40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 139 of 344  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  12347   Thu Jul 28 13:49:44 2016 gautamUpdateGeneralETMX magnets re-reglued


 ETMX_sideMagnet.JPGETMX_sideMagnet_zoomed.JPG 
  12348   Thu Jul 28 16:43:01 2016 LydiaUpdateGeneralETMX aluminium standoff groove condition 

I took some pictures with the digital
microscope of the aluminum standoffs
 wire_damage_4.jpgwire_damage_zoom.jpgno_wire.jpgcomparison_2.jpg 
  12349   Thu Jul 28 17:48:17 2016 gautamUpdateGeneralETMY LR magnet broke offWhile ETMX magnets were curing, I wanted
to try and suspend ETMY in the endchamber,
put in the OSEMS and see if the magnets aligned
  
  12350   Thu Jul 28 22:43:03 2016 ranaUpdateGeneralETMY UL magnet broke offI'd recommend replacing the wire and
grinding down the clamp to prevent cutting
the wire. Since we have almost never replaced
  
  12351   Fri Jul 29 03:32:30 2016 ericqUpdateGeneralETMX suspended once more[gautam, ericq]

Tonight's progress on ETMX:


All pickle pickers removed
  
  12354   Fri Jul 29 13:17:34 2016 KojiUpdateGeneralOvenWhile the air bake oven situation is being
improved, how about to buy a cheepo toaster
oven at Target, BestBuy, or anywhere?
  
  12358   Sun Jul 31 17:28:38 2016 ranaOmnistructureGeneralupcleanI cleaned up the south Electronics bench
today.

The other two, as well as several
  
  12360   Mon Aug 1 18:50:29 2016 AakashUpdateGeneralAcromag Setup | SURF2016There were many unknown and unsolved problems
with using modbusApp for linux-arm architecture.
So I tried to install the necessary files
 7x 
  12364   Wed Aug 3 10:52:03 2016 SteveUpdateGeneralETMY soaking dishETMY UL epoxy soaking dish. All teflon
in glass.

 
 SD1.jpgSD2.jpgSD3.jpg 
  12366   Wed Aug 3 15:35:19 2016 AakashUpdateGeneralAcromag Setup | SURF2016Lydia helped me to troubleshoot the Accromag
connection problems which I was facing previously. 
If power goes off/turned off manually, the
  
  12368   Wed Aug 3 16:34:59 2016 LydiaUpdateGeneralAcromag Setup | SURF2016Actually, if the power goes off and back
on, the ethernet connection comes back online
after about 5 seconds, or faster if it is
  
  12374   Thu Aug 4 17:29:17 2016 PrafulUpdateGeneralGuralp CableThe Guralp cable has been pulled and put
in the corner to the left of the water cooler:

 
 13932028_1768980090054533_2094690556_o.jpg 
  12376   Thu Aug 4 17:57:09 2016 KojiConfigurationGeneralDon't restart apache2 - nodus /etc/apache2/sites-available/* accidentally deleted Late coming elog about the deletion
of the apahce config files


Thu Aug 4 8:50ish
  
  12387   Tue Aug 9 15:50:30 2016 PrafulUpdateGeneralGuralp CableThe Guralp cable has been reconnected and
powered after having the connector changed
out.
  
  12393   Wed Aug 10 17:20:16 2016 LydiaUpdateGeneralSeismometer channel names changed[ericq, Lydia]

We
changed the seismometer channel names from,
  
  12394   Wed Aug 10 17:30:26 2016 Max IsiUpdateGeneralSummary pages statusSummary pages are currently empty due to a
problem with the code responsible for locating
frame files in the cluster. This should be
  
  12399   Thu Aug 11 11:09:52 2016 Max IsiUpdateGeneralSummary pages statusThis problem has been fixed. 

> Summary pages are currently empty due to
  
  12432   Tue Aug 23 09:50:17 2016 Max IsiUpdateGeneralSummary pages down due to cluster maintenance Summary pages down today due to schedulted
LDAS cluster maintenance. The pages will
be back automatically once the servers are
  
  12440   Thu Aug 25 08:19:25 2016 Max IsiUpdateGeneralSummary pages down due to cluster maintenance The system is back from maintenance and
the pages for last couple of days will be
filled retroactively by the end of the week.
  
  12477   Wed Sep 7 18:00:47 2016 LydiaUpdateGeneralAcromag Progress[Teng, Lydia]

We
would like to establish a system for setting
  
  12481   Sat Sep 10 14:26:01 2016 ranaUpdateGeneralPRM SRM alignmentFor the PRM, I aligned it until the arm
flashes were maximized and the REFL camera
showed a centered spot with dips happening
 Osamu.JPG 
  12482   Mon Sep 12 17:15:22 2016 JohannesUpdateGeneralPRM SRM alignment[Gautam, Steve, Johannes]

We put on the remaining heavy doors
on the chambers (ITMY, ITMX,ETMX, in this
 IMG_3273.JPGIMG_3275.JPG 
  12485   Mon Sep 12 20:19:25 2016 LydiaUpdateGeneralMC REFL beam splitter not replacedThe
beam splitter that directs light into the
MC REFL photodiode has not been replaced;
  
  12489   Tue Sep 13 19:02:56 2016 TengUpdateGeneralITMX sensor[Lydia,Teng]

Something strange happened to the
ITMX osem reading around 4.pm. PDT as shown
 47.png34.png 
  12491   Wed Sep 14 09:33:54 2016 SteveUpdateGeneralITMX magnets are stuckedI believe that the UR and LR magnets are
stuck. There was no earth quake at 16:18
yesterday. Something had to kick it into
 ITMXmagStuck.png 
  12493   Wed Sep 14 19:41:23 2016 JohannesUpdateGeneralPSL back to high powerToday's summary:


Replaced mirror in MC REFL
path with R=10% BS and aligned beam on PD
  
  12494   Wed Sep 14 20:05:32 2016 LydiaUpdateGeneralITMX magnets are stuckedWhen I restarted c1susaux yesterday, I
didn't know that I needed to disable
the coil outputs first. So when it came back
  
  12500   Fri Sep 16 19:48:52 2016 LydiaUpdateGeneralAlignment statusToday the Y arm was locking fine. The alignment
had drifted somewhat so I ran the dither
and TRY returned to ~0.8. However, the mode
  
  12506   Mon Sep 19 13:57:21 2016 ranaUpdateGeneralnever post EPS files in the ELOG. Ever.http://tex.stackexchange.com/questions/2092/which-figure-type-to-use-pdf-or-eps   
  12507   Mon Sep 19 22:03:10 2016 ericqUpdateGeneralFurther recovery progress[ericq, Lydia, Teng]

Brief summary of this afternoon's
activities:
  
  12508   Tue Sep 20 10:45:06 2016 ranaUpdateGeneralFurther recovery progressRana suspicious. We had arms locked before
pumpdown with beams on Transmon PDs. If they're
off now, must be beams are far off on the
  
  12510   Wed Sep 21 01:08:02 2016 ericqUpdateGeneralFurther recovery progressThe misalignment wasn't as bad as I
had intially feared; the spot was indeed
pretty high on ETMX at first. Both transmon
  
  12511   Wed Sep 21 09:04:57 2016 SteveUpdateGeneral8 hours recovery progressGood 8 hours




 8hrs.png 
  12512   Thu Sep 22 15:44:21 2016 SteveUpdateGeneralITMX magnets are stucked again 

 
 StuckAgain.png 
  12513   Thu Sep 22 20:01:47 2016 LydiaUpdateGeneralITMX freed, all optics kickedRana came by and freed ITMX again. I think
it shouldn't be a problem for me to free
it if it happens again. 
  
  12514   Thu Sep 22 20:18:27 2016 LydiaUpdateGeneralAcromag ProgressWe moved the Acromag and its power supply
to the X end, where we connected it to the
diagnostic output of the NPRO controller.
  
  12515   Thu Sep 22 22:52:08 2016 ericqUpdateGeneralDamping found to be onJust a heads up, it looks like the damping
came on at around 8:30pm. Not sure why. 
  
  12521   Wed Sep 28 04:27:33 2016 ericqUpdateGeneralmucking aboutPMC was terribly misaligned. The PMCR camera
seems to have drifted somewhat off target
too, but I didn't touch it.
 alscheck.pdfweird_olpit.pdf 
  12522   Thu Sep 29 09:49:53 2016 ranaUpdateGeneralmucking aboutWith the WFS and OL, we never have figured
out a good way to separate pit and yaw. Need
to figure out a reference for up/down and
  
  12524   Thu Sep 29 20:21:29 2016 JohannesUpdateGeneralYARM loss measurement[Gautam, Johannes]

I scripted a series of YARM DC
reflectivity measurements last night alternating
  
  12527   Sat Oct 1 10:03:28 2016 ericqUpdateGeneralmucking aboutSome things I did last night:

I measured the X PDH OLG, and turned
the gain down by ~6dB to bring the UGF back
  
  12528   Mon Oct 3 21:24:02 2016 JohannesUpdateGeneralXARM loss measurement[gautam, johannes]

I started a script on Friday night
to collect some data for a reflection armloss
 ReflectionLoss.pdf 
  12529   Tue Oct 4 02:59:48 2016 ericqUpdateGeneralmucking about[ericq, gautam]

We poked around trying to figure
out the X PDH situation. In brief, the glitchiness
 2016-10-04_ALSXspectra.pdf 
  12531   Tue Oct 4 22:18:24 2016 JohannesUpdateGeneralX/YARM loss measurement[gautam, johannes]

We let the PSL shutter closed overnight
and observed the POXDC, POYDC and ASDC offsets.
 anomalousData.png 
  12533   Wed Oct 5 19:10:04 2016 gautamUpdateGeneralArm loss measurement review[ericq,gautam]

There are multiple methods by which
the arm loss can be measured, including,
  
  12534   Wed Oct 5 19:43:13 2016 gautamSummaryGeneralVent reviewThis elog is meant to review some of the
important changes made during the vent this
summer - please add to this if I've forgotten
  
  12545   Mon Oct 10 18:34:52 2016 gautamUpdateGeneralPZT OM MirrorsI did a quick survey of the drive electronics
for the PZT OM mirrors today. The hope is
that we can correct for the clipping observed
  
  12554   Wed Oct 12 18:09:25 2016 LydiaUpdateGeneralAcromag Progress[Lydia, Johannes]

Johannes acquired a crate to contain
the Acromag setup and wiring, and installed
  
  12555   Wed Oct 12 22:51:26 2016 KojiUpdateGeneralClipping could not be improved by the PZTs - NEED ANOTHER VENT[Gautam Koji]

We engaged the HV driver
to the output port PZTs, hoping to mitigate
  
  12557   Thu Oct 13 09:30:38 2016 SteveUpdateGeneralvent 79 is happening


 vent79precond.pngventing.png 
ELOG V3.1.3-