40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 134 of 344  Not logged in ELOG logo
    Reply  Thu Apr 21 21:24:41 2011, kiwamu, Update, LSC, demod board : new 90 deg splitter DSC_2949_ss.jpgDSC_2951.JPGDSC_2952_ss.jpg
    Reply  Thu Apr 21 21:46:22 2011, kiwamu, Update, LSC, demod board : new 90 deg splitter relativephase.png
Entry  Fri Apr 22 02:10:53 2011, Zach, Update, elog, restarted 
    Reply  Fri Apr 22 09:05:53 2011, Suresh, Update, RF System, RF Source Harmonics 
Entry  Fri Apr 22 09:25:43 2011, Suresh, Update, RF System, RF Source: Temperature sensor relocated P4220056.JPG
    Reply  Fri Apr 22 10:28:22 2011, rana, Update, RF System, RF Source Harmonics 
    Reply  Fri Apr 22 11:08:50 2011, kiwamu, Update, LSC, demod board AS11 : amplitude imbalance IQamplitude.png
Entry  Fri Apr 22 12:07:38 2011, josephb, steve, Update, CDS, Removed hanging D-sub to SCSI in 1X2 
Entry  Sun Apr 24 21:37:40 2011, kiwamu, Update, IOO, review of triple resonant EOM : model looks fine Input_impedance.pngEOMcircuitmodel.png
Entry  Mon Apr 25 22:38:49 2011, kiwamu, Update, LSC, prepration for DRMI : Y arm flashing 
Entry  Tue Apr 26 01:20:02 2011, rana, Update, Electronics, POX_11 debugging 
    Reply  Tue Apr 26 22:03:49 2011, rana, Update, Electronics, POX_11 debugging MM7.png
Entry  Tue Apr 26 22:56:01 2011, kiwamu, Update, LSC, c1iscaux2 and c1iscaux restrated 
Entry  Tue Apr 26 22:56:35 2011, Zach, Update, elog, restarted 
Entry  Wed Apr 27 15:34:38 2011, kiwamu, Update, Electronics, AS55 demod board with new 90 deg splitter : healthy 
    Reply  Wed Apr 27 17:38:01 2011, kiwamu, Update, Electronics, Re : AS55 demod board with new 90 deg splitter : healthy relativephase.pngIQamplitude.png
Entry  Wed Apr 27 18:14:48 2011, kiwamu, Update, LSC, preparation for DRMI locking : RF status RF_Work_Status.png
    Reply  Wed Apr 27 21:08:08 2011, rana, Update, LSC, AS11 AS11.png
    Reply  Wed Apr 27 21:19:25 2011, kiwamu, Update, LSC, LSC whitening for PD1-4 Screenshot-1.png
Entry  Thu Apr 28 06:46:30 2011, Suresh, Update, RF System, RF Source installed P4280064.JPG
Entry  Thu Apr 28 07:14:34 2011, Suresh, Update, RF System, RF Distribution box installed P4280066.JPG
Entry  Thu Apr 28 10:53:50 2011, josephb, Update, CDS, Adventures in Hyper-threading 
Entry  Thu Apr 28 12:25:11 2011, josephb, Update, CDS, Further adventures in Hyper-threading 
    Reply  Thu Apr 28 15:31:36 2011, kiwamu, Update, IOO, MC PDH lock : readjustment of demodulation phase DSC_2975_ss.jpg
Entry  Thu Apr 28 16:12:19 2011, josephb, jamie, Update, CDS, New CDS model SVN 
Entry  Thu Apr 28 22:38:38 2011, Aidan, Update, Green Locking, Electronics schematic for vertex beatbox Canvas_1.pngCanvas_2.png
Entry  Fri Apr 29 05:48:52 2011, kiwamu, Update, LSC, Y arm locked DSC_2978_ss.jpg
    Reply  Fri Apr 29 12:18:48 2011, kiwamu, Update, LSC, Y arm locked : details 
    Reply  Fri Apr 29 13:15:04 2011, kiwamu, Update, LSC, Y arm locked : details 
    Reply  Fri Apr 29 13:58:36 2011, rana, Update, LSC, Y arm locked : details 
    Reply  Fri Apr 29 14:36:36 2011, josephb, steve, Update, CDS, Removed hanging D-sub to SCSI in 1X5 P1070621.JPG
Entry  Fri Apr 29 18:24:05 2011, Suresh, Update, RF System, RF system: 1X2 Rack cabling P4290070.JPG
Entry  Sat Apr 30 00:15:26 2011, kiwamu, Update, SUS, DRMI prep : suspension diagnostic 
    Reply  Sat Apr 30 05:14:33 2011, Koji, Update, Green Locking, Electronics schematic for vertex beatbox freq_divider.png
    Reply  Mon May 2 11:14:27 2011, kiwamu, Update, SUS, script : opticshutdown 
Entry  Mon May 2 12:51:52 2011, kiwamu, Update, LSC, PRMI locking : plan 
    Reply  Mon May 2 13:30:13 2011, kiwamu, Update, SUS, PRMI locking prep: PRM oplev 
    Reply  Mon May 2 15:53:27 2011, kiwamu, Update, LSC, PRMI locking prep : demodulation boards RF_Work_Status.png
Entry  Mon May 2 17:10:55 2011, steve, Update, SUS, PRM oplev 
    Reply  Mon May 2 18:16:24 2011, kiwamu, Update, LSC, PRMI locking : status update 
Entry  Mon May 2 21:14:55 2011, kiwamu, Update, Electronics, too loose Heliax connectors on 1Y2 rack DSC_2982_ss.jpgDSC_2984_ss.jpg
    Reply  Mon May 2 23:29:57 2011, Suresh, Update, Electronics, too loose Heliax connectors on 1Y2 rack 
    Reply  Tue May 3 03:53:20 2011, kiwamu, Update, LSC, PRMI locking : done PRMI_locking.png
Entry  Tue May 3 04:09:53 2011, Koji, Update, LSC, REFL55 PD update REFL55.pdf
Entry  Tue May 3 05:32:04 2011, kiwamu, Update, LSC, daytime tasks 
    Reply  Tue May 3 10:21:25 2011, Koji, Update, LSC, daytime tasks 
Entry  Tue May 3 10:41:35 2011, josephb, Update, CDS, Morning maintenance 
Entry  Tue May 3 10:59:31 2011, josephb, Update, CDS, 1Y2 binary output adapter board now powered 
    Reply  Tue May 3 11:49:03 2011, Koji, Update, LSC, daytime tasks 
Entry  Tue May 3 13:22:13 2011, Leo, Update, SUS, Re: DRMI prep : suspension diagnostic 10x
ELOG V3.1.3-