40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 130 of 341  Not logged in ELOG logo
Entry  Thu Feb 17 11:49:48 2011, josephb, Update, CDS, Front end start/stop scripts go to /scripts/FE again 
I modified the core/advLigoRTS/Makefile to once again place the startc1SYS and killc1SYS scripts in the scripts/FE/ directory.
It had been reverted in the SVN update.
Entry  Thu Feb 17 11:51:14 2011, josephb, Update, CDS, Lockin filter names too long - broke loading 
Problem:
Could not load filters into the C1:SUS-ETMX_LOCKIN1_SIG filter bank.
Reason:
Entry  Thu Feb 17 13:20:06 2011, Suresh, Update, VIDEO, Some more labels 
[Larisa, Kiwamu, Steve and Suresh]
 
  We continued the labeling of video cables. All exiting cables which are going to be used used in the new scheme have been labeled.
Entry  Thu Feb 17 14:17:27 2011, Suresh, Update, Electronics, RF Distribution box and REFL11 
 
The Distribution box is several steps nearer to completion.
 
    Reply  Thu Feb 17 14:52:27 2011, Jenne, Update, IOO, MC alignment work 
I worked a little bit more on optimizing the mode matching to the MC, but it's still not great.  I've only gotten a visibility of ~45%, but Koji
said that it used to be ~87%.  So there is a long way to go.  Kiwamu said he can work with the lower-power configuration for a few days, and
so my next step will be to measure the beam profile (stick a window in the path, and look at the refl from the window....that way we don't get thermal
    Reply  Thu Feb 17 23:11:40 2011, rana, Update, Electronics, VCO Frequency Noise Measurement with the MFD vco.png
This is the 140 ft. MFD measurement of the VCO phase noise. It is open loop and so should be a good measurement. The RMS is 30 Hz integrated down
to 2 mHz.
I don't know why this doesn't agree with Suresh's measurements of the same thing which uses the PLL feedback method.
Entry  Thu Feb 17 23:56:53 2011, josephb, Update, CDS, Daqd was rebuilt, now reverted. 
As one of the trouble shooting steps for the daqd (i.e. framebuilder) I rebuilt the daqd executable.  My guess is somewhere in the build code is
some kind of GPS offset to make the time correct due to our lack of IRIG-B signal.
The actual daqdrc file was left untouched when I did the new install, so the symmetricom gps offset is still the same, which confuses me.
    Reply  Fri Feb 18 00:13:55 2011, kiwamu, Update, CDS, Re:Daqd was rebuilt, now reverted. 
THANK YOU, JOE !!!  



    
        
 
Entry  Fri Feb 18 13:41:22 2011, josephb, Update, CDS, CDS fixes 
I talked to Alex today and had two things fixed:
First the maximum length of filter names (in the foton C1SYS.txt files in /chans) has been increased to 40, from 20.  This does not increase
EPICS channel name length (which is longer than 20 anyways).
Entry  Fri Feb 18 15:05:49 2011, kiwamu, Update, Green Locking, transfer function of angle to beat note (length)  a2l_TF.png
[Koji and Kiwamu]
 We took transfer functions (TF) from the angle excitations at
ETMX and ITMX to the green beat note signal (i.e. angle to length TF).
Entry  Fri Feb 18 17:52:25 2011, josephb, valera, Update, CDS, c1ass updated c1ass_updated.png
We updated the c1ass model to include the BS.  We removed the dither excitation of the PZTs.  PZT control
goes to epics. To do this, modified the /cvs/cds/caltech/target/c1iscaux/PZT_AI.db file.  We basically have it sum both the existing
epics slider and our new output from c1ass. 
Entry  Sat Feb 19 05:25:20 2011, Suresh, Update, Electronics, RF: Distribution box 
Most of the RF cables required for the box are done.   There are two remaining and we will attend to these tonight. 
We expect to have finished the mechanical assembly by Sunday and start a quality test on Monday.
 
Entry  Mon Feb 21 11:05:51 2011, Zach, Update, elog, restarted 
 I restarted the elog using the script.
Entry  Tue Feb 22 00:41:34 2011, Suresh, Update, Electronics, RF Distribution box: assembly completed 
The mechanical assembly of RF distribution box is 99% complete.  Some of the components may be bolted to the teflon base plate if needed. 
All RF cables and DC voltage supply lines have been installed and tested.  I removed the terminal block which was acting as a distribution
box for the common zero voltage line.  Instead I have used the threaded holes in the body of each voltage regulator.   This allows us to keep
    Reply  Tue Feb 22 11:53:38 2011, steve, Update, Electronics, RF Distribution box: assembly completed 


    
        
            Quote:
        
        
            
            The mechanical assembly of RF distribution box is 99% complete.  Some of the components may be bolted to the
Entry  Tue Feb 22 14:37:24 2011, steve, Update, SAFETY, Larisa received 40m safety training 
Larisa Thorne received 40m lab specific, basic safety training. She will attend P. King's  Basic Laser Safety Training Session tomorrow.
 
Entry  Tue Feb 22 23:11:42 2011, valera, Update, , new medm screens: C1ASS.adl and C1MCASS.adl C1MCASS.jpegC1ASS.jpeg
 
Entry  Tue Feb 22 23:40:31 2011, Koji, Update, IOO, MC mode mach improvement IOO_MMT_110222.png
As per Kiwamu's request I made a light touch to the input steering and the mode matching lens.
Here V_ref and V_trans are C1:IOO-MC_RFPD_DCMON and C1:IOO-MC_TRANS_SUM, respectively.
Result: Visibility = 1 - V_ref(resonant) / V_ref(anti_reso) = 1 - 0.74 / 5.05 = 85%
Entry  Wed Feb 23 04:56:59 2011, kiwamu, Update, Green Locking, noise curve update noise_suprresion.png
New noise spectra of the green locking have been updated.
The plot below shows the in-loop noise
spectra when the beat signal was fedback to ETMX.
Entry  Wed Feb 23 08:53:58 2011, Suresh, Update, Electronics, RF Distribution box: Output power levels RF_Distribution_box_23rdFeb.jpg
We wish to have roughly 2 dBm of output power on each line coming out of the RF distribution box.  So I adjusted the attenuators inside the box
to get this.
I also looked at why the 2x output looked so distorted and found that the input power was around 17 dBm whereas the maximum allowed (as per the
Entry  Wed Feb 23 11:53:30 2011, josephb, Update, CDS, Updated mx drivers 
Alex and I updated the open mx drivers from 1.3.3 to 1.3.901 (1.4 release candidate).  We downloaded the drivers from:
http://open-mx.gforge.inria.fr/
We put them in /root/open-mx-1.3.901 on the fb machine (and thus get mounted by all the front ends.).  We did configure and make and make
Entry  Wed Feb 23 16:56:17 2011, Larisa Thorne, Update, VIDEO, Cable laying...continued 
Having finished labeling the existing cables to match their new names, we (Steve, Kiwamu and Larisa) moved on to start laying new cables and labeling
them according to the list.
 
Entry  Thu Feb 24 00:54:33 2011, Kevin, Update, Electronics, Calculated Dark Noise for POX and POY 
[Kevin, Rana, Koji]
I calculated the dark noise of POX and POY due to Johnson noise and voltage and current noise from the MAX4107 op-amp using nominal values for
the circuit components found in their data sheets. I found that the dark noise should be approximately 15.5 nV/rtHz. The measured dark noise values are
Entry  Thu Feb 24 10:56:04 2011, Jenne, Update, WienerFiltering, One month of H1 S5 data is now on Rossa 
Just in case anyone else wants to access it, we now have 30 days of H1 S5 DARM data sitting on Rossa's harddrive.  It's in 10min segments. 
This is handy because if you want to try anything, particularly Wiener Filtering, now we don't have to wait around for the data to be fetched from elsewhere.
Entry  Thu Feb 24 11:18:08 2011, steve, Update, SUS, SRM sus-cables P1070428.JPG
Cheater cables   for SRM sus tied up. They were dangling aimlessly on the floor.
Entry  Thu Feb 24 17:42:00 2011, Aidan, Update, Green Locking, 15% of end laser sideband power transmitted through cavity 
I did a quick calculation to determine the amount of sideband transmission through the FP cavity.
The modulation frequency of the end PDH is 216kHz. The FSR of the cavity is about 3.9MHz. So the sidebands pick up about 0.17 radians extra phase
on one round trip in the cavity compared to the carrier.
Entry  Thu Feb 24 18:21:24 2011, kiwamu, Update, Green Locking, in-loop and out-of-loop measurements green_lock_setup.pngmeasurement1.pngTRX_REFL11.pngmeasurement2.png
Two different measurement have been performed for a test of the green locking last night.
Everything is getting better. yes. yes.
    Reply  Thu Feb 24 19:59:25 2011, kiwamu, Update, Green Locking, whitening filter for ALS ACDC.png
I forgot to mention about the whitening filter for the ALS digital control system.
As usual I used a whitening filter to have a good SNR against ADC noise, but this time our whitening scheme is little bit different from the
usual our systems.
Entry  Thu Feb 24 21:46:30 2011, kiwamu, Update, Green Locking, installed a summing box summing_box.pngtransfer_func.png
In this past weekend I replaced a summing amplifier for the end green PDH locking by a home-made summing circuit
box in order to increase the control range.
It's been working well so far.
Entry  Fri Feb 25 01:48:54 2011, valera, Update, ASC, mc auto alignment status mcditherlines.pdfmcdecenter.pdfmcmirror.pdf
 I made several scripts to handle the mcass configuration and sensing measurements:
- The scripts and data are in the scripts/ASS directory
- The mcassUp script restores the settings for the digital lockins: oscillator gains, phases,
Entry  Fri Feb 25 10:11:56 2011, steve, Update, SAFETY, how not to Presentation1.jpg
The beam of IR for doubling  is clipping on bnc cable to green beam transmitted pd.
Entry  Fri Feb 25 14:35:06 2011, Larisa Thorne, Update, Electronics, Total harmonic distortion results for +7dBm mixer THDcircuit.jpgPhoto_on_2011-01-17_at_12.25.pngTHDwithoutamp.pdf
 This experiment deals with measuring the total harmonic distortion (THD) contribution
of mixers in a circuit.




Entry  Sat Feb 26 00:25:38 2011, Koji, Update, IOO, MC servo improvement fss_servo.pngmc_servo.png
[Rana / Koji]
The MC servo loop has been investigated as the MC servo was not an ideal state.
With the improved situation by us, the attached setting is used for the MC and the FSS.
    Reply  Sat Feb 26 02:33:16 2011, kiwamu, Update, Green Locking, sidebands on beatnote beat_note.png
 The power ratio of
the beatnote signal vs. the 216kHz sideband has been measured.
The measured ratio was -55 dB, which is smaller by about 20 dB than Aidan's
    Reply  Sun Feb 27 09:43:59 2011, Aidan, Update, Green Locking, sidebands on beatnote 
Can we set up a fiber-PD on the end table to look at the beat between the "end laser IR beam" and the "PSL IR beam fiber-transmitted end
beam"? 
We should see the same thing on that PD that we see on the green PD (plus any fiber noise and I'm not really sure how much that'll be off the top
    Reply  Sun Feb 27 13:09:56 2011, rana, Update, Green Locking, sidebands on beatnote 
When Koji and I were massaging the MC, we noticed that the oscillations were at 48.5 kHz. They were pretty huge and are probably what you're seeing on
the beat. My guess is that they are the PZT resonances of the PSL 2W NPRO; we need to put a notch in the FSS box - it still has the notch from the old
NPRO.
Entry  Tue Mar 1 08:42:18 2011, Aidan, Update, elog, Restarted the elog this morning Zombie.gif
 The elog was dead this morning. I reanimated it. It is now undead.
    Reply  Wed Mar 2 04:01:51 2011, Koji, Update, IOO, MC servo improvement IMG_3904.jpgMC_OLTF.pdf
[Koji / Rana]
- Since the MC servo had UGF up to ~20kHz and huge servo bump at 50kHz, we needed more phase between 20kHz to 100kHz.
- Today a phase compensation filter in a Pomona box has been inserted between the MC servo box and the FSS box. 
Entry  Wed Mar 2 18:08:43 2011, Aidan, Update, Green Locking, Ghost beams on green Ghost_Beam_at_ETM_DCBS.pdf
Kiwamu and I noticed that there is a ghost beam on the green beam going into the ETM. What we see is some interference fringes on the edge of the transmission
of the green beam through the dichroic beam splitter (DCBS). If we look at the reflection from the dichroic beam splitter these are much more pronounced.
The spacing of the fringes (about 2 per 10mm) indicates an angle between the fields of around 0.1 mrad.
Entry  Wed Mar 2 22:04:22 2011, Kevin, Update, Electronics, POY Shot Noise Measurement 
The previous measurement for the shot noise of POY had the dark noise at ~100 nV/rtHz. I redid the measurement and got 26 nV/rtHz for the dark noise.
I think that when I made the previous measurement, the spectrum analyzer had automatically added some attenuation to the input that I failed to remove.
This added attenuation raised the noise floor of the measurement making the dark noise of POY appear larger than it is.
Entry  Thu Mar 3 00:12:52 2011, kiwamu, Update, Green Locking, plan 
Tomorrow's tasks
  - Auto noise budget
(Jamie)
  - Demodulation phase adjustment (Kate)
 
- Auto alignment for green (Joe/Kiwamu)
  - ADC connection for the X end green REFL_DC
Entry  Thu Mar 3 07:25:24 2011, kiwamu, Update, Green Locking, screwed up the end PDH box 
 I somehow screwed up the PDH
box at the X end station. 
Right now it's not working,
Entry  Thu Mar 3 18:32:33 2011, Larisa Thorne, Update, Electronics, Harmonic distortion calculations for RF distribution box RFdistribboxcalcs.pdf
Finished calculations for harmonic distortion at each of the 10 outputs of the RF distribution box. The diagram can be found on Suresh's post  http://nodus.ligo.caltech.edu:8080/40m/4342
 
Entry  Fri Mar 4 03:31:35 2011, kiwamu, Update, Green Locking, A first noise budget noise_budget.png
I made a noise budget for the ALS noise measurement that I did a week ago (see #4352).
I am going to post some details about this plot later because I am now
too sleepy.
    Reply  Fri Mar 4 09:47:46 2011, Suresh, Update, Electronics, Harmonic distortion calculations for RF distribution box 
 
Fast work indeed! It would be nice if we could have the following details filled in as well
a) A short title and caption for the table, saying what we are measuring
Entry  Fri Mar 4 13:25:04 2011, Zach, Update, elog, restarted 
with script
    Reply  Fri Mar 4 18:06:34 2011, kiwamu, Update, Green Locking, noise budget : differential noise open_loop_TF.pngservos.png
Here I explain how I estimate the contribution from the differential noise shown in the plot on my last entry (#4376)
.
 
Entry  Mon Mar 7 17:22:39 2011, josephb, Update, CDS, New simulated plant work 
[Joe, Jamie]
We modified the c1scx model to have a switch to go between simulated and real plants.  The channel is currently C1:SCX-SIM_SWITCH.  
Entry  Tue Mar 8 06:29:06 2011, kiwamu, Update, Green Locking, Intensity noise setup 
[Jenne, Chris, Kiwamu]
 A photo diode and an AOM driver have been newly setup on the PSL table to measure the intensity noise
coupling to the beat note signal.
Entry  Tue Mar 8 14:50:19 2011, kiwamu, Update, CDS, names for filter modules 
[Joe/Kiwamu]
 We found there are
some filter names that we can not properly build for some reason. 
ELOG V3.1.3-