40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 139 of 357  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  10330   Mon Aug 4 18:25:46 2014 JenneUpdateGeneralChronic Suspension ProblemsQ is working on fixing the "save offsets"
script for the ASS, because that has lost
me my alignment two more times in the last
  
  10333   Tue Aug 5 19:05:41 2014 AkhilUpdateGeneralBeat Note Testing on EPICS Channels    
  10334   Tue Aug 5 19:20:05 2014 AkhilUpdateGeneralPID loop Design for beat note stabilization Today I and EricQ went inside the
lab and set up the cables running from the
a DAC channel into  PZT input so that
  
  10336   Wed Aug 6 10:10:45 2014 HarryUpdateGeneralWeekly Plan 8.6.14Last Week
 
Took first round of PER measurements
  
  10347   Thu Aug 7 14:50:43 2014 HarryUpdateGeneralPER Measurement Purpose
I wanted to do a more robust measurement
of PER of PM fibers for FOL, so I thought
 PERFinalSetup.pngPDCalibration.pngPolarization_Intensity_Variation.pngExtrema.pngPEReport.zip 
  10349   Thu Aug 7 17:09:53 2014 HarryUpdateGeneralAUX Coupling In Progress I'm currently in the process of coupling
dumped SHG light from the Y arm end table
into fibers for FOL.
  
  10353   Fri Aug 8 14:42:41 2014 AkhilUpdateGeneralPID loop Design for beat note stabilization The attached in a zip file are the
Simulink feedback loop models for the FOL
for both X and Y ends. The controller PID
 PID.zip 
  10357   Fri Aug 8 19:42:59 2014 JenneMetaphysicsGeneralkitchen sink flooding When I got back to the lab, there
was enough water that it was seeping under
the wall, and visible outside. Physical plant
  
  10358   Fri Aug 8 20:22:12 2014 JenneMetaphysicsGeneralkitchen sink water off

    

       
            
  
  10360   Sun Aug 10 00:54:54 2014 HarryUpdateGeneralAUX CoupingThe Y End laser dumped SHG light has been
coupled into the yellow fiber that terminates
at the PSL table.
  
  10367   Tue Aug 12 02:09:39 2014 ericqUpdateGeneralReasonable alignment restoredI took over the IFO, after Jenne's locking
efforts, which included manual alignment,
since the ASS was doing bad things. 
  
  10369   Tue Aug 12 14:29:01 2014 ericqUpdateGeneralReasonable alignment restored

    

       
            
 OLtrend.png 
  10371   Tue Aug 12 23:07:24 2014 HarryUpdateGeneralPSL TelescopeI put the PSL telescope in place, and started
coupling to it.
Unfortunately, I was only able to
 PSLTelescopePic.png 
  10372   Wed Aug 13 03:03:37 2014 ericqUpdateGeneralGreen beatnote troubles[Jenne, Rana, ericq]
No luck locking tonight, as spent
a while trying to figure out the complete
  
  10373   Wed Aug 13 10:49:39 2014 HarryUpdateGeneralWeekly Update In the past week, I designed and
assembled coupling telescopes for the PSL
and Y Arm Lasers
  
  10376   Wed Aug 13 16:12:55 2014 HarryUpdateGeneralFOL Layout DiagramPer Q's request, I've made up a diagram
of the complete FOL layout for general reference.
 FOLLayout2.png 
  10377   Wed Aug 13 17:37:43 2014 JenneUpdateGeneralGame plan   2014_Aug_13.pdf 
  10382   Thu Aug 14 02:51:46 2014 JenneUpdateGeneralGame plan[Jenne, Rana]
* Decided that earlier mode hop scan
won't give us the information that we were
 Y_ALS_FINE_PHASE_OUT_noisy_13Aug2014.pdf 
  10383   Thu Aug 14 14:58:03 2014 JenneUpdateGeneralUpdated game plan   2014_Aug_14.pdf 
  10385   Thu Aug 14 15:42:29 2014 KojiUpdateGeneralUpdated game plan - ALS
End PDH UGF improvement / post mixer
LPF investigation (with in 2 weeks)
  
  10386   Thu Aug 14 15:51:37 2014 JenneUpdateGeneralUpdated game plan

    

       
            
  
  10387   Thu Aug 14 18:02:11 2014 KojiUpdateGeneralUpdated game planGot the idea of ASC.
- Oplevs for PR2, PR3 => PR2 seems
OK. PR3 almost impossible. well
  
  10388   Thu Aug 14 18:05:05 2014 JenneUpdateGeneralUpdated game plan

    

       
            
  
  10389   Thu Aug 14 18:10:46 2014 HarryUpdateGeneralFiber Temperature Effects SetupPurpose
We want to characterize the sort
of response the fibers have to temperature
 tempAffectsSetup.zip 
  10400   Fri Aug 15 13:29:31 2014 JenneUpdateGeneralGame plan: 15 Aug   40mToDoList.pdf 
  10403   Fri Aug 15 17:24:44 2014 HarryUpdateGeneralFiber Temp. Earlier today Q and I somewhat resurrected
my old PER measurement setup so I could run
the temperature characterization experiment.
  
  10404   Fri Aug 15 20:26:37 2014 ericqUpdateGeneralGame plan

    

       
            
  
  10405   Fri Aug 15 20:38:17 2014 ericqUpdateGeneralELOG dump A few things that I have neglected
to ELOG yet:

    
    scripts/offsets/LSCoffsets
  
  10423   Fri Aug 22 13:51:00 2014 JenneUpdateGeneralUpdated game plan   40mToDoList.pdf 
  10435   Thu Aug 28 08:31:16 2014 SteveUpdateGeneralone good day   1goodDay.png1gooday.png 
  10440   Tue Sep 2 16:22:24 2014 JenneUpdateGeneralGame plan: 2 SeptSlightly updated Game Plan.  Mostly,
Q is continuing to check out the Xend PDH
box saturation, and I am thinking on what
 40mToDoList.pdf 
  10445   Wed Sep 3 14:07:18 2014 ranaConfigurationGeneralnetgpibdata is working again now

    

       
            
  
  10505   Mon Sep 15 14:37:49 2014 SteveUpdateGeneralOphir pmeter has no filter already

    

       
            
  
  10515   Wed Sep 17 18:36:03 2014 KojiHowToGeneralHow to run DTT measurement automatically
    Suppose you have a dtt template
name test.xml
    The file test.dtt
    
  
  10528   Tue Sep 23 17:56:13 2014 Jenne, EricQUpdateGeneralVent prep for SRC length changeAs Q mentioned in elog
10527, (prompted by Koji's email this
afternoon) we are prepping the IFO for vent.
  
  10529   Wed Sep 24 08:39:32 2014 Jenne, EricQUpdateGeneralVent prep for SRC length change

    

       
            
  
  10534   Wed Sep 24 18:17:46 2014 ericqUpdateGeneralAlignment RestoredInterferometer
alignment is restored
ASS has been run on each arm, recycling
  
  10535   Wed Sep 24 18:56:45 2014 ericqUpdateGeneralOttavia slownessOttavia was having some severe interaction
latency today. Xorg was taking up >90%
of the CPU, just sitting around. The machine
  
  10541   Thu Sep 25 19:42:12 2014 ericqUpdateGeneralVent progress[q, Jenne, Manasa]
ELOG Outline

    Aligned arms
  
  
  10544   Fri Sep 26 12:25:34 2014 ericqUpdateGeneralVent progressI figured out that didn't change the initial
guess for the fit routine in Gabriele's code.
I also changed the fminsearch criteria to
  
  10545   Fri Sep 26 16:10:14 2014 ericqUpdateGeneralVent updateToday so far:

    I moved SRM forward by
3mm
    Then I leveled the ITMY
  
  10546   Fri Sep 26 17:13:39 2014 ericqUpdateGeneralVent update

    

       
            
  
  10549   Mon Sep 29 12:47:51 2014 ericqUpdateGeneralVent update

    

       
            
  
  10550   Mon Sep 29 17:10:51 2014 ericqUpdateGeneralVent updateEverything is aligned, AS and POY make
it out of vacuum unclipped, OSEM readings
look good.
  
  10551   Mon Sep 29 18:12:24 2014 ericqUpdateGeneralVent updateI closed the PSL shutter as we didn't want
to burn the mirror surface when we are not
working.
  
  10552   Tue Sep 30 11:53:29 2014 ericqUpdateGeneralVent update 
Photos have been taken of the ITMY
chamber, and uploaded to picasa. Here's a
  
  10567   Mon Oct 6 10:04:58 2014 manasaUpdateGeneralUnexpected power shutdownWe had a unexpected    
  10569   Mon Oct 6 10:28:18 2014 manasaUpdateGeneralUnexpected power shutdown

    

       
            
  
  10570   Mon Oct 6 11:09:52 2014 JenneUpdateGeneralUnexpected power shutdown: slow computersAs per other slow computers, which Chris
figured out in elog
10189, I added all the rest of the slow
  
  10571   Mon Oct 6 17:04:51 2014 ericqUpdateGeneralUnexpected power shutdownI brought back the PMC, MC and Arms.
PMC:

    Same as when we replaced
  
ELOG V3.1.3-