Entry  Fri Aug 21 18:37:16 2009, Jenne, Update, General, Transfer function of Mode Cleaner Stacks TF_osems_guralps.png
Using free-swinging Mode Cleaner OSEM data and Guralp seismometers, I have taken transfer functions of the Mode Cleaner stacks.
During this experiment, the MC was unlocked overnight, and one Guralp seismometer was underneath each chamber (MC1/MC3, and MC2).  Clara will
let me know what the orientation of the seismometers were (including which seismometer was underneath which chamber and what direction the seismometer
    Reply  Tue Aug 25 00:35:04 2009, rana, Update, General, Transfer function of Mode Cleaner Stacks Untitled.png
Looks like all of the accelerometers and seismometers have been disconnected since early AM last Monday when Clara disconnected them for her sensor noise
measurement.
Entry  Fri Aug 7 16:14:57 2009, rob, Omnistructure, VAC, UPS failed 
Steve, Rana, Ben, Jenne, Alberto, Rob
 
UPS in the vacuum rack failed this afternoon, cutting off power to the vacuum control system.  After plugging all the stuff that had been
    Reply  Fri Aug 7 19:34:40 2009, steve, Summary, VAC, UPS failed 
The Maglev is running on single phase 220V and that voltage  was not interrupted. TP1 was running undisturbed with V1 and V4 closed.
It is independent of the UPS 120V.
    Reply  Sat Aug 15 18:57:48 2009, rana, Update, VAC, UPS failed 
As Rob noted last Friday, the UPS which powers the Vacuum rack failed. When we were trying to move the plugs around to debug it, it made a sizzling sound
and a pop. Bad smells came out of it.
Ben came over this week and measured the quiescent power consumption. The low power draw level was 11.9 A and during the reboot its 12.2 A. He
       Reply  Mon Aug 24 16:48:57 2009, steve, HowTo, VAC, new UPS installed 


    
        
            Quote:
        
        
            
            As Rob noted last Friday, the UPS which powers the Vacuum rack failed. When we were trying to move the plugs around
Entry  Mon Aug 24 10:43:27 2009, Alberto, Omnistructure, Computers, RFM Network Failure 
This morning I found that all the front end computers down. A failure of the RFM network drove all the computers down.
I was about to restart them all, but it wasn't necessary. After I power cycled and restarted C1SOSVME all the other computers and RFM network came
back to their green status on the MEDM screen. After that I just had to reset and then restart C1SUSVME1/2.
Entry  Fri Aug 21 17:49:47 2009, Yoichi, Summary, Computers, Upgrade FE conceptual plan Picture_2.png
I started to draw a conceptual diagram of the upgraded FE system.
http://nodus.ligo.caltech.edu:30888/FE/FE-Layout.html
(It takes some time to load the page for the first time)
Entry  Fri Aug 21 17:28:50 2009, Kevin, rana, Summary, PEM, Magnetic Field Measurements Around the Lab AC-field.pngDC-field.png






                       


This goal of this test was to measure and map the AC (at 60 Hz) and DC magnetic fields around the interferometer.
Entry  Fri Aug 21 17:05:04 2009, Jenne, Update, General, restarted the elog 
[Kevin, Jenne]
Kevin's awesome final report/elog entry was so awesome that it crashed the elog.  It has been restarted.  We're going to put his pictures
and documentation in the wiki, with a link from the elog to prevent re-crashing.
Entry  Wed Aug 19 02:17:52 2009, rana, Omnistructure, Environment, Control Room Workstation desks lowered to human height 
There were no injuries...Now we need to get some new chairs.
    Reply  Thu Aug 20 09:16:32 2009, steve, HowTo, Photos, Control Room Workstation desks lowered to human height P1040788.pngP1040782.pngP1040786.pngP1040789.pngP1040785.png


    
        
            Quote:
        
        
            
            There were no injuries...Now we need to get some new chairs.
Entry  Wed Aug 19 23:57:35 2009, rob, Update, Locking, report 
 
locking work proceeding apace tonight.
diagonalized DRM with setDDphases & senseDRM. 
Entry  Wed Aug 19 18:02:22 2009, Jenne, Update, LSC, RF PDs aligned 
All of the LSC RF PDs have been aligned.  I didn't really change much of anything, since for all of them, the beam was already pretty close to center. 
But they all got the treatment of attaching a Voltmeter to the DC out, and adjusting the steering mirror in both pitch and yaw, finding where you fall
off the PD in each direction, and then leave the optic in the middle of the two 'edges'.
Entry  Tue Aug 18 15:52:27 2009, Jenne, Update, PSL, MZ 
I tweaked up the MZ alignment.  The reflection had been around 0.550, which kept the MEDM indicator green, but was still too high.  I fiddled
with BS1, and a little bit with BS2.  When I had the doors of the PSL table open, I got as low as 0.320.  When I closed up and came back to the
control room, the MZ refl had drifted up to 0.354.  But it's good again now.
In
    Reply  Tue Aug 18 19:57:47 2009, rana, Jenne, Update, PSL, MZ MZ_RFAMmon_setup_small.jpgMZ_RFAMmon_SpecAnalyzer_small.jpgMZ_EOM_IRrefl2_small.jpg
- we finished the MZ alignment; the contrast is good.
- we did the RFAM tuning using a new technique: a bubble balanced analyzer cube and the StochMon RFPD. This techniques worked well and there's
basically no 33 or 166 RFAM. The 133 and 199 are as expected.
       Reply  Wed Aug 19 17:11:33 2009, Jenne, Update, IOO, QPDs aligned 


    
        
            Quote:
        
        
            
             
Entry  Tue Aug 18 15:16:15 2009, rob, Update, IOO, MC WFS working again 
Rob, Yoichi
 
The MC WFS have apparently been bad for a few days, causing the MC alignment to drift away at DC.  We tried a few things to fix it, including
Entry  Tue Aug 18 14:24:43 2009, Yoichi, Summary, PSL, Reference Cavity Inspection 
Rana, Koji, Yoichi

To see why the reflected beam from the RC is distorted, we took out
Entry  Tue Aug 18 01:16:01 2009, Jenne, Update, PSL, Mach Zehnder is realigned MachZehnderOptics2.pdf
The Mach Zehnder and I got to know each other today.  The reason for redoing the alignment was to improve pointing from the PSL table into the MC/IFO
in hopes that this would solve the MC unlocking problems that we've been having lately.  Since Rana had aligned the IOO QPDs a few weeks ago when
all of the alignments and things were good, I used them as a reference for my Mach Zehnder alignment activities. 
Entry  Mon Aug 17 09:52:04 2009, rob, Summary, General, conlogger restarted 
I restarted the conlogger on op340m.  This needs to be done when op340m is rebooted--it wasn't done for some reason and so we've lost several days
of controls records.
    Reply  Mon Aug 17 17:43:11 2009, rana, Summary, General, conlogger restarted 
Added the conlog directory to the SVN, minus the enormous data directory. We are now free to make changes to the conlog code.
    Reply  Mon Aug 17 17:48:49 2009, rob, Summary, General, conlogger restarted 


    
        
            Quote:
        
        
            
            I restarted the conlogger on op340m.  This needs to be done when op340m is rebooted--it wasn't done for some reason
Entry  Mon Aug 17 07:01:09 2009, Clara, Update, PEM, ADC noiseness 
I shorted the inputs on three channels and the outputs on three channels of the Guralp box, and I did similar things with the accelerometers. I was going
to move the instruments themselves back, but I didn't have time, so they are still in the box in the corner. If the setup could stay as-is for at least
a few hours, that would be awesome.
Entry  Mon Aug 17 02:05:49 2009, Yoichi,rana, Update, PSL, Reference cavity reflection looks bad P8170113.JPGUntitled.png
Rana, Yoichi

It has been a well known fact that the reference cavity reflection beam looks ugly.
    Reply  Mon Aug 17 04:16:13 2009, Yoichi, Update, PSL, Reference cavity reflection looks bad 
[quote]Rana, Yoichi
- We also moved the Refcav reflection camera to look at the leakage through a reflection steering mirror so that there's less chance of distortion. There
was previously a W1 window in there as a pickofff. Also changed the camera to autogain so that we can see something.
Entry  Mon Aug 17 02:12:53 2009, Yoichi, Summary, Computers, FE bootfest 
Rana, Yoichi

All the FE computers went red this evening.
Entry  Sat Aug 15 22:50:18 2009, Clara, Update, Locking, Mode Cleaner is out of lock again MC_trans.png
It was fine when I came in earlier today, but I just got back from dinner, and it's not good. I looked in dataviewer, and it seems to have been sliding
out for the past couple of hours... Here is a picture:
    Reply  Sun Aug 16 04:33:11 2009, Clara, Update, Locking, Mode Cleaner is out of lock again 


    
        
            
            Quote:
            
        
        
            
            It
Entry  Sat Aug 15 18:35:14 2009, Clara, Frogs, Computers, How far back is complete data really saved? (or, is the cake a lie?) 
I was told that, as of last weekend, we now have the capability to save full data for a month, whereas before it was something like 3 days. However,
my attempts to get the data from the accidentally-shorted EW2 channel in the Guralp box have all been epic failures. My other data is okay, despite my
not saving it for several days after it was recorded. So, my question is, how long can the data actually be saved, and when did the saving capability change?
Entry  Fri Aug 14 14:19:25 2009, Koji, Summary, Computers, nodus rebooted 
nodus was rebooted by Alex at Fri Aug 14 13:53. I launched elogd.
cd /export/elog/elog-2.7.5/
./elogd -p 8080 -c /export/elog/elog-2.7.5/elogd.cfg -D
    Reply  Fri Aug 14 14:33:51 2009, Jenne, Summary, Computers, nodus rebooted 


    
        
            Quote:
        
        
            
            nodus was rebooted by Alex at Fri Aug 14 13:53. I launched elogd.
       Reply  Fri Aug 14 15:20:42 2009, josephb, Summary, Computers, Linux1 now has 1.5 TB raid drive 


    
        
            Quote:
        
        
            
            
            
  
          Reply  Fri Aug 14 15:32:50 2009, Yoichi, HowTo, Computers, nodus boot procedure 
The restart procedures for the various processes running on nodus are explained here:

http://lhocds.ligo-wa.caltech.edu:8000/40m/Computer_Restart_Procedures#nodus
             Reply  Sat Aug 15 10:36:02 2009, Alan, HowTo, Computers, nodus boot procedure 
[quote]The restart procedures for the various processes running on nodus are explained here:

http://lhocds.ligo-wa.caltech.edu:8000/40m/Computer_Restart_Procedures#nodus
Entry  Sat Aug 15 05:08:55 2009, Yoichi, Update, Locking, Friday night locking 
Summary: DD hand off fails for DRFPMI.

Tonight, I did a lot of house keeping work.
Entry  Fri Aug 14 23:45:14 2009, Chris, Update, General, Long Range Readout Table_Setup.pngEllipse.jpgCircle.jpg
The EUCLID-style Michelson readout is on the SP table now and is aligned.  See image below.  I took several power spectra with the plotter
attached to the HP3563 (not sure if there's another way to get the data out) and I'm still waiting to calibrate (since dP/dL isn't constant as it isn't
locked, this is taking a bit longer).  When put into XY mode on the oscilliscope (plotting Voltage at PD2 on the x and Voltage at PD3 on the y), a
Entry  Fri Aug 14 18:33:02 2009, Clara, Update, , Record of Accelerometer and Seismometer Movements 
Rather than make a new elog post every time I move something, I'm going to just keep updating this Google spreadsheet, which ought to republish every
time I change it. It's already got everything I've done for the past week-ish. The spreadsheet can be accessed here,
as a website, or here, as a pdf. I will still post something
Entry  Fri Aug 14 15:29:43 2009, Jenne, Update, Computers, c1susvme2 was unmounted from /cvs/cds 
When I came in earlier today, I noticed that c1susvme2 was red on the DAQ screens.  Since the vme computers always seem to be happier as a set,
I hit the physical reset buttons on sosvme, susvme1 and susvme2.  I then did the telnet or ssh in as appropriate for each computer in turn. 
sosvme and susvme1 came back just fine. However, I couldn't cd to /cvs/cds/caltech/target/c1susvme2 while ssh-ed in to susvme2.  I could cd to /cvs/cds,
Entry  Fri Aug 14 02:57:46 2009, Clara, Update, PEM, Redo of the Huddle Test 
I put all three seismometers and all six accelerometers together in the foam box with peanuts. Three of the accelerometers are facing in the x-direction
and three are in the y-direction. Both Guralps are aligned on the NS axis and the Ranger is pointing vertically.
**EDIT: The accelerometers are in the x and z directions, not x and y. Sorry, I was sleepy when I wrote
Entry  Thu Aug 13 22:53:48 2009, Yoichi, Configuration, PSL, FSS nominal common gain changed, MC WFS centered 
Koji, Yoichi
We found that the FSS PC feedback easily goes crazy (saturated).
It was because the common gain was too low. Probably the recent
decrease of the
laser power is responsible for this.
We increased the nominal value of the common gain from 12 to 16.5.
The
Entry  Thu Aug 13 11:20:43 2009, janosch, HowTo, PEM, three-channel self-noise estimation 
There are two new Matlab files on the svn in /mDV/extra/C1. 'mycsd.m' is to calculate the cross-spectral density between two channels, 'csd_40T_40T_SS1.m'
calls this function with the available seismic channels and derives a self-noise spectrum for the vertical axis using all three seismometers. The method
requires that there are no correlations between two instruments only which is a bad idealization for certain frequencies if you have seismometers of totally
Entry  Thu Aug 13 00:11:43 2009, Jenne, Update, IOO, Mode Cleaner Unlock 
So that I can collect a bit of free-swinging Mode Cleaner data, I started a script to wait 14400 seconds (4 hours), then unlock the mode cleaner. 
It should unlock the MC around 4am.  As soon as someone gets in in the morning, you can relock it. 
I should have plenty of data by then.
    Reply  Thu Aug 13 09:22:06 2009, rana, Update, PEM, ranger 
Rana, Jan, Jenne
We noticed that the Ranger data was all bogus at low frequencies. So we checked it and found that the proper procedure had not been used when changing
it from horizontal to vertical last week. So the huddle test data from the weekend is not valid for the ranger; we will have to repeat it sometime.