40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 133 of 346  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  10185   Fri Jul 11 15:29:26 2014 HarryUpdateGeneralTelescope With Collimator I used a la mode to make a design
for the coupling telescope with a 3.3um target
waist, that included the collimator in the
 telescope_2.ziptelescopeWCollimator.png 
  10204   Tue Jul 15 18:26:40 2014 HarryUpdateGeneralBeam Waist, Telescope, and Fiber Coupling Goal
To design an optical setup (telescope
/ lens) to couple 1064nm NPRO light into
 fiberTestingSetup.pngfiberTestingCouplingDesign.pngfiberTesting.zip 
  10205   Tue Jul 15 18:39:04 2014 HarryUpdateGeneralWeekly Plan (7.16.14) The Past Week
 
Attempted to design coupling telescope,
  
  10213   Wed Jul 16 01:54:25 2014 NichinUpdateGeneralWork plan for next week1) Debugging transimpedance calculations
in the PDFR
Requires
  
  10215   Wed Jul 16 07:51:52 2014 AkhilUpdateGeneralWeekly UpdateWork
Done:

    Solved all the timing
  
  10218   Wed Jul 16 17:34:11 2014 HarryUpdateGeneralFiber Coupled Purpose
To couple the spare NPRO into our
Panda PM980 fibers, in order to carry out
 fiberTestCouplingSchematic.png 
  10230   Thu Jul 17 17:08:58 2014 HarryUpdateGeneral1X2 Rack Changes Purpose
 
Steve and I moved some things around
 1X2Changes.png 
  10233   Thu Jul 17 21:01:28 2014 ManasaUpdateGeneral1X2 Rack Changes

    

       
            
  
  10234   Thu Jul 17 22:08:14 2014 KojiUpdateGeneral1X2 Rack ChangesIt sounds like the work was done carefully.
Even so, Jenne or Manasa have to run the
ALS (X and Y) to check if they are still
  
  10240   Sat Jul 19 01:59:34 2014 HarryUpdateGeneralFiber Mode MeasurementPurpose 
We wanted to measure the mode coming
out of the fibers, so we can later couple
 fiberModeMeasurement.pngfiberModeMeasurement1.pngfiberModeMeasurement1.zip 
  10244   Mon Jul 21 10:30:38 2014 HarryUpdateGeneralFiber Mode Measurement Purpose
The idea was to measure the profile
of the light coming out of the fiber, so
 fiberModeMeasurement.pngfiberModeFit2.pngfiberModeMeasurement2.zip 
  10249   Mon Jul 21 18:08:19 2014 HarryUpdateGeneralFiber Mode Measurement

    

       
            
 fiberModeMeasurement3.png 
  10255   Tue Jul 22 16:26:04 2014 HarryUpdateGeneralFiber Mode MeasurementI repeated this process once more, this
time using the computer controlled stage
that the beam profiler is designed to be
 fiberModeProfile3.pngfiberModeMeasurement4.zip 
  10256   Tue Jul 22 17:45:11 2014 HarryUpdateGeneralWeekly Update The Past Week
 
I spent the past week coupling NPRO
  
  10257   Tue Jul 22 23:10:12 2014 AkhilUpdateGeneralWeekly Update Work
Done
  
  10260   Wed Jul 23 10:40:23 2014 NichinUpdateGeneralWeekly UpdateTo do:


   Measure and calibrate out  attenuation
and phase changes due to RF cables in the
  
  10264   Wed Jul 23 17:54:51 2014 HarryUpdateGeneralCoupling Improvements plus PER Measurement Setup Purpose
We wanted to improve the coupling
into the fibers, because it's very rarely
 PERSetup.png 
  10268   Thu Jul 24 09:18:15 2014 SteveUpdateGeneralfour days   4days.png 
  10271   Thu Jul 24 17:37:19 2014 HarryUpdateGeneralCoupling Improvements plus PER Measurement Setup

    

       
            
  
  10272   Thu Jul 24 19:28:43 2014 AkhilUpdateGeneralThermal Actuator Transfer Functions As a part of temperature actuator
characterization, today Eric Q and I made
some measurements for the open loop TF of
 TF-X-ARM.pdfTF-Y-ARM.pdf 
  10273   Fri Jul 25 17:28:31 2014 HarryUpdateGeneralFOL Box and PER Update Purpose
We're putting together a box to go
into the 1X2 rack, to facilitate the frequency
 FOLBox.png 
  10274   Sat Jul 26 10:12:19 2014 AkhilUpdateGeneralData Acquisition from FC into EPICS Channels I succeeded in creating a new channel
access server hosted on domenica ( R Pi)
for continuous data acquisition from the
  
  10275   Sat Jul 26 13:10:14 2014 AkhilUpdateGeneralThermal Actuator Transfer FunctionsKoji said that the method we used for X-arm
thermal actuator TF measurement was not correct
and suggested us to make measurements separately
 TFX_new.pdf 
  10276   Sat Jul 26 13:38:34 2014 JamieUpdateGeneralData Acquisition from FC into EPICS Channels

    

       
            
  
  10277   Sat Jul 26 14:35:28 2014 AkhilUpdateGeneralData Acquisition from FC into EPICS Channels

    

       
            
  
  10281   Mon Jul 28 16:34:02 2014 AkhilUpdateGeneralCalibration of measured Thermal Actuator TFs To calibrate the measured TFs and
characterize the thermal actuator for the
FOL loop, we [ Me, Eric Q, Koji ] made the
 mirrorTF2.pdf 
  10282   Mon Jul 28 17:25:32 2014 HarryUpdateGeneralFiber Mode With Collimators Purpose
We want a measurement of the fiber
modes at either end, with the collimators,
 end1Profiles.pngend2Profiles.pngFiberModeWCollimators.zip 
  10283   Mon Jul 28 17:53:00 2014 AkhilUpdateGeneralWork plan for the Upcoming weeks- FOL Project [Akhil, Harry]
Work
Completed
  
  10287   Tue Jul 29 18:52:42 2014 HarryUpdateGeneralPSL and AUX Coupling Waist Measurement//edit Manasa//  Harry will update
this elog with before/after pictures of the
table and power of the 1064nm rejected beam
 9x 
  10289   Tue Jul 29 19:00:40 2014 HarryUpdateGeneralWeekly Plan (7.29.14) The Past Week
In the past week, I have improved
the coupling in the fiber testing setup on
  
  10297   Wed Jul 30 11:15:44 2014 AkhilUpdateGeneralWeekly Update Plan for the week:

    PID loop design and testing
with the Green laser beat note by actuating
  
  10298   Wed Jul 30 15:33:48 2014 AkhilSummaryGeneralCalibrated Thermal Actuator TFs The goal of the measurements we made
( my previous 3 elogs) was to characterize
the laser frequency thermal actuator that
 Y_Arm_TA_TF.pdfX_Arm_TA_TF.pdfY_Arm_TA_with_fit.pdfX_Arm_TA_with_fit.pdf 
  10299   Wed Jul 30 18:09:08 2014 HarryUpdateGeneralAUX and PSL Coupling Telescopes Purpose
These telescopes will be used to
mode match//couple the dumped SHG light from
 PSLTelescope.pngAUXTelescope.pngtelescopes.zipAUXTelescopePlot.pngPSLTelescopePlot.png 
  10301   Wed Jul 30 23:12:05 2014 KojiUpdateGeneralIFO patrol- The cable for the beat note was disconnected
from the frequency counter and reconnected
to the spectrum analyzer.
  
  10308   Thu Jul 31 15:25:51 2014 HarryUpdateGeneralPolarizationExtinction Ratio of Fibers Purpose
We wanted to measure the PER of the
polarization maintaining fibers, so we could
 PERSetup.pngPERBeamPower.png 
  10312   Thu Jul 31 21:59:25 2014 KojiBureaucracyGeneralAntsDon't leave your
food on tables and desks!
Also I put the souvenir chocolates
 P7316690.JPG 
  10318   Fri Aug 1 03:49:26 2014 KojiSummaryGeneralKoji - to do- Put the circuit diagram of the
sum amp on/in the circuit enclosure and associate
it with an elog [done].
  
  10325   Fri Aug 1 22:56:27 2014 KojiUpdateGeneralBeam lost in the chamber???I was investigating several issues on the
IFO. As many of you noticed and not elogged,
ITMX had frequent kicking without its oplev
  
  10326   Sun Aug 3 17:19:32 2014 ericqUpdateGeneralRecovery efforts[ericq, Jenne]
We both happened to come by today
to fix things up.
  
  10327   Sun Aug 3 23:47:56 2014 KojiUpdateGeneralRecovery effortsIt's great that you guys found the beam.

Yes, ITMX kick and lost communication
  
  10329   Mon Aug 4 17:30:00 2014 ericqUpdateGeneralChronic Suspension ProblemsTRX and TRY communication were recovered
by doing a simultaneous reboot of all of
the frontends.
  
  10330   Mon Aug 4 18:25:46 2014 JenneUpdateGeneralChronic Suspension ProblemsQ is working on fixing the "save offsets"
script for the ASS, because that has lost
me my alignment two more times in the last
  
  10333   Tue Aug 5 19:05:41 2014 AkhilUpdateGeneralBeat Note Testing on EPICS Channels    
  10334   Tue Aug 5 19:20:05 2014 AkhilUpdateGeneralPID loop Design for beat note stabilization Today I and EricQ went inside the
lab and set up the cables running from the
a DAC channel into  PZT input so that
  
  10336   Wed Aug 6 10:10:45 2014 HarryUpdateGeneralWeekly Plan 8.6.14Last Week
 
Took first round of PER measurements
  
  10347   Thu Aug 7 14:50:43 2014 HarryUpdateGeneralPER Measurement Purpose
I wanted to do a more robust measurement
of PER of PM fibers for FOL, so I thought
 PERFinalSetup.pngPDCalibration.pngPolarization_Intensity_Variation.pngExtrema.pngPEReport.zip 
  10349   Thu Aug 7 17:09:53 2014 HarryUpdateGeneralAUX Coupling In Progress I'm currently in the process of coupling
dumped SHG light from the Y arm end table
into fibers for FOL.
  
  10353   Fri Aug 8 14:42:41 2014 AkhilUpdateGeneralPID loop Design for beat note stabilization The attached in a zip file are the
Simulink feedback loop models for the FOL
for both X and Y ends. The controller PID
 PID.zip 
  10357   Fri Aug 8 19:42:59 2014 JenneMetaphysicsGeneralkitchen sink flooding When I got back to the lab, there
was enough water that it was seeping under
the wall, and visible outside. Physical plant
  
  10358   Fri Aug 8 20:22:12 2014 JenneMetaphysicsGeneralkitchen sink water off

    

       
            
  
ELOG V3.1.3-