40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 139 of 344  Not logged in ELOG logo
Entry  Tue Jun 29 08:41:06 2010, steve, Update, MOPA, MOPA is dead laserisdead.jpg
Entry  Mon Oct 13 11:32:50 2008, Yoixhi, Update, PSL, MOPA is in trouble now powerdrop.png
    Reply  Mon Oct 13 13:56:03 2008, Yoichi, Update, PSL, MOPA is not that much in trouble now 
Entry  Tue May 26 17:05:44 2009, rob, Update, PSL, MOPA re-activated DSC_0513.JPGDSC_0517.JPG
    Reply  Tue May 26 17:34:14 2009, rob, Update, PSL, MOPA re-deactivated laser_temp.jpg
Entry  Fri May 22 17:03:14 2009, rob, steve, Update, PSL, MOPA takes a holiday 
Entry  Wed Jun 18 00:19:29 2008, rob, Update, PSL, MOPA trend MOPAtrend.png
Entry  Fri Nov 16 18:46:49 2007, steve, Bureaucracy, PSL , MOPA was turned off & on 
Entry  Fri Aug 29 15:01:45 2008, steve, Update, PSL, MOPA_HTEMP in increasing htcl.jpg
Entry  Mon Oct 6 10:00:49 2008, steve, Update, MOPA, MOPA_HTEMP is up htup.jpg
Entry  Fri Feb 6 16:23:54 2009, steve, Update, MOPA, MOPAs of 7 years  7ymopas.jpg
    Reply  Fri Apr 4 18:51:29 2014, ericq, Summary, LSC, MORE CARM related modeling 9x
    Reply  Sat Apr 25 22:17:49 2015, rana, Update, CDS, MXstream restart script working (beta) 
    Reply  Tue May 19 17:03:34 2015, Koji, Update, CDS, MXstream restart script working (beta) 
    Reply  Tue May 19 18:38:33 2015, rana, Update, CDS, MXstream restart script working (beta) 
Entry  Mon Dec 10 19:08:03 2007, tobin, Configuration, PSL, MZ 
Entry  Tue Aug 18 15:52:27 2009, Jenne, Update, PSL, MZ 
    Reply  Tue Aug 18 19:57:47 2009, rana, Jenne, Update, PSL, MZ MZ_RFAMmon_setup_small.jpgMZ_RFAMmon_SpecAnalyzer_small.jpgMZ_EOM_IRrefl2_small.jpg
Entry  Tue Oct 27 01:45:02 2009, rob, Update, Locking, MZ 
Entry  Fri Aug 7 11:39:13 2009, Alberto, Update, PSL, MZ Alignment 
Entry  Fri Dec 19 11:29:16 2008, Alberto, Yoichi, Configuration, MZ, MZ Trans PD 
Entry  Thu Oct 1 13:12:41 2009, Koji, Update, MZ, MZ Work from 13:00- 
Entry  Thu Mar 12 18:44:02 2009, Yoichi, Update, PSL, MZ aligned 
Entry  Mon Jun 30 15:08:52 2008, John, Summary, PSL, MZ alignment mzalign.png
Entry  Mon Jun 30 18:36:01 2008, Yoichi, Update, PSL, MZ alignment again 
Entry  Mon Aug 10 16:37:27 2009, rob, Update, PSL, MZ alignment touched 
Entry  Wed Oct 29 12:23:04 2008, Yoichi, Configuration, PSL, MZ alignment touched and the alarm level changed 
Entry  Mon Aug 10 15:24:17 2009, rob, Summary, PSL, MZ bad brokenMZpzt.png
    Reply  Mon Aug 10 15:56:12 2009, rob, Summary, PSL, MZ bad redux badMZtrans.png
Entry  Mon Nov 30 19:23:50 2009, Jenne, Update, MZ, MZ down 
    Reply  Wed Apr 17 00:43:38 2019, gautam, Update, Frequency noise measurement, MZ interferometer ---> DAQ 
    Reply  Thu Apr 25 03:32:25 2019, Anjali, Update, Frequency noise measurement, MZ interferometer ---> DAQ Time_domain_output.pdfFrequency_noise.pdfschematic_heterodyne_setup.pngNoise_budget_1_micron_in_Hz_per_rtHz.pdf
Entry  Tue Sep 29 10:44:29 2009, Koji, Update, MZ, MZ investigation 
Entry  Wed Oct 1 02:10:03 2008, rana, Update, IOO, MZ is going bad Untitled.pngUntitled.png
Entry  Fri Sep 5 08:34:03 2008, steve, Update, PSL, MZ locked mzhv.jpg
Entry  Tue Aug 11 01:21:55 2009, rob, Update, PSL, MZ needs some attention badMZservo.png
Entry  Mon Jul 7 13:49:27 2008, Yoichi, HowTo, PSL, MZ offset, gain tips 
    Reply  Thu Oct 1 09:36:09 2009, Koji, Update, MZ, MZ relocked (Re:suspention damping restored and MZ HV stuck) 
Entry  Thu Jan 3 09:12:59 2008, steve, Update, PSL, MZ servo mz1y.jpgmz40d.jpg
Entry  Tue Jul 1 11:57:24 2008, Yoichi, Configuration, PSL, MZ servo switch problem again 
    Reply  Tue Jul 1 16:48:42 2008, rob, john, Configuration, PSL, MZ servo switch problem resolved forever 
Entry  Tue Sep 29 12:47:08 2009, Koji, Update, MZ, MZ unlocked 
Entry  Thu Nov 20 09:37:39 2008, steve, Update, PSL, MZ vs temp mztemp.jpg
Entry  Sat Sep 26 13:55:20 2009, Jenne, Update, MZ, MZ was locked in a bad place 
    Reply  Tue Sep 29 18:21:41 2009, Koji, Update, MZ, MZ work done 
    Reply  Thu Oct 1 19:04:05 2009, Koji, Update, MZ, MZ work done (Re: MZ Work from 13:00-) MZ_PZT.pdf
    Reply  Tue Sep 29 21:37:09 2009, rana, Update, MZ, MZ work done : some noise checking fsm.pdf
    Reply  Tue Sep 29 21:51:32 2009, Koji, Update, MZ, MZ work done : some noise checking 
Entry  Thu Jan 22 11:54:09 2009, Alberto, Configuration, PSL, Mach Zehnder Output Beam QPD 
Entry  Tue Aug 18 01:16:01 2009, Jenne, Update, PSL, Mach Zehnder is realigned MachZehnderOptics2.pdf
ELOG V3.1.3-