40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 131 of 171  Not logged in ELOG logo
Entry  Mon Apr 12 17:48:32 2010, Aidan, Update, Computer Scripts / Programs, elog restarted 
Entry  Mon Apr 12 16:20:05 2010, Alberto, Configuration, 40m Upgrading, REFL55 improved 2010-04-12_REFL55_TF_model_to_meas_comparison.png
Entry  Sun Apr 11 13:51:04 2010, Alberto, Omnistructure, Computers, Where are the laptops? 
    Reply  Sun Apr 11 19:05:34 2010, Koji, Omnistructure, Computers, Where are the laptops? 
Entry  Wed Apr 7 10:48:04 2010, Alberto, Update, Electronics, REFL11 Noise Simulation rfpd11_testinput_noiseplot.pdf
    Reply  Wed Apr 7 10:58:15 2010, Koji, Update, Electronics, REFL11 Noise Simulation 
       Reply  Wed Apr 7 11:11:19 2010, Alberto, Update, Electronics, REFL11 Noise Simulation rfpd11_testinput_noiseplot.pdf
Entry  Wed Apr 7 09:00:01 2010, steve, HowTo, PEM, prepare to open chamber 0.5micron.jpg
Entry  Tue Apr 6 22:54:34 2010, Koji, Update, SUS, ITMY (south) aligned IMG_2362.jpg
Entry  Mon Mar 29 21:43:27 2010, Alberto, Configuration, PSL, Reference Cavity PD Noise Spectrum 2010-03-29_FSS_PD_shotnoise_and_darknoise.png2010-03-29_FSS_PD_shotnoise_and_darknoise.png
    Reply  Tue Mar 30 06:37:32 2010, rana, Configuration, PSL, Reference Cavity PD Noise Spectrum rc.png
       Reply  Wed Mar 31 15:31:53 2010, steve, Update, PSL, Reference Cavity RF PD base upgraded brspdbs.JPG
    Reply  Sat Apr 3 11:35:47 2010, rana, Configuration, PSL, Reference Cavity PD Noise Spectrum 
       Reply  Sat Apr 3 16:07:40 2010, Alberto, Configuration, PSL, Reference Cavity PD Noise Spectrum 2010-03-29_FSS_PD_shotnoise_and_darknoise.png
          Reply  Tue Apr 6 11:27:11 2010, Alberto, Update, Computer Scripts / Programs, Data formats in the Agilent AG4395a Spectrum Analyzer 
             Reply  Tue Apr 6 16:55:28 2010, Alberto, Update, Computer Scripts / Programs, Data formats in the Agilent AG4395a Spectrum Analyzer 
Entry  Mon Apr 5 13:52:45 2010, Alberto, Update, Computers, Front-ends down. Rebooted 
    Reply  Mon Apr 5 14:10:06 2010, steve, Update, SUS, sus damping restored  
Entry  Mon Apr 5 10:33:12 2010, Alberto, Omnistructure, Electronics, soldering iron broken 
    Reply  Mon Apr 5 13:07:36 2010, Jenne, Omnistructure, Electronics, soldering iron broken 
    Reply  Mon Apr 5 13:20:16 2010, Koji, Omnistructure, Electronics, soldering iron broken weller_tips.jpg
Entry  Mon Apr 5 09:48:57 2010, Koji, Update, SUS, ITMs placed on the tables in the chambers 
    Reply  Mon Apr 5 11:39:41 2010, steve, Update, SUS, ITM-south installation 
Entry  Mon Apr 5 10:23:40 2010, Alberto, Update, 40m Upgrading, REFL11 Low Frequency Oscilaltion Reduced 2010_04_05_REFL11_darknoise_with_100uH_coil_10ohm_res.png2010_04_05_REFL11_darknoise_wide_freq_window_lid_open-closed.png2010_04_05_REFL11_darknoise_wide_freq_window_lid_open-closed.png
Entry  Mon Apr 5 08:43:48 2010, steve, Update, PEM, earthquake mag 7.2 eq7.2.jpg
Entry  Wed Feb 24 16:11:15 2010, Jenne, Update, PEM, Seismic witnesses near MC1 tank moved 
    Reply  Sun Mar 7 23:05:39 2010, rana, Update, PEM, Seismic witnesses near MC1 tank moved seis.png
       Reply  Mon Mar 8 18:15:27 2010, rana, Update, PEM, Styrofoam Cooler on the Seismos SeismometersHuddled.jpg
          Reply  Tue Mar 9 12:06:53 2010, rana, Jenne, Update, PEM, Styrofoam Cooler on the Seismos 
             Reply  Wed Mar 10 15:02:58 2010, rana, Update, PEM, Styrofoam Cooler on the Seismos Seismic-Ref_100310.pngUntitled.gif
                Reply  Sat Mar 13 21:30:22 2010, rana, Update, PEM, Styrofoam Cooler on the Seismos Untitled.png
                   Reply  Mon Mar 15 16:39:36 2010, steve, Update, PEM, Guralp2 centered grlp2ffst.jpg
                      Reply  Thu Mar 18 08:49:51 2010, steve, Update, PEM, Guralp2 centered again ? grlp2xadj.jpg
                         Reply  Fri Mar 19 18:00:14 2010, jenne, Update, PEM, Guralp2 centered again 
                            Reply  Fri Mar 19 21:15:33 2010, rana, Update, PEM, Guralp2 centered again Untitled.png
                            Reply  Fri Mar 19 23:03:41 2010, rana, Update, PEM, Guralp2 centered again huddlez.png
                               Reply  Sun Mar 21 19:25:29 2010, rana, Update, PEM, Guralp2 centered again huddlez.png
                               Reply  Thu Mar 25 09:07:08 2010, steve, Update, PEM, Guralp2 x problem is back grlp2xproblm.jpg
                                  Reply  Wed Mar 31 16:31:44 2010, steve, Update, PEM, Guralp interface box turned off grlpntrfcbxoff.jpg
                                     Reply  Mon Apr 5 01:02:07 2010, rana, Update, PEM, Guralp interface box turned off Untitled.png
Entry  Sun Apr 4 00:21:42 2010, rana, koji, Summary, Electronics, Checkout of EG&G (PARC) preamp model #113, s/n 49135 IMG_0628.JPG
    Reply  Sun Apr 4 17:32:07 2010, Alberto, Metaphysics, General, new y-arm? 
Entry  Sat Apr 3 19:54:19 2010, Alberto, Update, 40m Upgrading, REFL11 and REFL55 PDs Noise Spectrum 2010-04-03_REFL11_darknoise.png2010-04-03_REFL55_darknoise.png
Entry  Fri Apr 2 08:52:21 2010, Alberto, Update, elog, elog restarted 
Entry  Thu Apr 1 20:29:02 2010, Hartmut, Update, Green Locking, simple PD test circuit pdtest.png
Entry  Thu Apr 1 17:35:24 2010, Koji, Update, SUS, Working on ITMX/Y IMG_2353.jpg
Entry  Thu Apr 1 16:34:29 2010, Hartmut, Update, Green Locking, Silicon PDs 
Entry  Sun Mar 28 17:28:26 2010, matt, kiwamu, Update, Green Locking, frequency discriminator for green PLL 6x
    Reply  Mon Mar 29 15:19:33 2010, mevans, Update, Green Locking, frequency discriminator for green PLL 
       Reply  Wed Mar 31 02:57:48 2010, kiwamu, Update, Green Locking, frequency counter for green PLL FCnoise.png
          Reply  Wed Mar 31 12:30:31 2010, rana, Update, Green Locking, frequency counter for green PLL 
          Reply  Thu Apr 1 15:21:12 2010, rana, Update, Green Locking, frequency counter for green PLL 
Entry  Wed Mar 31 19:29:58 2010, Hartmut, Update, Electronics, (1cm-) Si PD transfer functions update 
Entry  Wed Mar 31 16:55:05 2010, josephb, Update, Computers, 2 computers from Alex and Rolf brought to 40m 
Entry  Tue Mar 30 21:11:42 2010, kiwamu, Summary, Green Locking, conversion efficiency of PPKTP efficiency_waist_edit.png
    Reply  Tue Mar 30 22:13:49 2010, Koji, Summary, Green Locking, conversion efficiency of PPKTP 
       Reply  Wed Mar 31 11:52:32 2010, kiwamu, Summary, Green Locking, Re:conversion efficiency of PPKTP 
Entry  Wed Mar 31 10:34:02 2010, josephb, Update, elog, Elog not responding this morning 
Entry  Mon Mar 29 15:26:47 2010, Mott, HowTo, Computers, New script for controlling the AG4395A 
    Reply  Wed Mar 31 03:45:49 2010, Mott, HowTo, Computers, New script for controlling the AG4395A noisy_spec.png
Entry  Tue Mar 30 11:16:05 2010, josephb, HowTo, Computers, ezca update information (CDS SVN) 
Entry  Sat Mar 27 16:23:10 2010, Koji, Update, SUS, another SRM sidemagnet glued 
    Reply  Mon Mar 29 18:50:14 2010, Koji, Update, SUS, PRM sidemagnet glued StatusTable.png
Entry  Mon Mar 29 18:41:34 2010, Koji, Configuration, SUS, Started to build TTs IMG_2348.jpg
Entry  Sun Mar 28 20:00:17 2010, rana, Update, Cameras, GigE camera no work from screen Untitled.png
    Reply  Mon Mar 29 10:40:59 2010, josephb, Update, Cameras, GigE camera no work from screen 
Entry  Sun Mar 28 20:05:33 2010, rana, Summary, PSL, FSS Work from Sunday: AOM/VCO level set wrong Untitled.png
    Reply  Sun Mar 28 20:51:31 2010, rana, Summary, PSL, FSS Work from Sunday: Cavity Suspension is Ridiculously Undamped! Untitled.png
       Reply  Sun Mar 28 23:17:46 2010, rana, Summary, PSL, FSS Work from Sunday: noise spec in2.png
          Reply  Sun Mar 28 23:47:47 2010, rana, Summary, PSL, FSS Work from Sunday: Open Loop Gain fssloop.pngsweep2.png
             Reply  Mon Mar 29 01:11:33 2010, rana, Summary, PSL, FSS Work from Sunday: RF Out Spectrum rfout.pngTEK00000.PNGTEK00001.PNGTEK00002.PNG
             Reply  Mon Mar 29 02:07:50 2010, Koji, Summary, PSL, FSS Work from Sunday: Open Loop Gain 
Entry  Mon Mar 29 01:45:26 2010, daisuke, Configuration, General, Periscope version B for green laser ... 40m_periscope_B.png40m_periscope_B_100329.pdf40m_periscope_B_dwg_100329.zip
Entry  Fri Mar 26 10:48:35 2010, steve, Update, SAFETY, safety glasses measured P1060188.JPGP1060199.JPG
Entry  Thu Mar 25 17:32:42 2010, Alberto, Update, 40m Upgrading, REFL55 Upgraded 2010-03-25_REFL55_model_to_meas_comparison.png2010-03-25_REFL55_model_to_meas_comparison.png
Entry  Thu Mar 18 10:46:51 2010, Koji, Update, ABSL, PLL reconstructed 
    Reply  Thu Mar 18 12:27:56 2010, Alberto, Update, ABSL, PLL reconstructed 
       Reply  Thu Mar 18 13:40:35 2010, Koji, Update, ABSL, PLL reconstructed 
          Reply  Thu Mar 18 21:42:26 2010, Koji, Update, ABSL, PLL reconstructed 
             Reply  Mon Mar 22 22:11:26 2010, Mott, Update, ABSL, PLL reconstructed IMG_0150.JPG
                Reply  Mon Mar 22 23:37:32 2010, Mott, Update, ABSL, PLL reconstructed 2010-03-22_23.14.00.jpg2010-03-22_23.24.50.jpg
                   Reply  Tue Mar 23 18:44:46 2010, Mott, Update, ABSL, PLL reconstructed NPRO_PLL_freqresp.png
                      Reply  Wed Mar 24 03:58:18 2010, kiwamu, matt, koji, Update, Green Locking, leave PLL locked DSC_1402.JPG
                         Reply  Wed Mar 24 04:22:51 2010, kiwamu, matt, Update, Green Locking, two NPRO PLL  
                            Reply  Wed Mar 24 14:52:02 2010, Alberto, Update, Green Locking, two NPRO PLL  
                         Reply  Wed Mar 24 15:59:59 2010, kiwamu, matt, Update, Green Locking, leave PLL locked 
                            Reply  Thu Mar 25 17:29:48 2010, kiwamu, mott, Update, Green Locking, PLL two NPROs 
Entry  Tue Mar 23 22:46:43 2010, Alberto, Update, 40m Upgrading, REFL11 upgraded 2010-03-23_REFL11_model_to_meas_comparison.png
    Reply  Wed Mar 24 14:57:21 2010, Alberto, Update, 40m Upgrading, REFL11 upgraded 
Entry  Wed Mar 24 12:40:25 2010, daisuke, Configuration, General, Periscope for green laser delivery from the BSC to PSL table 40m_periscope.png40m_periscope_A_100329.pdf40m_periscope_A_dwg_100329.zip
Entry  Wed Mar 24 12:38:17 2010, Hartmut, Configuration, Green Locking, Broadband PD for green PLL SiAmpl.pngSiPhase.png
Entry  Tue Mar 23 00:31:51 2010, Koji, Update, IOO, MC realigned IMG_2346.jpgIMG_2347.jpg
    Reply  Tue Mar 23 09:37:36 2010, steve, Update, IOO, vac envelope has to be sealed as antproof for overnight pc3.JPGpc4.JPG
       Reply  Tue Mar 23 09:55:20 2010, Koji, Update, IOO, vac envelope has to be sealed as antproof for overnight 
          Reply  Wed Mar 24 02:06:24 2010, Koji, Update, IOO, vac envelope has to be sealed as antproof for overnight 
Entry  Tue Mar 23 15:38:26 2010, Alberto, Update, elog, elog just restarted  
Entry  Tue Mar 23 10:11:13 2010, steve, Update, PEM, small air cond unit failed yesterday 20datm.jpg
Entry  Mon Mar 22 16:57:45 2010, josephb,daisuke, alex, Configuration, Computers, Megatron test points working again 
Entry  Mon Mar 22 11:37:09 2010, steve, Update, PEM, jackhammering jackhammering2.jpg
Entry  Mon Mar 22 02:03:57 2010, rana, Summary, Electronics, UPDH Box #17: Ready 
    Reply  Mon Mar 22 10:07:30 2010, Koji, Summary, Electronics, UPDH Box #17: Ready 15V_power_supply.pdf
Entry  Sun Mar 21 20:08:20 2010, kiwamu, rana, Update, PSL, EOM wasit size waist.pngwaist.py.zip
    Reply  Sun Mar 21 21:02:39 2010, Koji, Update, PSL, EOM waist size 
Entry  Thu Mar 18 15:33:17 2010, kiwamu, Summary, Electronics, advantege of our triple resonant EOM electrode.png
    Reply  Thu Mar 18 19:00:04 2010, Koji, Summary, Electronics, advantege of our triple resonant EOM 
       Reply  Sat Mar 20 18:34:19 2010, kiwamu, Summary, Electronics, RE:advantege of our triple resonant EOM 
Entry  Tue Mar 16 09:37:30 2010, steve, Update, SUS, eq 4.4 seen by oplevs and osems opleveq4.4.jpgeq4.4.jpgopleveq4.4d3.jpg
Entry  Tue Mar 16 04:22:02 2010, Jenne, Update, Environment, Earthquake, Mag 4.4  EQ_16Mar2010.png
    Reply  Tue Mar 16 05:10:39 2010, koji, Update, Environment, Earthquake, Mag 4.4  100316_MC_SUS.png
Entry  Mon Mar 15 09:43:47 2010, steve, Update, PEM, more sandblasting today 
Entry  Sun Mar 7 07:01:21 2010, rana, Update, WienerFiltering, Guralp Huddle Test software huddlez.png
    Reply  Sat Mar 13 22:16:03 2010, rana, Update, WienerFiltering, Guralp Huddle Test software guralpznoise.png
Entry  Fri Mar 12 17:08:22 2010, steve, Configuration, VAC, bg-RGAscan at d18 bg-d18_20100312scan.png
ELOG V3.1.3-