40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 138 of 341  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  4120   Thu Jan 6 00:06:01 2011 JenneUpdateIOOMagical absorbing PZT mirror[Kiwamu, Jenne]
We have a measely 465mW going into
  
  3100   Wed Jun 23 11:25:14 2010 Katharine and SharmilaUpdateWIKI-40M UpdateMaglevWeekly update

Lab work
  
  3212   Wed Jul 14 01:05:27 2010 Sharmila,KatharineSummaryelogMaglevYesterday we hooked up the Quadrant Maglev
control to the power supply to test the components
in the Input/Output part of the circuit.
 P7120284.JPGP7120278.JPGP7120281.JPGP7140292.JPG 
  3250   Tue Jul 20 11:55:15 2010 Sharmila,KatharineUpdateelogMaglevWe plotted the transfer functions for the
maglev control circuit and compared them
with the plots from the spectrum 
 tf.pngP7140292.JPG 
  3305   Wed Jul 28 12:09:06 2010 Sharmila,KatharineUpdateWIKI-40M UpdateMaglevWe have modeled our maglev setup in simulink
but we have a few corrections to make since
the system goes into undamped oscillations
 Picture_1.png 
  14262   Mon Oct 22 15:19:05 2018 SteveUpdateVACMaglev controller servicedGautam & Steve,

Our controller is back with Osaka
maintenace completed. We swapped it in this
 our_controller_is_back.png 
  9550   Mon Jan 13 16:50:55 2014 SteveUpdateVACMaglev controller needs service

    

       
            
  
  9776   Wed Apr 2 16:34:15 2014 SteveUpdateVACMaglev controller needs service

    

       
            
  
  14189   Wed Aug 29 09:56:00 2018 SteveUpdateVACMaglev controller needs serviceTP-1 Osaka maglev controller  [ 
model TCO10M,  ser V3F04J07 ] 
needs maintenance. Alarm led  on indicating 
  
  9834   Mon Apr 21 10:14:00 2014 SteveUpdateVACMaglev controller serviced

    

       
            
 ourControllerBack560Hz.png 
  9782   Thu Apr 3 17:05:52 2014 SteveUpdateVACMaglev controller swapped

    

       
            
 loanerControllerIn.png 
  3431   Tue Aug 17 23:59:46 2010 KatharineUpdateelogMaglev updateKatharine, Sharmila

Update:  
 repulsiveforce.pngOSEMcalibration.pngOSEMslopes.png 
  2193   Fri Nov 6 12:56:30 2009 HaixingUpdateSUSMagnet has been levitated  

 DSC_0964.JPGblock_diagram.PNG 
  12328   Sun Jul 24 03:43:56 2016 ericqUpdateGeneralMagnet positioningWhen Koji and I were gluing magnets to
ETMY, we decided to position the side magnet
based on the empirically observed offsets
  
  1933   Fri Aug 21 17:28:50 2009 Kevin, ranaSummaryPEMMagnetic Field Measurements Around the Lab


 AC-field.pngDC-field.png 
  2307   Fri Nov 20 11:32:48 2009 HaixingUpdateSUSMagnetic levitationI added an integrator to increase
the gain at low frequencies (below 5 Hz).
In addition, I increased
 IntDiff.PNGS8007340.jpgS8007333.jpg 
  691   Thu Jul 17 16:39:58 2008 Max JonesUpdateDAQMagnetometer InstalledToday I installed the magnetometer near the
beam splitter chamber. It is located on the
BSC chamber at head height on the inner part
  
  2629   Mon Feb 22 21:07:26 2010 JenneUpdateCOCMagnets glued to ITMX[Kiwamu, Jenne]
The magnets + dumbbell standoffs
have been glued to ITMX.  We're waiting
  
  3777   Mon Oct 25 11:39:06 2010 JenneUpdateSUSMagnets glued to PRMThis morning I glued the magnets to the PRM.
 Now we wait, and tomorrow afternoon (at
the earliest), Suresh and I can balance the
 StatusTable.png 
  14628   Tue May 21 00:15:21 2019 gautamUpdateSUSMain objectives of vent achieved (?)Summary:


ETMY now shows four suspension
eigenmodes, with sensible phasing between
 etmy_oplevs_20190520.pdfETMY_cplxTF.pdfETMY_diagComp.pdfScreen_Shot_2019-05-21_at_12.37.08_AM.png 
  15279   Wed Mar 18 21:43:26 2020 gautamUpdateVACMain vol pressure jumpThere was a jump in the main volume pressure
at ~6pm PDT yesterday. The cause is unknown,
but the pressure doesn't seem to be coming
 VacPresJump.png 
  15280   Wed Mar 18 22:10:41 2020 KojiUpdateVACMain vol pressure jumpI was in the lab at the time. But did not
notice anything (like turbo sound etc). I
was around ETMX/Y (1X9, 1Y4) rack and SUS
  
  14436   Tue Feb 5 19:30:14 2019 gautamUpdateVACMain volume at 20 uTorrPumpdown looks healthy, so I'm leaving
the TPs on overnight. At some point, we should
probably get the RGA going again. I don't
 PD83.png 
  11346   Fri Jun 5 11:59:59 2015 ericqBureaucracyGeneralMaintenance Tasks, IFO upgradesAt wednesday's
meeting, Rana, Koji, Steve, and I started
making a list of maintenence tasks that should
  
  7075   Thu Aug 2 00:43:55 2012 JenneUpdateASSMajor cleanup of the ASS model[Jamie, Jenne]
We are trying to figure out what
the story is with the ASS, and in order to
  
  7081   Thu Aug 2 23:31:04 2012 JenneUpdateASSMajor cleanup of the ASS modelJamie re-redid the ASS model a few hours
ago.
I have just compiled it, and restarted
  
  4993   Tue Jul 19 23:39:11 2011 Jamie, JenneUpdateLSCMajor overhaul of LSC rack; binary switching of whitening filters now workingYesterday we started going through the
LSC binary whitening switching to make sure
the new switching control in the LSC model
  
  14930   Thu Oct 3 12:08:47 2019 gautamUpdateGeneralMake the Jenne-laser setup fiber-coupledI propose the following re-organization
of the PDFR measurement breadboard. We have
all the parts on hand, just needs ~30mins
 PDFR_tabletop.pdfIMG_8014.JPG 
  14931   Thu Oct 3 14:32:37 2019 ranaUpdateGeneralMake the Jenne-laser setup fiber-coupledI'm
curious to see if we really need the 1611,
or if we can calibrate the diode laser vs.
  
  14932   Thu Oct 3 14:54:33 2019 KojiUpdateGeneralMake the Jenne-laser setup fiber-coupledI'm afraid that the RF modualtion of
the laser is nonlinear and the electrical
and optical resoponse is dependent on the
  
  14934   Thu Oct 3 21:05:04 2019 aaronUpdateGeneralMake the Jenne-laser setup fiber-coupledI measured the RF response of the fiber-coupled
NewFocus 1611, calibrating out the cable
delay. The laser current was set to 20.0
 PD_response.pdf 
  14936   Thu Oct 3 23:15:39 2019 KojiUpdateGeneralMake the Jenne-laser setup fiber-coupledThe 1GHz PD has a bit more flat response,
but the laser and the driving network have
more frequency dependence as you saw.
  
  14937   Fri Oct 4 00:30:31 2019 gautamUpdateGeneralMake the Jenne-laser setup fiber-coupledI think the metric of interest here is
the consistency of the AC transimpedance
of the proposed new "Reference PD"
  
  14940   Fri Oct 4 14:25:59 2019 aaronUpdateGeneralMake the Jenne-laser setup fiber-coupledSummary:

The fiber-coupled
PD seems to have a factor of ~1.5 difference
in responsivity compared to the free-space
 PD_norm.pdfPD_AB.pdfJenneAM_fiberPD_cals.pdf 
  13120   Sat Jul 15 16:19:00 2017 gautamUpdateCamerasMakeshift PyPylonSome days ago, I stumbled upon
this github page, by a grad student at
KIT who developed this code as he was
 pyPylon_test.png 
  1132   Thu Nov 13 11:33:25 2008 AlbertoHowToTreasureMaking (good) Matlab figuresJust a little summary of some useful ways
to change plot settings in Matlab that I
wanted to share and remember for the future:
  
  175   Thu Dec 6 18:11:15 2007 robHowToComputer Scripts / ProgramsMaking DMF monitors
I was able to use the matlab compiler to
compile a version of the [B]linetracker[/B]
  
  14832   Tue Aug 6 14:55:23 2019 gautamUpdateCDSMaking Matlab R2015b the defaultML2013 is unable to open Simulink on any
of the workstations. We decided to make the
default version of Matlab R2015b (the default
 ML2015b.png 
  13845   Tue May 15 20:51:27 2018 gautamConfigurationElectronicsMaking PLL setup more permanent[jon, steve, gautam]

Some points which Jon will elaborate
  
  5558   Tue Sep 27 15:33:03 2011 JenneUpdateComputersMaking models, wreaking havoc[Jenne, Mirko, Den]
We have entered into an adventure
in model compiling.  What follows is
  
  13013   Thu May 25 16:42:41 2017 jigyasaUpdateComputer Scripts / ProgramsMaking pylon installation on shared directoryI have been working on interfacing with
the GigE’s. I went through Joe Be’s
paper and the previous elogs and verified
  
  13014   Thu May 25 18:37:11 2017 jigyasaUpdateComputer Scripts / ProgramsMaking pylon installation on shared directoryGautam helped me execute the commands mentioned
above and Pylon has now been installed
on the shared directory. We extracted the
  
  976   Mon Sep 22 15:02:45 2008 ranaFrogsTreasureMantis found outside the 40m door at night   mantis.JPG 
  5034   Mon Jul 25 23:43:20 2011 ManuelHowToElectronicsManual for 1201 Low Noise PreamplifierI found the manual for the Low Noise Preamplifier
Model 1201 at this
link and I attached it.
 ITHACO_1201_Instruction_&_Maintenance.pdfDSC_3249.png 
  14395   Thu Jan 10 11:32:40 2019 ChubUpdateVACManual valve interfaced with CDSConnected the manual gate valve status
indicator to the Acromag box this morning. 
Labeled the temporary cable (a 50' 9p
  
  5050   Wed Jul 27 15:49:56 2011 steveUpdateSAFETYManuel receives safety trainingOur surf student Manuel Marchiò
received 40m specific safety training today.
 P1080096.JPG 
  15743   Mon Dec 21 18:18:03 2020 gautamUpdateCDSMany model changesThe CDS model change required to get the
AS WFS signals into the RTCDS system are
rather invasive.
 CDSoverview.png 
  11479   Wed Aug 5 10:56:07 2015 ericqUpdateCDSMany models crashed Last night around 1AM, many of the the
frontend models crashed due to an ADC timeout.
(But none of the IOPs, and all the c1lsc
 crashes.png 
  6904   Mon Jul 2 18:28:09 2012 JenneUpdatePhotosMany photos takenMany photos were taken by many different
people....most of the fuzzy ones are by yours
truely (doing a reach-around to get to hard-to-reach
  
  15011   Mon Nov 4 19:02:25 2019 YehonathanUpdatePSLMapping the PSL electronicsI created a spreadsheet (Attached) by taking Koji's
c1psl sheet from slow_channel_list and filtering
out the channels that do not need an Acromag.
 PSL_Wirings_-_Sheet1_(1).pdf 
ELOG V3.1.3-